PROFESSION SUMMARY :
EPCI Company for Oil and Gas:
* ***** * ****** *********** work for EPCI Company such SCHNEIDER ELECTRIC FRANCE, SIEMENS Energy Oil and Gas, Wasco Engineering Indonesia as an EIT, ATEX Inspector. Contribute deliver Oil and Gas Modules with ZERO E& I Punchlist and without open NCR & SOR. Able to achieve 100% Target of MC-ITR submission to client.
EPCI Company for Renewable Energy:
2 Years’ experience work for EPCI Company for renewable energy at JANDENUL n.v as an EIT Inspector for FORMOSA 2 Wind Farm Project. Contribute deliver of 32 Transition Piece of Windfarm to Taiwan. Close all MC ITR, Final Walkdown Punchlist as well as NCR.
Completely review EIT Dossier.
Industrial Manufacturing Company:
8+ Years work as an Engineer and 2 Years as Production Supervisor experience in the Industrial Manufacturing which is able to improve the productivity up to 99.8% and reduce the quality issue below 0.2 % by providing effective problem-solving.
PASSPORT No.
B8938541 (Exp. 21/Feb./2023).
PLACE/DOB
Malang, 03/08/1976.
SEX
Male.
MARITAL STATUS
Married (2 Daugthers).
NATIONALITY
Indonesian.
COVID’19 VACCINATION STATUS.
Booster (3rd Shoot),WHO Approved Vaccinee.
LANGUAGE
Indonesia, English.
SOFTWARE SKILL
PDMS
Autocad
Navis Viewer
Microsoft Office
Aproplan / Let’s Build (Punchlist Record).
EDUCATION
Electronica Communication
By NATIONAL TECHNICAL HIGH SHOOL
Year 1993 ~ 1995.
Degree of Mechanical Engineering
By ABULYATAMA UNIVERSITY
Year 1996 ~ 2000, GPA 2.93.
PROFESIONAL TRAINING
EEHA
Preparation,Maintenance,Installation,Inspection in Hazardous Area.
CTE AUSTRALIA PTY LTD Year 2022 .
Cert. No. : COC22-4253 (Valid until Augst 2027)
COMPEX EX01~04 /ATEX (Renewal).
Preparation,Maintenance,Installation,Inspection in Hazardous Area.
By ATTS Singapore - JT Limited Year 2022 .
Cert. No. : 096774 (Valid until Feb 2027).
COMPEX EX01~04 /ATEX (Expired).
Preparation,Maintenance,Installation,Inspection in Hazardous Area.
By K2 Velosi Singapore - JT Limited / 2016.
Cert. No. : 55289 (Valid until May 2021).
Mechatronica (PLC,PNEUMATIC,MOTOR).
By BATAM POLYTECHNIC / 2009.
Cert No : 21/WD2-POLBAT/TR/I/2009.
E & I Inspector for Oil and Gas Industrial
By IKBAL M YOS BATAM / Year 2011.
Cert. No. : 220/Inst.XII/II/2011.
Quality (ISO 9001) and Environmental
Management System (ISO 14001) Trained as Internal Auditor.
By SURVEYOR INDONESIA/ Year 2012.
Cert. No. : CRT-220/SIBA-VII/IGT/2012.
EXPERTISE
Ex Device / Hazardous Area Inspection.
Drive Punchlist target 100% Closed.
Focus MC-ITR completion.
Submitte Site mark up to Engineering.
Provide Technical Advise to Sub.
Contractor.
Well understand of E & I Installation
and Inspection as per Project Spec. as
below Device / Equipment:
-Cable Dressing & Termination.
-FO Cable, Coax Cable, Cat. 5/6 Cable
-Cable Gland (CMP, Hawke)
-Cable Tray / Ladder (SS, Galvanized)
-Heat Tracing.
-UPS, Batteries and Chargers.
-Communication system.
-Switchgear.
-Control Panel LV, MV, HV.
-Busbar.
-Busduct.
-Transformer
-Tubings and fittings (Swagelok).
