CV Samarn Nilpetch,

*

Experience Classification

Category

Management Quality

(QA/QC) Engineering

Construction Project

Manager

Subcategory

Fabrication Mgr.

Manager Quality

Control

Commissioning (+Pre-)

Mechanical / Piping

FPSO Module / STR, Piping

Ability

Experience

Expected

Expected

Expect

Experience

1 year

3 years

10 years

10 years

1 year

Professional: Mechanical Commissioning Engineer / Construction Engineer, Supervisor Specialization: Piping, Mechanical, Oil & Gas, Petrochemical, Power Plant, Construction. Contact E-mail: adslij@r.postjobfree.com

Position in company: Site Mechanical, Piping, Commissioning, Owner Engineer and Completion Last Project Location: Mae-Moh Power Plant Replacement Project (MMPR1) Electricity Generating Authority of Thailand (EGAT) Permanent/Home/Location/Address

Country: Rayong Thailand

Cell phone: + 66 (0-982******

Year of Experience

• Over 25 Years Supervisor / Engineer, Onshore in

• Oil &Gas Petrochemical, power plant,

• Construction installation and commissioning

Nationality

: Thai

Date of Birth

: 08 Aug 1965

Education:

Welding & Sheet Metal

Authorize to work in: Thailand

Relocated? Yes. I will have relocated and travel.

Professional Affiliations:

FGD training, PTW training, Work safety at height, Commissioning, SHE training Course. Osha /STA / JHA Computer skills and software use: MS Office

Availability: Earliest start date Given 2-week notice Required salary & conditions Position and location are suitable. JOB TARGET: Mechanical / Piping / Commissioning

PURPOSE

To provide technical expertise of piping, mechanical engineering for Oil & Gas, Petrochemical, Power plant. Support to projects management, Supply division and projects controls through all phases of major and minor projects. Experienced commissioning engineer on large scale thermal gas fired power plants and coal fire power plant and Manage a site team of multi-disciplined inspectors throughout the project up, including the commissioning and hand-over of the Plant Review of EPC Contractors site documentation including commissioning procedures, Supervision of commissioning activities, including onsite inspections and meetings with the EPC contractor. Assistance to client site manager in general site coordination duties. Develop and maintain the client site quality documentation and procedures Monitoring and reporting on the contractor’s progress with respect to the project

2

BACKGROUND- Qualifications

Over 25 years of experience in a career dedicated to the provision of engineering services in the development of Oil & Gas, Petrochemical, Power plant, Engineer, Fabrication, Construction, Mechanical and Commissioning. Complete in major project. I am most adept at successful employment in a multi-discipline environment. Has provided these services for a wide variety of projects including Have “hands-on”

Piping fabrication and installation for construction: Assures that for the fabricated and installation piping and equipment are in accordance with company specifications, Standards and practical solutions for problems arising during construction service.

Experience with commissioning project

Worked as mechanical engineer, Supervisor with team management experience includes operational aspects of Turbine, Coal handling, FGD operation, Commissioning. Technical advisors for contractors Involved with fabricated, installation and commissioning work. Experienced commissioning engineer on large scale thermal gas fired power plants, coal fire power plant and LNG Project at Qatar Gas, Petro-Rabigh Saudi Arabian, China, Indonesia and Vietnam. Manage a site team of multi-disciplined inspectors throughout the project, including the commissioning hand-over of plant, Review of EPC contractor’s site documentation including commissioning procedures, etc. Supervision of commissioning activities, site inspections and meetings Liaison with EPC Contractor and client head office as required. Assistance site manager in general site coordination duties. Develop and maintain the client site quality documentation and procedures. Monitor and reporting on the contractors with respect to the project program. Mechanical Engineer (Balance of plant) Responsibilities: Performing as an EPC contractor to construction, erection and commissioning of a coal fired power plant on balance of Plant. Performed by sub-contractors with reference to Specifications, good utility practice and industrial standards as appropriate, to familiar and observe comply with plant safety control procedure. Coordinate monitor and control all site activities, associated for construct and commissioning of FGD, Coal Ship Unloaded, Coal Handling System and Familiar with and fully understand the technical and commercial requirements of the project. Assist in preparing construction and commission. Attend inspection and testing activities as and when needed. Coordinate with all participants and draft documents as and when requested by EPC contractor. Chair regular meetings on site, prepare minutes, follow up and resolve pending technical issues. Prepare daily report for site activities carried out, as well as incident report as and when required to work within the provisions and guidelines of the Quality Assurance system, to generate defect punch lists. Over 5 years of relevant working experience with large coal-fired power plant working, Have specific knowledge and experience of FGD, Coal Ship Un-loader, Coal Handling System, Ash Handling System, Fully conversant with applicable design and engineering standards, Familiar with local codes and standards and local authority requirements.

