PROFILE
Mechanical Engineer with more
than ** years of experience in
the Gas Plant processes on
MMG 15500 Air Separation Plant
& MG 5000 Nitrogen
Liquefaction plant and, involved
in plant start-up, normal
the operation, plant shutdown,
product testing, plant trouble
shooting, RO Operation and
cooling water treatment. My
the goal is to grow as a person and
as a professional every day.
CONTACT
PHONE
HOME ADDRESS:
#440 Purok Tindalo,
Barangay San Joaquin.,
Sto. Tomas City., Batangas
Philippines 4234
EMAIL:
*******@*****.***
STEPHEN LLOYD
TOLENTINO
MECHANICAL ENGINEER
EDUCATION
Technological University of the Philippines
June 1997 – March 2002
Bachelor of Science in Mechanical Engineering
WORK EXPERIENCE
NIPPON SANSO INGASCO, INC.
(formerly INGASCO, INC. A Taiyo Nippon Sanso Group) Production Supervisor
March 1, 2011, to present
Focus: Manages the operation and maintenance of all the equipment in the Air Separation Plant; thereby, ensuring that the standard quality of LIN, LOX, and LAR is met.
Full responsibility for Start-up, normal operation, and Shutdown of all units or equipment with a handed plant operation procedure.
Supervises the operation of the running equipment and ensures that all are in normal operating condition.
Regularly evaluates operation data and immediately implements correction on abnormalities detected.
Implements the Standard Operating Procedures and Safety Policies of the company; including proper housekeeping, plant rules, and regulations.
Directly manages/handles a staff/pool of 5 AIR SEPARATION PLANT operators and a pool of 2 Bulk Chargers, thereby responsible for enforcing
/ maintaining discipline and extracting maximum efficiency amongst his subordinates.
Ensures that all work activities of staff conform to the company’s Environmental management system.
Performs other duties as may be assigned by higher authorities. Air Separation Plant operator
April 1, 2007, to March 1, 2011
Focus: Provides a high level of expertise and know-how in Air Separation Plant operation.
Functions as the Shift Supervisor (in his absence): rest day-off, vacations leave, and Holidays.
Operates MMG15500 AIR SEPARATION PLANT (capacity @ 100000Nm3/day) and MG5000 NITROGEN LIQUIFACTION PLANT
(capacity @ 120000Nm3/day) @ high efficiency; to produce Liquid Oxygen, Liquid Nitrogen, and Liquid Argon @ acceptable quality.
To maintain plant machines and equipment in good operating condition. SEMINARS
Training of Trainers on
Occupational Safety and
Health
Machine Safety Course
Fire and Earthquake Drill
Power Quality Symposium
2013: Sharing Global
Practices
PERMIT TO WORK SYSTEM
Defensive and Effective
Vehicle Operation and
Maintenance
Failure Mode and Effects
Analysis, 4th Edition
Fire Competency Training
and Advance Fire Fighting
Effective Root Cause
Analysis
STATISTICAL PROCESS
CONTROL
TELEDYNE Analytical
Instruments
DELTAV Engineering
Training
DELTAV OPERATOR’S
TRAINING
WATER TREATMENT &
CARBON MEDIA
BASIC COOLING WATER
TREATMENT TECHNOLOGY
CHEMICAL SAFETY
SAFETY AWARENESS
ORIENTATION
PRODUCT KNOWLEDGE &
SAFE GAS HANDLING
ISO AWARENESS &
ORIENTATION
CHARACTER REFERENCE
Engr. Adrian P. De Jesus
Production Manager
NIPPON SANSO INGASCO, INC.
Clark, Pampanga.
************@*******.***.**
Engr. Ferdinand B. Jagonoy
Production Manager
NIPPON SANSO INGASCO,
PHILIPPINES TAGOLOAN INC.
Cagayan De Oro City
****************@*******.***.**
Engr. Maximo Pagliwangan
Proprietor
Thermo Multi-Technology
Operates control panels in control rooms by taking readings of the units and following through / attending to recorded abnormalities or readings beyond parameters.
Responsible for local, DCS & Delta – V operation of equipment, compressors, refrigeration unit, driers, heat exchangers, rectifying columns, DE-OXO unit, expansion turbine, heaters, cooling water system, and other balance of plant.
Review historical lists of reports and alarms turned – over by the Outgoing Duty Shift Supervisor / ASP Operator & make necessary actions on abnormalities found.
Give instructions to Assistant Plant Operator whenever there are start-up, shutdown & other adjustments to be made & check on the field.
Performs duties on a three-shift basis.
Trains Assistant Plant Operator as part of personnel training & development.
Performs other related functions as may be assigned from time to time. Assistant Plant Operator
March 10, 2003, to April 1, 2007
To operate ASP / NLP in accordance with the standard operating procedures and manuals.
Perform–process & finished & product testing.
Report to Plant Operator / Shift Supervisor any machine/equipment abnormality, corrective actions & adjustments made.
Perform preventive and corrective maintenance work on machinery & equipment of the plant.
Records machine performance & adjustments are undertaken in the log sheet/logbook.
Perform cooling water monitoring & treatment.
Charge PBC & lorry trucks.
Performs other tasks that are assigned by immediate superior. Thermo – Multi-Technology
Cadet Engineer
November 11, 2002, to February 10, 2003
Assist in maintenance & fabrications of boilers.
Visits & inspects project sites.
Prepare reports & recommendations of set – up & other related materials of each visited site.
Performs other related functions as may be assigned from time to time. SKILLS
DCS operation
ASU operation
RO Plant operation
Scheduling machine/equipment for maintenance
LOTO
Computer Literate
Gas Plant Operator