Experience: More than ** years of experience in the Construction Industry, 9 years with a major national firm. Has experience in project design, site preparation, contract negotiation, project management, and quality control/quality assurance management, outstanding in organization, excellent verbal and written communication skills, and interpersonal skills along with proven project management expertise and leadership abilities.

Towson Mechanical, Inc. January 11 2021 to Present Quality Control Manager

Authored the project Quality Control Plan for the JFK High School Addition Project for Montgomery County Public School (MCPS). Implement the three phase Quality Control Programed as enforced by ACOE/NAVFAC Construction Quality Management Principles.

The project includes the construction of Gravity Retaining Walls to facilitate the expansion of the school Foot- print. An additional floor was added to the Addition to enlarge classroom space for the school. A Parking Garage with an upper-level Multiple Tennis Court, coupled with the improved construction of an artificial turf Multiuse Ball field enhanced by three Bus Station Canopies and 12 Bio-ponds, Transformed the Campus into an elegant place Worthy of the name J. F Kennedy Highschool.

KCI Technologies December 2015 to October 29, 2020 Night CQCM Football field

CHOB (Cannon House Office Building): The Building houses the US Congress Offices, and it is located at the Capitol Complex in Washington DC. Commissioned in 1908 and now a historical building in need of up-grading to present day codes. Retrofitting is divided into Five Phases, with work being pursued while still occupied. Extensive Demolition, Utility Replacement, Architectural Enhancements, Historical Conservation, Restoration, and major Structural Modification is required to achieve design intent. The Project was closing Phase 2 of the project and entering Phase 3. TMG Construction April 2015 to December 2015

Construction Quality Control Manager

Andrews AFB: Replace One Taxiway, replace selected Runway Panels and restore portions of the Base Site the Addition work. Responsible for justifying installed materials Quantities for the Taxiway and Runway Pavements to insure Full Payment to general Contractor. Received Above Average rating for QC participation on the project from the ACOE. Received above average evaluation for the Performance of Construction Quality Control Bethesda Veteran's Hospital: Replace all the Main Building's skylights and portions of the roof. The work involved fitting new parts to an unknown concealed condition of past construction that required considerable and critical Structural investigation before effective demolition could be performed. Construct the present Covered Walkway with a specially designed roof to give shelter to Veterans accessing the various Buildings at the Site. Tatitlek Construction Services January 2014 to April 2015 Construction Quality Control Manager

IFSE Building at Fort Detrick in Frederick Maryland (About 6,000,000 Dollars) This is a design Build project in which due to an unfortunate shortage of a CQCM, the project was suffering a serious deficiency in the QC department that were seriously affecting construction progress. Upon my arrival I proceeded to organize and maintain the Submittal process, lead communication with the designer of record and the Subcontractors and implement the 3 Phase Inspection Program which is the fulcrum for success in a QC Plan.

Building was successfully completed, Commissioned, Delivered and Accepted for Occupancy. ACOE evaluation report on our performance gave above average status to the QC Management participation. JOSE’ de ALMEIDA BRITO

5800 Clover Rd. – Baltimore, MD 21215

443-***-**** - *************@*****.***

Essex Construction, LLC May 2010 to January 2014

Construction Quality Control Manager

Kaiser Permanente at Largo Maryland (60,000,000 Dollars)

• Authored the Quality Control Management Manual (QCP) specific for the Construction of a Medical Office Building (MOB) addition to an existing MOB Facility for Kaiser Permanente.

• Conduct Bilingual Safety Orientation Meetings (English/Spanish) for new workers entering the site.

• Conduct QC Phase Meetings with new Subcontractors to ensure compliance with the Contract Documents and the QCP.

• Performed on site Quality Control supervision and supervised 3rd Parties Inspections of installed work and 3rd parties monitoring of ongoing work.

• Generate signed “QC Inspection Reports” and secured signed inspection reports by Authorities having jurisdiction, manufactures and Architects/Engineers of record.

• Generate Daily Reports on the construction activities in progress.

• Liaison between Contractor and Owner’s QA and Construction Management,

• Assist Project Management in generating Requests for Information (RFI), finding solutions to issues related to methods of construction, and in researching back-up data to support quality of work and document compliance of work in place.

ITSI (Baltimore Office) May 2009 to April 2010 Construction Quality Control Manager/Project Manager

• Authored Project Management Manual specific for various DOE Projects to include Project Management Plan (PMP), Quality Control Plan (QCP) and Accident Prevention Plan (APP) with AHA and Safe Work Procedures.

• Authored Traffic Control Plans for several projects in Maryland and New York States

• Performed on site Quality Control supervision at Fort Drum, NY

• Generated Daily QC Reports on remote Station QCS.

• Developed and supervised implementation of safe Cold Weather Concreting Procedure Whiting-Turner Contracting Co. January 2001 to May 2009 MTA Service Facility

Construction Quality Control Manager

Here I reported to a corporate Vice President, supervised Quality Assurance and Control team of four Inspectors and two Engineers on a major project for the Maryland Transit Administration in Baltimore. The Facility is used for Maintenance and Repair of Rail-Road Cars.