-Supports and Brackets.
-Lighting & Receptacle.
-Junction Boxes (IS,NIS).
-Grounding & Earthing (IE, ISE, PE).
-Lightning Protection.
-Penetration & MCT.
-Pressure Transmitter.
-Flow Transmitter.
-Temperature Transmitter.
-Level Transmitter.
-Gas Detector.
-Smoke Detector.
-Heat Detector.
-Flame Detector.
-Fire & Gas.
-Telecom.
-PAGA.
-CCTV.
-Sounder Beacon.
-Bolt Tightening & Torque.
-Loop / Continuity Test.
-Ductor Test.
-Megger Test.
-Hi-Pot Test.
-FAT.
-Davit Crane
-Vertical and Horizontal Radar
-Bird Monitoring System.
-FOG Horn.
-Structural Monitoring System
PROFESIONAL TRAINING
Cable Gland Installation.
By CMP / 2012.
No Certificate Number.
ASME B31.3 Fabrication – Assy. &Erec.
By OFFSHORE TECH. INSTITUTE / 2015.
Cert. No. : OTI.PE-XIII.01.15.183.
PIPING PROCESS ASME B31.3
By OFFSHORE TECH. INSTITUTE / 2015.
Cert. No. : OTI.PP-XIX.01.15.111.
PIPING DRAFTER
By FFSHORE TECH. INSTITUTE / 2015.
Cert No. : OTI.PDA-I.01.15.001.
HwkeICG653/Univ&501/453/Univ.
Ex d& Ex e Cable Gland Installation / 2015.
By HAWKE GLAND.
Pass No : 5820.
SCADA VIJEO CITECT
By BATAM POLYTECHNIC / 2016.
Cert. No. : 0004/TR/SCADASA-01/2016.
EXPEXTED SALARY
Negotiable at interview.
PROFESSIONAL REFERENCE
Availble on request.
OTHERS
All listed Certificates are available on request.
JOB EXPERIENCE
EIT Inspector(2 Years, March 2020 ~ April 2022).
JAN DE NUL n.v (SAIPEM - Tanjung Balai KarimunYard, Indonesia).
Project : Formosa 2 Offshore Windfarm (Taichung - Taiwan Sea)
Achievement :
Successfully Deliver 32 of 32 Transition Piece of Windfarm E&I Control System with Zero Punchlist.
Roles & Responsibility :
Material receiving Inspection.
Issuing OSDR report to Supplier when there is Non-Conformance with the Material receipted.
Site Inspection of EIT Installation trough ITR.
Raise Punch List, OSDR, NCR when there is deviation between IFC Drawing versus
actual Installation or Material receipt.
Final Walkdown Inspection before Load Out and record it on Aproplan Application.
Closely monitor ITR Index, Master Punchlist, OSDR to be closed by related party.
Coordinate with Logistic Department if there is Material issue or others.
Build Equipment Matrix to monitor the Material requirement versus received.
Periodically perform preservation inspection of EIT Device / Equipment either before and
after Installation follow as Vendor Drawing as well as IFC Drawing.
Witness Loop Test, Ductor Test, Megger Test, Hi-Pot Test Electrical Equipment Test.
Sent RFI to Client for join Inspection activities.
Perform Surveillances Inspection to monitor Construction activity follow as AFC Drawing.
Guide Production if any difficulties during construction stage and escalate to Engineering if
there is technical issue.
Giving input to ITP if it is not applicable or need to be revised for better ITP.
Check and Review EIT Dossier.
Manage material left over and arrange Material to be used for Carry Over Work on site.
EIT, ATEX Inspector (1 Year 11 Months, August 2017 ~ July 2019).
SCHNEIDER ELECTRIC FRANCE (at WASCO ENGINEERING INDONESIA Batam Yard).
Project : E-House TCO (Tengizchevron Oil) - FGP-WPMP
Achievement :
Successfully deliver E-House Module 3302-052, 3302-058, 3302-043,41-3301, 41-3302 For Kazakhstan with less carry over work except Site scope.