JOB DESCRIPTION

1. All disciplines in the complete installation mechanical equipment assist in the construction. Check out start up commissioning with FPSO-Module, Petrochemical, refinery, Power plant. Wet Flue Gas Desulfurization (FGD) and LNG plant

2. Skills direct hands-on with field craft labor and jurisdictional assignments handling labor disputes problems. Leader with interpersonal skills to consistently and effectively communicate between the contractor home office, owner and vendors,

3. Experience in fields disciplines of construction, rigging equipment setting and alignment, grouting, excavation, concrete pouring, piping, valves, erection and welding controls. 4. Proficient in reading drawings in all engineering disciplines and operation manuals, P& ID, schematic and flow diagrams with construction handling and welding procedures of specialty carbon steel, stainless, Duplex and alloys steel.

5. Technical advised within mechanical and pipe work for FGD generating with wet flue gas desulfurization (WFGD) systems and is a plus Traveling and relocation work packages. 6. Directs, coordinates, initiate plans and schedules engineering functions for field construction Have field engineering responsibilities for mechanical equipment and piping packages and other packages as directed by attend all meetings associated.

The Field Engineer responsible for the following: Coordinate with construction on field, preparing Field changes via request for Information (RFI) Field Change Requests (FCR) and submitting to the Resident Engineer for review and approval. Documenting as-built drawings, Equipment lifting recode Test data and other construction activities. Document change logs, etch. Work with the Resident Engineer (RE) on resolving technical issues, clarification field change Performs field Inspection and monitoring of work progress. Coordinated material receipt and documentation. Familiar with all construction procedures, project specifications and quality Documentation requirements at their specific, Address the timely identification, documentation of engineering Encountered at the site, Preview construction documentation prior to field Fabrication / installation, Identify and resolve potential problems. provide technical direction/support for construction supervision subcontractor

3

SUMMARY OF EXPERIENCE

Oil & Gas, Petrochemical, Power plant, Construction and Engineering 01/09/21- Present JGC -GC Harmony project

02/11/20-30/04/21 Black &Veatch International Bngprakong Power Plant Replacement Project (BPPR1) 15/06/20-31/08/20 GE, General Electric power, MaeMoh Power Plant Replacement Project (MMPR1) 25/06/18-15/09/19 GE, General Electric power, MaeMoh Power Plant Replacement Project (MMPR1) 16/03/18-15/06/18 Marubeni Corporations, South Bangkok Power Plant Replacement Project (SBPR1) 01/11/15-30/06/16 Samsung Construction, PTT ELK Project 09/02/12-03/06/14 Qatar Gas, JBOG Project Ras Laffan Industrial city Qatar Gas 06/11/12-07/02/13 Toyo Engineering Corporation, TEC / Cha-Choeng-Sao CCPP 16/01/12-09/05/12 Aramis Energy Service Sdn Bhd -Hanas New Energy Group P-R China 19/09/08-15/01/12 Thai Mott Mac Donald (TMM) Mechanical Inspector owner engineer 07/12/10-30/06/11 GSE&C Onshore / PTT-LNG/ jetty development and LNG receiving Terminal 07/06/10-31/08/10 Qatar Gas 3&4 Onshore Project. Ras Laffan Industrial city Qatar Gas 27/07/09-28/02/10 Thanaphum Service & Construction Co., Ltd. (TSC) Aibel LCB Project 09/01/08-31/12/08 Rawec /Rabigh Arabian water & Electricity Co.ltd (FGD comm) Saudi Arabian 02/01/06-23/12/07 Marsulex environment Technology (TFA) China 15/05/05-15/11/05 Black &Veatch International / Jepara Java Tantung Tati “B Indonesian 30/08/04-10/05/05 Bill finger Berger (Thailand)