• Authored Quality Assurance and Control manual.

• Vetted and hired consulting agencies for surveying, material testing and industrial hygiene.

• Reviewed and edited the Hygienist report for a "Well Building" Certification after an infestation of molding on installed Drywall.

• Analyzed and approved documentation for material submissions.

• Directed QA/QC meetings in all project phases.

• Reviewed information from field teams and consultants and produced progress reports.

• Supervised successful remediation of technical issues during project implementation.

• Enforced compliance of work to project specifications and obtained compliance certifications.

• Monitored nighttime Specialized Welding of Railroad Tracks.

• Generated the "As Built Drawings" commended as the best "As Built " set of Drawings ever submitted to MTA.

Cost and Estimation Support Analyst

Designed erosion/sediment control plans for eight projects with budgets of $20 million to over $200 million.

• Led pre-construction site improvement initiatives.

• Inspected sites for projects during the bidding and conceptual design project phases. The Watkins Partnership May 1998 to January 2001

Project Structural Engineering/Architect Designer

Supervised the design and foundation drafting of “pre-engineered” buildings.

• Designed concrete masonry, timber and steel structures including specification development and review.

• Supervised CADD drafting process.

• Liaison with clients, architects, and component manufacturers to ensure accurate coordination of efforts.

• Modified design specifications in coordination with A/E during construction, as needed. CTL Engineering Inc. March 1994 to May 1998

Quality Assurance / Quality Control Manager

Served as liaison between the companies, general contractors and U.S. government contracting officers for projects with budgets over $5,000,000.

Sample Projects:

The Fish and Wildlife Training Center (200 plus Millions)

• Construction of an educational complex including four dormitories, four classroom buildings, a childcare center, community center, theater, and physical fitness center.

• Utilities included potable/sanitary water management, steam, electrical and communication management systems.

• Construction included concrete-encased site utility conduits.

• Managed sensitive construction requirements to avoid disturbing in-use farmland.

• Supervised demolition to remove limestone that was obstructing the project site. The Barracks at Fort Dietrich (50 plus Millions)

• Construction of six buildings designed to serve as barracks for non-commissioned officers.

• Supervised the commissioning process.

• Performed general QA/QC Manager duties including examining project specifications, conducting constructability reviews, hiring, and coordinating contractors, managing the performance of engineers, site inspectors and contractors, creating a QA/QC manual and reporting on project progress. Runway Addition and Maintenance Area at Scott Air Force Base (100 plus Millions)

• Authored Quality Assurance/Quality Control manual for work on U.S. Air Force’s central command base.

• Led execution of lime stabilization, concrete reclamation and mixing, fuel piping, field welding inspection, trench excavation, piping installation and testing, concrete placement, foundations and installation of fuel tank and maintenance hangar areas for the Galaxies Troop and Material transport airplanes.

• The Base is in Illinois.

LANGUAGES:

Skilled level of Verbal, and Written Communication.

• Spanish: Fluent in reading, writing, and speaking (Advanced Level- Recognize special local dialects)

• Portuguese: Fluent in reading, writing, and speaking (Native Level)

• English: Fluent in reading, writing, and speaking (Native Level) COMPUTER SKILLS

Microsoft Office Suite: (Excel, Word, Access, PowerPoint).

• Design plan-digitizers and On-Screen Take-off programs.

• Prolog

• Procore project Management

• FTQ360 QC Management.

• Some familiarity with RMS3

TECHNICAL SKILLS

• Materials and Systems Testing, Site Improvement and Site Utility Design, Reading Building Plans, Project Technical Analysis, Constructability Reviews.

• Technical Writing (QA/QC Plans, Project Specific Safety Plans, Traffic Control Plans and Project Management Plans.

CERTIFICATIONS

• Certified Quality Control/Assurance Manager (Army Corps of Engineers/NAVFAC)

• Construction Safety— First Aid/ CPR, OSHA 10 Hours and OSHA 30 Hours (Occupational Safety and Health Administration). Recertification ongoing.

• CMIT Certified

CIVIL/STRUCTURAL ENGINEERING DESIGN EXPERIENCE

• Preparation of erosion and sediment control plans

• Design of site utilities including storm/sanitary sewers and water mains.

• Management of Site restoration of storm-damaged dams, lakes, and stream beds

• Foundations, Framing, Building Envelope and Roofing Design (Concrete, Steel, Timber and Masonry) Extensive use of gabions in embankment design, manmade lake maintenance, dredging planning. EDUCATION Merchant Marine Academy Belem, Para’, Brazil Bachelor of Science, Mechanical/Marine Engineering Johns Hopkins University Baltimore, Maryland

Bachelor of Science, Civil Engineering

PROFESSIONAL REFERENCES:

Mr. Charles Batiste, PM: P- 540-***-**** – *********@*******************.*** Mr. Alan Austin, QAM: P – 202-***-**** - ****.*.******@*****.*** Hussan Elshaer, QCM: P – 571 – 268 4639 – *********@*****.***



Contact this candidate