Roles & Responsibility :
Manage MC ITR Report Inspection Status base on priority system.
Attend / Witness Material Receiving Inspection invited by Sub Contractor (WASCO).
Issuing SOR, NCR to Sub-Contractor for Non-Conformance finding against the Project Spec.
Perform Surveillance Inspection during Construction activity.
Guide and Provide Solution to Sub-Contractor when there is problem during Construction
activity as per Project Specification.
Perform MC ITR Inspection on Hazardous Area (Ex) and Safe Area.
Witness Loop Test, Ductor Test, Megger Test, Hi-Pot Test conducted by Sub Contractor.
Report to QA/QC Manager for Inspection Activity.
Reply SOR and NCR from Client.
Sent RFI for MC ITR Inspection to Client.
Manage MRB prior to Loud Out Stage.
EIT, ATEX QC INSPECTOR (2 Year 2 Months, Feb. 2015 ~ April 2017).
SIEMENS ENERGY OIL & GAS, Indonesia.
Project: Top Site Sub-Station
Achievement :
Successfully deliver E-House JANGKRIK Module (Client STCJO, ENI) with less carry over work
Except Integration Scope.
Successfully deliver the Modules with ” ZERO” E & I Punch List YAMAL LNG Project (Client
YAMGAZ, YAMAL LNG) for SABETTA RUSSIA:
- BATCH#3, ESS-032 BOG Compressor Substation.
- BATCH#3, ESS-101 Train 1 North Train Substation.
- BATCH#3, ESS-104 Train 1 Compressor B Substation.
- BATCH#4, ESS-600 Fractionation 1 Substation.
- BATCH#4, PAB-205 Train 2 Compressor A Substation.
- BATCH#5, PAB-306 Train 3 Compressor A Substation.
Able to minimize the Punchlist raised by client by proper coordination of Inspection and
Verification during construction stage.
Roles & Responsibility :
Higlighted the problem earlier during Material Receiving Inspection to be comply with
Purchase order and project specification trough OS&D if found deviation.
Prevent the material having issue during installation By Ensuring the material has proper
Storage requirements and proper identified.
Proper Manage OS&D report to closed by Vendor to avoid delaying construction activities.
Fully implement of quality plan which include Inspection, Testing and proper documentation
and ensure that all works complied with client / contractor issued (IFC) drawing, applicable
standards and specification.
Prevent Safety issue by ensuring all related Inspection and Testing activities with regards to
Environment, Health & Safety procedures and maintenance rules are respected.
Monitor the performance of construction to ensure the respect of work standards and project
Specifications by perform proactive surveillance Inspection to minimize or avoid discrepancy
and non-conformance rectification cost and lost of time.
Able to coordinate and assist construction to resolve any encountered problems related to
Inspection and Testing activities to meet schedule and avoid any delay of activities.
Inspect and witness the construction works as per their approved Inspection Test Plan.
Well manage of RFI submited to client for witness and hold points in Inspection / Test.
Supervise and witness Continuity, Megger, Hi-Pot Tests for all cables.
Coordinate closely with Contractor to minimize work interference due to engineering or
construction quality problems if possible propose to Engineering for site mark IFC drawing.
EIT QC INSPECTOR (2 Years 10 Months, April 2012 ~ Feb. 2015).
WASCO ENGINEERING INDONESIA.
Project: Top Site Sub-Station
Achievement
Successfully deliver Modules with ” ZERO” E & I Punch List on various destination and
Complete Documents as below Project :
- GLNG Project for Prefabricated of Substations Building Package (Client Becthel & Siemens)
- E-HOUSE (Client CAIRN).
- E-HOUSE, Gas Metering, Lab and Ware House (Client ABB, MODEC).
- PETROBRAS GAS RE-INJECTION FPSO (Client MODEC).
- KRAKEN POWER GENERATOR FPSO (Client WARTSILA, BUMI ARMADA).
