Synopsis Resume Of:
Drew Miladin
Aliquippa, Pa 15001
Cell: 724-***-****
********@*******.***
Summary Statement: I thrive in chaotic environments. I deliver practical solutions when faced with complex obstacles and can enhance any required stringent procedure into an effortless routine.
Summarized Work Experience: (details on page 2)
•AECOM/Shell Contractor ECU Furnace Cracker Scheduler 04-21 thru 3=22
•Beech Construction Scheduler 02-20 thru 04-21
•US Steel Caster Maintenance Planner 10-16 thru 02-20
•Walsh Manager for Operation Planning 02-16 thru 10-16
•Chevron Drilling & Completion Planner 03-13 thru 02-16
•Thyssen Krupp Planning Manager 07-10 thru 03-13
•Jacobs Engineering Inc. Construction Planner 02-09 thru 07-10
•Songer Steel Services Inc Construction Planner 12-07 thru 10-08
•Siemens Scheduler 02-07 thru 12-07
•Sauer Inc. Construction Planner 12-06 thru 12-07
•Chapman Construction Planner 12-05 thru 12-06
•Aker Kvaerner Scheduling Supervisor 11-02 thru 12-05
•Dick Corporation Scheduling Manager 03-99 thru 11-02
•Union, Switch & Signal Planner/Scheduler 06-98 thru 02-99
•Foster Wheeler Zack Project Controls Manager 02-94 thru 06-98
Education:
•Electronics Institute - AS In Electrical Technology - Graduated 1980
•Midland, Lincoln High School – General Diploma – Graduated 1978
Skills:
•Comprehensive blueprint reading in all disciplines
•User of Microsoft Suite of software: Word, Excel, Access, PowerPoint, Outlook
•Expert in Primavera Suite of software: P3, P5, P6
•Experienced with practical construction methods in the Power & Industrial Sector
•Excellent Oral & Written Communications
•Flexible, Self Motivated and Detail-Oriented
Training & Certificates:
•Primavera P6 Certified – 2012
•OSHA 10 Hour Trained & 40 Hour Trained – 2007
•Beaver County Vocational Technical School - Advanced Welding Certificate - 2005
•Federal Security Clearance 2002
Drew Miladin
Home: 724-***-****
Cell: 724-***-****
********@*******.***
Detailed Work Experience:
•AECOM Scheduler Maintenance Cracker Furnace Shell Monaca
•04-21 thru present planning & scheduling maintenance PM’s & correctives & Startup activities. Running scheduling meetings. SAP & Primavera P6 used.
•Beech Construction Scheduler
•02-20 thru present planning and scheduling for 14 million dollar bridge project Freedom Road bridge in Cranberry Twp over I-76
•US Steel Caster Maintenance Planner
•10-16 thru 02-20 Planned & scheduled non emergency work for Edgar Thomson Works Caster department. Planned, managed subcontractors and attended dept meetings.
•Walsh Manager for Operations Planning
•02-16 thru 10-16 Managed Operations planning and scheduling for PaDOT Rapid Replacement Bridge Projects Statewide. Managed 3 planners and clerk.
•Chevron Drilling & Completions Planner
•03-13 thru 02-16 Plan & schedule drilling rigs and frac crews
•Integrated into server based Master program
•Drilling and frac practical knowledge applied to schedules
•Thyssen Krupp Planning Manager
•07-10 thru 03-13 Coke Battery planning and scheduling. Clairton site.
•Master program scheduler consultant for US Steel
•Steel Industry & Heavy Industrial
•Jacobs Engineering Inc. Construction Planner
•02-09 thru 07-10 North Shore Connector Project, Pittsburgh, Pa
•Master program scheduler for the construction manager
•Light rail & tunnel construction methods
•Songer Steel Services Construction Planner
•12-07 thru 10-08 Industrial Construction. $350M Blast Furnace Rebuild.
• Supported web based data collection in turn to support the schedule.
•Created database to track project document control
•Siemens Scheduler
•02-07 thru 12-07 FGD, Scrubber, ESP and Fabric Filters $90M-$620M.
•Created matrix reports & linked corporate data with project data
•Sauer Inc. Construction Planner
•12-06 thru 12-07 Wet FGD Dayton Power & Light – $95M-$185M.
•Initialized Earned Value reports and maintained actual values.
•Created and maintained spool tracking list and installation progress.
•Chapman Construction Planner
•12-05 thru 12-06 Arcel 30mm Production Upgrade– Nova Chemical $43M.
•Designed and maintained Earned Value Matrix.
•Directed the receipt of material & checked pipe spool fabrication for errors.
•Organized and controlled lay down yard. 2200 spool pieces were received, organized, tracked and staged for construction.
•Aker Kvaerner Scheduling Supervisor
•11-02 thru 12-05 General Contractor Power Industrial, $15M-$750M.
• Managed 6 to 12 employees
•Created corporate standard work practices and procedures.
•Developed and held training classes for scheduling efforts corporate wide.
•Dick Corporation Power & Industrial Scheduling Manager
•03-99 thru 11-02 General Contractor Power Sector $30M-850M.
•Managed 3 to 8 employees.
•Analyzed work scope documents and project specific reporting requirements
•Union, Switch & Signal Planner/Scheduler
•06-98 thru 02-99 Transportation Industry $15M-$75M.
•Foster Wheeler Zack Project Controls Manager
•02-94 thru 06-98 Boiler Repair Contractor $3M-$30M.
•Managed 2 to 3 employees. Assisted Superintendant coordination efforts in engineering, materials procurement and payroll processes.
•Created database application to signup union workers, automatically fill out electronic W-4’s for payroll, calculate and support payroll.