22/12/03-31/04/04 Ultimate technology& Service

25/03/03-31/10/03 Bayer Polymer Thai (Relocated Project) 07/01/01-03/03/03 Stone &Webster Engineering Corporation (SWEC) Electrical Vietnam 15/03/00-30/12/00 Mitsubishi Heavy Industries / Ratchaburi Thermal Power Plant (EGAT) 01/09/99-31/02/00 ABBS (SADIME) FGD Power Plant / Lamphang 04/09/98-31/12/98 Mitsui Engineering & Shipbuilding / Bangchak Refinery (BCP/HD) 01/05/97-30/08/98 Toyo Engineering Corporation / Rayong Olefins (ROC) 25/11/96-30/04/97 PAE(T) / Thai Lube base Sriracha 01/09/95-24/11/97 PAE(T) / Ethylene Plant (TPI) 05/06/94-31/06/95 Thai Poong Lim / Rayong Refiner (RRC.) 18/01/93-31/05/94 BEC-PRO / Thai Olefins (TOC) 01/01/92-15/01/93 Thai Juroung Engineering Combined cycle / Namphong (EGAT) 25/07/91-25/12/91 Chaijira /Siam construction steel (SCSC) 02/01/91-30/06/91 BETA Engineering & Chemical Corp. / Turn around Project (NPC.) 15/09/90-30/12/90 PLE/BATA Engineering &Chemical / pipeline to power plant 07/04/90-31/08/90 Nippon Kokan (NKK)Gas plant separator (GSP# 2) 08/05/89-02/04/90 PAE(T)co, ltd. Michelin Siam

17/08/87-31/05/88 PAE/PEC The consortium Cure Oil Terminal (PTT Leamchabang) Kuraray Gc / JGC Project Harmony

Mechanical Pre-Commissioning supervisor 01/09/21

Roles & Responsibilities:

Mechanical pre-commissioning, support for processing and utility system, packages hands on and problem-solving. Self-motivated drawings. Ability to effectively work with diverse Black &Veatch International Co., Ltd (Bangprakong / BPRP1) Mechanical Startup Eng /Commissioning 02/11/20-30/04/21 CCPP power plant 2 X700MW

Roles & Responsibilities:

Mechanical commissioning SU and support for Instrument discipline, duty working for Fuel Oil and Fuel Gas system, 2Fuel Oil Tanks storage loading, and 3 Centrifugal Compressor packages of the power plant. Supplemented with hands on and problem-solving. Self-motivated to interpret engineering drawings and process controls narratives. Ability to effectively work with diverse cultures and situations formal technical training, verbal and written communication.

Perform commissioning and process integration of centrifugal fuel gas compressors. Test and configure surge protection systems. Vent and Pure gas is out.

Ensure successful compressor to Effectively communicate to the client and exercise best safety practices during all commissioning phases.

Prepare daily project activity and technical reports.

Represent Company in an appropriate and professional manner at all times.

Establish and maintain an effective and successful working relationship with customers.

To comply with Safety Rules, Regulations OSHA / STA /JHA Requirements. 4

Mae Moh Power Plant Replacement Project (SBPR1) 15/06/20 -31/08/20 Electricity Generating Authority of Thailand (EGAT) Thermal power 660 Mw Roles & Responsibilities: Mechanical. TFA / WFGD- Outstate.

Dewatering system- Replace new belt filter and take care operation running system,

Ensuring mechanical equipment test run and then Operation run in service.

Assist of systems operating requirements

Utilize the safety tagging and lockout procedure/process.