- KAOMBO E-HOUSE NORTH & SOUTH (Client SCHNEIDER, SAIPEM, TOTAL).
Roles & Responsibility :
Pro-active monitor all aspects of Quality Control relative to instrumentation and control
Equipment during construction and to ensure adherence to the Company technical
requirements and applicable codes.
Able to Provide expertise to site team to avoid / Resolve quality problems.
Provide early warning of potential quality problems and ensure non-conformances are
identified, tracked and closed.
Review and approve EPCI Contractor instrument work for all construction for quality and
Adherence to design requirements.
Review EPCI Contractor procedures, Inspection and Test Plans (ITPs) and other technical and
quality documents as required.
Ensures that all Testing requirements identified in Company specifications are addressed in all
EPCI Contractor ITPs.
Review and comment as necessary on EPCI Contractor deliverables related to ITPs.
Attend and witness Testing associated with Instrument and controls equipment and systems.
Typical Tests include loop checks, and other instrumentation and control QC activities as
designated on the approved Inspection Test Plan for the EPCI Contractor and their
subcontractors.
Verify that all Testing procedures have been approved and are on site. Confirm Testing
parameters are duly recorded and that Testing equipment is calibrated and certified
accurate.
Review or witness in-process and hold point Inspection during construction in accordance
with all EPCI Contractors ITP.
Witness acceptance Tests and final quality checks prior to acceptance as appropriate.
Verify all instrument and control systems are built in accordance to the design and verify
against approved drawings.
Ensure non-conformances are identified, tracked and closed out prior to acceptance of the
work.
Assist in Verification, Monitoring and Close-out of Punch List.
Review EPCI Contractors completion files Progressively for accuracy, legibility and
adequacy.ERIENCE 3 :
ENGINEER (10 Months, March 2011 ~ Jan. 2012)
PT. PHILIPS INDUSTRIES BATAM, Indonesia.
Achievement:
Able to provide Production smooth Process flow to meet on time delivery by 95%.
Roles & Responsibility :
Trouble shooting defect product and set Corrective Action and Preventive Action.
Success New Project Handling until mass production.
Temporary Acceptance Proposal.
Value Stream Mapping.
Implement Problem Solving trough FMEA & DOE Method.
Active Lean Manufacturing Activity.
PRODUCTION SUPERVISOR (1Year 9Months, Dec. 2008 ~ Sept. 2010)
PT. YOKOGAWA BATAM, Indonesia.
Achievement :
Improve productivity from 84% to 99.5%.
Roles & Responsibility :
Man Power / Job Balancing.
Manage Production Schedule follow correct sequence.
Closing of CAR and DOA (Quality issue from Customer).
Review sales and cost reduction achievement.
Supervise production operation.
Able Plan and execute as per Project Schedule.
Ensure readiness of material before execute the Plan.
ENGINEER (7 Years 7Months, May 2001 ~ Nov. 2008)
PT. YOKOGAWA BATAM, Indonesia
Achievement :
100% successfully DCS Project Transferred of from Singapore Factory to Batam Indonesia Factory.
Roles & Responsibility :
Trouble shooting of DCS Product Defect.
Automatic Test Equipment Trouble Shooting.
Set up Automation Production Line.
Supervise Inspection/Test and Witness to Instrument And Electrical Equipment installation
according to approved drawing.
Conduct audit for document/spec of E & I parts.
Assist the Plant Maintenance Manager to planning and scheduling maintenance process.
Review the Instrument and Electrical Equipment Test & Calibration Procedure.
Manage Instruments and spare parts to prevent Line down time especially critical item.
Maintain and build communication with Production Personnel and Client to address any
Equipment Issue.
Coordinate and supervise Maintenance Engineers activities in the line of installation,
Maintenance, diagnostic, calibration, and repair of Instrument and electronic Equipment,
Including Technical Documentation and Preparation.
HOME ADDRESS : Perum. Graha Nusa Batam, Blok J1-15, Batu Aji – Batam, Kepulauan Riau, Indonesia, Postal Code 29439