Post Job Free
Sign in

Power Corporation Airport Operations

Location:
Jewett, OH
Posted:
September 26, 2022

Contact this candidate

Resume:

C. Victoria Landis

Email:

***********@*****.***

Phone: 765-***-****

EXPERIENCE:

Wayne County Airport Authority 1996-2011

Romulus, MI.

Responsibilities included, but were not limited to the following:

Generated construction/alteration permits for tenant construction projects, this included document reviews, inter office coordination and records close out upon project completion. Created a computerized database of all permit as-built drawings from the 1950’s through 2011 for inter office and consultant use.

Assumed departmental project procurement responsibilities for the capitol improvement projects. Acted as the liaison to the procurement division and produced the documents needed to issue projects for bid.

Project management responsibilities for Willow Run Airport involved the establishment of a Capitol Improvement Program and identification of qualified construction projects. Obtained funding from the Federal Aviation Administration, worked with consultants and state agencies to complete the various projects.

Project supervision responsibilities inspection of tenant projects for adherence to the requirements of construction/alteration permit, maintained permit logs, performed document reviews and insured that contractors did not interfere with airport operations during the construction process.

Albert Kahn Associates, 1995-1996

Detroit, MI.

Responsibilities included but were not limited to:

On schedule delivery of project documents, implementation of a regular communication system for project staff and owner, establishment of budget control procedures, recording of scope or criteria changes, coordination of initial project outline specifications, set-up and maintenance of master job records, management of the construction bid/award and construction3 for the owner. Building types included commercial office and automotive.

Redstone Architects1985-1994

Southfield, MI

Responsibilities included but were not limited to:

Acted as the main liaison between the client and the company, the day to day production of documents, quality control, coordination and review of all disciplines, governmental agency consulting, obtaining building permits, shop drawing review, conformance to the owner’s budget constraints, development and adherence to project schedules and design programs. Additional responsibilities generally included approval

and verification of contractor’s application for payment, construction conformance to project documents, budget and schedule for project completion. Evaluation of existing sites for conformance to AADAG requirements, with the subsequent generation of written reports detailing findings and recommendations, feasibility studies for renovation vs new construction, evaluation of existing structures for physical condition, construction cost estimates and budget development, lender’s inspection services, marketing and proposal development. Building types included institutional, governemental, airport, retail, restaurant, hotel and commercial.

Nathan Levine & Associates

1984-1985

Southfield, MI

Responsibilities included but were not limited to:

Project field inspection, shop drawing review, construction document production and coordination of contract commitments between owner, contractor, consultants and architect. Building types included medical, multi-family residential, office and commercial.

Bechtel Power Corporation 1979-1983

Ann Arbor, MI

Responsibilities included but were not limited to:

Preparation of construction procurement packages, evaluation of bid proposals for conformance to specified technical requirements, field supervision and support work, vendor drawing review, development of man hour and work schedules, preparation of required reports and field mark-ups for as-built drawings. Also specified coatings and coordinated the completion of an MCAR report to the NRC/NRR. Building types included fossil fuel and nuclear power plants.

Giffels Associates

1978-1979

Southfield,MI

Responsibilities included but were not limited to:

Developement, preparation and revision of design and construction documents as directed by senior staff, evaluated drawing for conformance to safety codes and contractual requirements. Also performedlimited field work as needed for as-built documents and renovation projects. Building types included office, industrial and hospital.

Wah Yee Associates 1977-1978

Southfield, MI

Responsibilities included but were not limited to:

Drafting, document revision and preparation of presentation boards, some minor code research. Building types included commercial retail and office.

Ralph J. Stephensen

1975-1977

Mt. Pleasant, MI

Responsibilities included but were not limited to:

Drafting of critical path method network schedules and minor construction scheduling of various commerical projects.

Education

Lawrence Institute of Technology Southfield, MI

B.S. in Architecture June, 1976



Contact this candidate