Supervises assigned. representatives engaged in troubleshooting activities. Mae Moh Power Plant Replacement Project (SBPR1) 25/06/18 -15/09/19 Electricity Generating Authority of Thailand (EGAT) Thermal power 660 Mw Roles & Responsibilities: WFGD mechanical commissioning Engineer. FGD area Mechanical commissioning work system.

Duties work: Mist eliminator, Absorber, Dewatering system, Belt Filter, Filtrated water and Gypsum system, Mechanical working in rotating equipment, Oil Lubrication, Grease, Rotation equipment check and Initial test run, Operation test run in service.

Assist in the development of systems commissioning guidelines, operating instructions, Assistant in reviewing engineering drawings, specifications requirements to ensure adequate provisions have been made for testing, flushing, cleaning and other pre-commissioning

Utilize the safety tagging and lockout procedure/process.

Supervises assigned construction craft labor. Work closely with Client on-site personnel service representatives engaged in pre-commissioning and troubleshooting activities.

Conduct systems walk downs and generate punch lists. The consortium of SIEMENS AKTIENGESELLSCHAFT, SIEMENS LIMITED AND MARUBENI CORPORATION Marubeni Corporations,

South Bangkok Power Plant Replacement Project (SBPR) Phease1. 16/03/18 -15/06/18 Roles & Responsibilities:

Mechanical construction engineer GT/STG Power Block, Siemens 8000H

Mechanical Engineer for construction, Review Contractor’s method, procedures, ITP and Quality Plan and assist for construction activities. Working relationship with contractor personnel. Supervise Contractor’s site activities in accordance with the projects and contractor’s specifications, procedures and risks assessments. Maintain day-to- day liaison with contractor’s site engineer and supervisors. review and comment upon contractor daily activities cover and investigate any anomalies /queries. Ensure that company’s reputation is maintained and enhanced though all construction- related activities. responsible for carrying out PTT ELK PROJECT

Samsung-ITD J/V

Samsung Construction Co, Ltd 01/11/15- 30/06/16

Roles & Responsibilities:

Mechanical commissioning starts up for LPG Plant PTT at Khao Bao Ya Project

Reactive and supporting member of the company, Basic duties being involved in the EPC-PMT team activities To carry out pre-commissioning verification and commissioning activities for the project teams on designated major projects onshore and Jetty, ensuring a safe timely start-up of the new facilities in line check sheet and punch list tracking database. Support the project teams in preparation for construction and commissioning. Monitor construction activities Witness pre-commissioning tests, carried out for vendors and contractors to ensure compliance with standards Carryout discipline commissioning activities in timely compilation of Demonstrate knowledge of requirements for equipment hazardous areas. 5

Qatar Gas, JBOG Jetty Boil of Gas Recovery Project. LNG - Ras Laffan Industrial City.

Qatar Gas Operation Company

09/02/13- 30/06/14

Mechanical & Piping Commissioning Completion

Roles & Responsibilities:

Active and supportive member of the Qatar gas Operating Company. Project Management Team (PMT) Basic duties being involved in the PMT team activities. Coordination PMT, continually monitoring the day- to-day progress list and compilation status, advising of field activities via the MCPLUS

Contract and coordinate with the construction contractors at their team of Mechanical & Piping Engineers - Supervisors to create and capturing check sheet to make sure we have all of check sheets cover and record in MC-Plus (Mechanical Completion Plus) Activity is to ensure that the inspection and test Record (ITR) (also known as “check sheet”) covering all construction activity are in place for piping and mechanical equipment work etc. Equipment installation, operation running, Piping test pack, Hydro testing, Flushing/Cleaning, System Mechanical Completion (SMCC) activities for the Project Coordinating a team of construction-commissioning personal Completion of Mechanical & piping completion work and Commissioning piping systems

Ensuring all Construction to sign off all Piping & Mechanical check sheets over before N2-Helium leak testing of the process piping for commissioning complete to assist with technical queries as per Qatar gas requirements from Operation Department Division (ODD)

Toyo Engineering Corporation co, ltd

Gulf JP NNK Company Limited 06/11/12-07/02/13

Mechanical commissioning start-up

Roles & Responsibilities:

