Post Job Free

Resume

Sign in

Power Plant Electrical Engineer

Location:
Durgapur, West Bengal, India
Salary:
40000/-
Posted:
September 13, 2022

Contact this candidate

Resume:

To,

The Personal General Manager

Subject: Application for the post of Manager of Power Plant and power system. Dear Sir,

Having came to know about the vacancy in your global organization for the above- mentioned post, I would like to offer my candidature for the same. Please find enclosed here with my detailed ‘C.V’ the perusal of which I am sure would enable you to take a valuable and favorable decision. Thanking you.

Yours faithfully,

R.Banerjee Date : 25.09.2020

RESUME

RAJIB BANERJEE CURRENT ADDRESS

Kolkata (West Bengal) RTM Staff Colony, D-Block

Mob: 099******** RoomNo:D 46,Pachpahar Road

Email: adsjyp@r.postjobfree.com Bhawanimanid, Raj-326502 Career Objective

15 years of experience Operation & maintainance in Solar Power Plant,132KV, 33KV, 11KV Sub- Station, different type of DG Sets like Wartsila HFO Fuel type, Cummins,12MW coal base Thermal Power Plant. Extensive experience in carrying out activities such as erection& commissioning, troubleshooting, preventive, predictive and breakdown maintenance, modification,spare management, documentation as per ISO 9000:2000 QS standards. To extract all possible knowledge, whether theoretical or practical and to utilize at its optimum level and also keep updating my knowledge according to market demand so that I must be always head hunted wherever I stand.

PERSONAL INFORMATION:

Father's Name : Shri Sailen Banerjee.

Mother Name : Smt.Sawpna Banerjee

Date of Birth : 28Th. December 1981

Marital Status : Married.

Language Known : Hindi, English & Bengali.

Nationality : Indian.

Passport : Valid.

ACADEMIC & TECHNICAL EDUCATION:

Place Year

H.S.C. in Science Kolkata (W.B.) 1997

B.E ( Elect) Bhopal (M.P.) 2005

Present Status:

Presently working with Sutlej Textile & Industries Ltd. (R.T.M) Bhawani Mandi (Raj.), K.K.Birla group as an Power Plant In charge of Solar Plant (3.8 MW), Wartsila Power Plant (4.2 M.W X 2) & 132/11 KV Sub-station from 2010 to still. Past Status:

Power Plant In charge. in the R.S.W.M LTD. (LNJ Group) at Bhilwara from 17 Nov 2008 to 2010. ( 2.8 M.W *3 + 2.1 *1 M.W) & Solar Plant 2.8 MW.

Joined Ritspin Synthetics Limited at Indore as Asst. Manager (Power Plant) in the year 2006 to 2008 (3.9 M.W * 1, 12V32LN)

Joined Rajshree Textile Mills, Kolkata as Engineer for FO base Wartsila Engine from 2005 to 2006.

Profile of Responsibilities

Operation & Management for electrical side of Solar Power Plant, 132/11KV Sub-Station, 33/11KV Sub-Station and all H.T. System of the plant.

Operation & Management for electrical side of Solar Power Plant, Wartsila DG power plant of capacity 8 MW, having 02 nos 4.1 M.W of 12V32LN & two waste heat recovery boilers of capacity 2 ton. X 02 Nos.

Operation & Management for electrical side of 12MW Thermal power plant. Other responsibility as follows:

Operation & maintainance & erection of Solar Power Plant .

Possess strong skills in PROJECT PLANNING and MONITORING PROJECT PROGRESS.

Power study of plant machinery & preparation of energy conservation proposals and their implementation.

Planning day today routine, preventive & corrective maintenance and Breakdowns etc.

Planning, Designing and scheduling work of HT/LT distribution & loss in distribution systems.

Estimation & Costing work for PROJECT PLANNING and ENGG DEPTT.

Liasoning work related to ELECTRICITY BOARD, ELECTRICITY REGULATORY COMMISSION & Electrical Inspectorate and GOVT Body.

Utilization of electrical energy, Maximum demand control, Power factor improvement & loss reduction in system.

Skilled at advance planning of purchase functions, involving cost estimation & finalization for purchase of all TECHNOLOGY PARTS.

Handling new projects and maintains the cost of new projects.

Maintenance of DG SETS, SUBSTATION, COMPRESSORS etc.

Finalizing the requirements and specifications, ensuring the completion of project within the specified time & cost parameters and effective resource utilization to maximize the output.

Decreased the schedule maintenance down time hrs. Operate the plant with the minimum consumption of spare, well with in the budget.

Maintenance of 132 K.V, 33KV & 11KV S/S Transformers (12500,3300, 2000 & 1000 KVA), SF6 (2000Amp, 132KV), MOCB (1250 Amp, 11KV), Isolators 132KV, H.T panels, L.T panels, VCB (11 KV, 33 KV& 132KV) & Distribution Boards etc.

Good knowledge of planning & implementation of open excess power purchased system.

Preparation of annual Budget, Power costing, Monthly Performance Report and its implementation.

Spare parts planning of all Electrical & Mechanical Installation and their implementation.

Inventory control of Engg. related items.

Key Achievements

RECENT PROJECTI am looking here the complete project from Electrical Side. The Project completion cost is around 700 crore in which Electrical tender cost is more than 20 crore excluding the cost of 2.9MW solar plant, 132/11KV, ABB make Sub- Station, capacity 12.5MVA * 03 Nos Transformers, D.G. Sets, and 35000 spl Millange spinning plan at Sutlej Industries in 2017.

Attended 60000hrs major overhauling of Wartsila 12V32LN engine. Have done 88000hrs major overhauling of Wartsila 8R32LN engine.Also I have done 84000hrs major overhauling of Wartsila 6R32LN engine. SKILL

Diploma in Computer programming (C, C++).

Microsoft word, Excel, Internet

Interest & Hobbies

Playing Cricket and football.

Listening music.

Traveling.

Strengths

Positive attitude towards my work.

Smart working nature.

Dedicated.

Present Salary : 6.50 Lakhs /Annum + Family furnished Accommodation + Mobile.

Salary Expected : Negotiable

DECLARATION:

I the undersigned hereby declare that the above information is true and correct to the best of my knowledge and belief. I also undertake to provide all necessary testimonials for verification submission, whenever demanded.

Date: 25.09.2020

Place. Pachpahar Road (R.Banerjee)

Bhawanimandi,(Raj.)



Contact this candidate