Mechanical commissioning starts up and operation for combined cycle generate electric, Energy by 2x47 MW SIEMENS Gas Turbine SGT-800 and Missuit Steam Turbine SST-800 / 60 MW, Control, and coordination with Supervisor commissioning and operation team. Operation running a 110 MW, gas fired cogeneration, the power plant project located in Wangtakian Sub-district, Muang District, Chachoengsao Province. GNNK supply 90 MW of electricity to EGAT and chilled water to industrial customers in the area, Hanas New Energy Group LNG Division, Ning Xian Yinchuan China Aramis Consultant Company /Owner Engineer

Mechanical Commissioning Engineer (Punch list for Hand Over) 16/01/12-09/05/12 Roles & Responsibilities:

Mechanical construction punch list item for owner site / Hanas LNG Project

Clearance for Mechanical status to achieve safe compatibility and enabling 'non-impact to function ability' (Category 'B') punch item completion verification for Operational Acceptance Certificate

Advice and review for piping modify work for gas start up recovery. Qatar Gas 3&4 Onshore Project. LNG- Ras Laffan Industrial City. Qatar Gas Operation Company

Roles & Responsibilities:

Punch List Consolidated Coordinator.

07/06/10-31/08/10

Active and supportive member of the Ras Laffan (Qatar) Qatar gas Operating Company. Project Management Team, Basic duties being involved in the CTJV (Chiyoda Technip Joint Venture) Qatar gas LNG Train 3&4. PMC/PMT team activities. Basic duties involve coordination with expansion Startup, ESU and MPT continually monitoring the day-to-day progress punch checklist. compilation status, advising of field activities via the Win- PCS (Project Completion & Certification Tracking System Software) for verification clearance of agreed priority category (populated / non-populated) punch list check sheet items enabling Ready for Inspection (RFI) 6

Rabigh Arabian water & Electricity Co., ltd. (Saudi Rabigh IWSP Project) Mott Mac Donald (MTMM) F GD Commissioning Eng. 09/01/08-31/12/08 Roles & Responsibilities:

IWSP project 9 boiler 5 Turbines 3 FGD unit, Oil fire power plant and FGD system, Construction and Commissioning,

Technical advisor for limestone preparation system, Dewatering system, Absorber slurry, Recycle spray Blank, Mist eliminator, Bleeding gypsum, Plant Operation, Technical advisor for limestone

Advisor for Operation and maintenances (O&M)

Disciplines in the complete installation of mechanical equipment and assist with checkout, Commissioning and startup for FGD system. Marsulex Environment Technology Co., Ltd (China Project) Technical Field Advisor Service (TFA –FGD) 02/01/06-23/12/07 Roles & Responsibilities:

Coal fire power plant, FGD engineering system Construction and Commissioning, Technical advisor for limestone preparation system, Dewatering system, Absorber slurry recycle spray blank, Mist eliminator, bleeding, Gypsum, Plant operation, China project 1) Qinzhou Nanning 2x600mw 2) Wisco Wuhun 1x300mw 3) Heze Jinan 2x300mw 4) XiangFan Wuhan 2x600mw 5) Shimen Changsha 2x300mw 6) Gaojing Beijin 1x300mw Black &Veatch International Co., Ltd (Indonesia)

Mechanical Startup/Commissioning 15/05/05-15/11/05 Coal file power plant 2 X 660 MW Completed with precipitations and Flue Gas Desulphurization Unit system, Indonesia PT Central Java Power Tanjun Jati “B” Roles & Responsibilities:

Coal Handling system, including ship un-loaders, stackers, re-claimers, crushers, vibrating screens, Silo filling trippers, static & rotating equipment and several kilometers of coal conveyors. Mechanical and construction work for competition mechanical commissioning and operation test run belt conveyer. Responsible for Coal Handling unit backup for remaining construction or construction modify, punch work. Control contractor Verification of construction completion as well as coordination, scheduling and execution of the commissioning program. Supervisor for contractor, Supervision follow up target commissioning schedule and mechanical commissioning for coal handling. Prepare daily reports of all site assigned activities. Skills Direct hands-on experience with all field craft labor and jurisdictional assignments

Stone & Webster Engineering Corporation (SWEC)

Electric Vietnam Thermal Power Plant Pha-Lai No.2 (EVN), PHA Lai, Vietnam Commissioning start up Mechanical Engineer

FGD Area (Jan-Nov 02) Turbine

Area (Jan-Dec 01)

Roles & Responsibilities:

07/01/01-03/03/03

Vietnam Electric Vietnam Coal fire Thermal Power Plant. Pha-Lai No.2 2x 300MW. Turbine Building and Fuel Gas Desulphurization system

Turbine (300 MW) Mechanical works /Commissioning start up Responsible in mechanical commissioning for utility system (Auxiliary cooling, Auxiliary steam, Instrument Air, Chilled water, Service Air, Condensate, Vacuum system, Main Steam, Low pressure steam, Extraction steam systems). Work activity including testing, Flushing. Cleaning, Steam blowing and rotating equipment turning, Oil systems circulated flushing, Grease filling and Initial test run for operation service in turbine

FGD area Mechanical commissioning completed work system. 7

in Limestone system, Preparation system, grinding system, Mist eliminator, Absorber, Dewatering System Belt Filter, Filtrated water and Gypsum system, Mechanical working in rotating equipment, Oil Lubrication, Grease filling, Rotation equipment checking, Vibration check. Initial test run and Operation plant service in, Operation test running. My duties:

Assist in the development of systems commissioning guidelines, operating instructions, Assist in reviewing engineering drawings, specifications and procurement requirements to ensure adequate provisions have been made for testing, flushing, cleaning and other pre-commissioning

Maintain commissioning and start-up records.

Utilize the safety tagging and lockout procedure/process.

Assist in the planning, scheduling and performance of equipment maintenance during the commissioning

Supervises assigned construction craft labor.

Work closely with Client on-site personnel and supplier service representatives engaged in pre- commissioning and troubleshooting activities.

Conduct systems walk downs and generate punch lists.

Interface and work closely with Client site personnel and operations group. Thailand work experience

The Nation Power TNP2, Project

Thai Mott Mac Donald (TMM) Mechanical Inspector Owner Eng. 19/09/08-15/01/12

Job Description, Engineer Mechanical in charge of mechanical erection, such as Gas Turbine, Steam Turbine, Heat Recovery Steam Generators Cooling Tower and all Balance of Plant materials equipment. Responsible to plan, interpret, verify witness and coordinate all phases of mechanical contract. To maintain coordination with mechanical, and other sub-contractors throughout all phases of the project to ensure that mechanical works Specific responsibilities can include:

Ensuring Mechanical construction activities are in accordance with all applicable customer requirements. Checking location and placement of all piping systems; steam, condensate, lube oil, distillate fuel, natural gas, potable water, demineralization systems etc.. Reviewing sub-contractor mechanical claims for approval or rejection, reviewing contractor weekly mechanical plans vs. contract schedule, ensuring sub-contractors are complying with MC EHS procedures and Preparing daily and weekly reports as required, attend site meetings as required GSEC the consortium of GS / KOGAS / DEC, PTT LNG Project 07/12/10-30/06/11 Mechanical Pre-Commissioning Engineer

Roles & Responsibilities:

To carry out pre-commissioning verification and commissioning activities for the project teams designated

major projects onshore, ensuring a safe timely start-up of the new facilities in line check sheet and punch list tracking database.

Support the project teams in preparation for construction and commissioning. Monitor construction activities Witness pre-commissioning tests, carried out for vendors and contractors to ensure compliance with standards. Carry out discipline commissioning activities in timely compilation of handover documentation Demonstrate knowledge of requirements for equipment in hazardous areas. The system completion with LNG loading to tanks and sent out to truck loading. Project Name: TUPI Petrobras FPSO Cidade de Angra dos Reis MV22 FPSO (Floating Production Storage and Offloading) Aibel /LCB Thanaphum Service & Construction Co., Ltd. 27/07/09-08/02/10 TSC Project Site Manager

Roles & Responsibilities:

Review Contractor’s method, QC procedures, ITP and Quality Plan and assist with establishing Acceptable working practices for construction activities. Establish a smooth and efficient working relationship with Contractor personnel. Supervise Contractor’s site activities in accordance with the Projects and Contractor’s specifications, Procedures and risks assessments Maintain day-to-day liaison with Contractor’s site supervisors. Review and comment upon Contractors daily inspection records for activities covered and investigate any anomalies/queries. Ensure that Company’s reputation is maintained and enhanced though all construction- related activities. Responsible for carrying out work for module structure erection, Piping fabrication &installation for Mainly system, main piping header, Nitrogen Fuel Gas, Cooling water supply and return 8

Bill finger Berger (Thailand) Co, Ltd

Blue scope steel (BHP) 30/08/04-10/05/05

Mechanical / Piping Engineer

Roles & Responsibilities:

Review Contractor’s method, QC procedures, ITP and Quality Plan and assist with establishing acceptable king practices for construction activities. Establish a smooth and efficient working relationship with Contractor personnel. Supervise Contractor’s site activities in accordance with the Projects and Contractor’s specifications, procedures and risks assessments. Maintain day-to-day liaison with Contractor’s site supervisors. Review and comment upon Contractors daily inspection records for activities covered and investigate any anomalies/queries. Ensure that Company’s reputation and enhanced though all construction- related activities. responsible for carrying out work for piping fabrication and installation for Utility system, main piping header and Hookup with equipment, Air, Nitrogen, Fuel Gas, Steam, Condensate, Cooling water supply and return, Hydraulic tubing around rolling machine, Processing system Hydraulic oil, Grease, for area Coil car, Cleaning section, Entry accumulator, Furnace, Skill pass mill, Chemical passing, Exit accumulator, Heavy mechanical Pipe routing,

UTS, Ultimate Technology & Service Co., Ltd, 22/12/03-31/04/04 Engineering Manager

Roles & Responsibilities:

was Engineering Manager for a company with business in Fabrication of Steel structure and Piping supplying to CUEL, Chevron, SSM, Unit Gas Etc. Responsible for Quality test plan and Contract Co- ordination work, Material Testing inspection and certify for Offshore and On-shore Petrochemical projects. I also was responsible for control of Manpower loading for working jobs on site and in company fabrication shop, work plan and target schedule for completed project.

Bayer Polymer Thai Co., Ltd, Maptaphut, Thailand 25/03/03-21/10/03 Mechanical Engineer

Roles & Responsibilities:

Responsible in Mechanical work for Equipment and Piping modifying for SAN Expansion / ABS Debottlenecking Project and Mechanical commissioning for utility system (Auxiliary cooling, Auxiliary steam, Instrument Air, Chilled water, Service Air, Condensate, Main Steam, Low pressure steam) and also mechanical commissioning in the process system for plant start up. Follow up Mechanical engineering activity for work completed in this project;

Mitsubishi Heavy Industrial Co, Ltd

Ratchaburi Thermal Power Plant (EGAT) FGD section, Ratchaburi Commissioning/start –up Mechanical

15/03/00- 30/12/00

Roles & Responsibilities:

Responsibility carries out commissioning activity for Pre-start up the plant. Perform air blow out of the entire piping system. Following up P&ID, and commissioning work for all equipment in accordance with manufactures instruction. Commissioning and operation checking of vibration, sound, temperature, Ampere current, Rpm. Thoroughly oil flushing, cleaning. Cooperated with EGAT commissioning team and carry out for the ECC, SCC Pending item clearing out NOD (notice of defect) system and recording reporting work activities system submit to EGAT ABBS SADIME Co., Ltd

FGD POWER PLANT (EGAT), Lamphang

Commissioning Mechanical Engineer

01/09/ 99 - 31/02/00

Roles & Responsibilities:

Responsible carries out an activity for the plant installation work. Checking of the construction, mechanical and piping systems that all equipment installation was done in accordance with manufacturer’s



Contact this candidate