Name & Address

Rutchawans Supasuwanapong: **/** m 3 Bandchang, MuangPathumthani, Pathumthani, 12000 Thailand Date of Birth: February 13, 1968, Marital Status: Married, Nationality: Thai, Point of Origin: Songkhla Home: 662 -4272597, Mobile: 66-96-191-****: Line ID: rut44; E-mail: adsfiu@r.postjobfree.com, PROSITION : Project Manager

EDUCATION: B.Eng. - Industrial Engineering Rajamangala Institute of Technology, Bangkok (1996) Bachelor Degree : B.Eng. (Industrial Engineering), Rajamangala Institute of Technology, 1996 Diploma Education : Metal Technology Certificate, I.T.V.E. North Bangkok Campus, 1989

: Carrier Transicold 1- week Container training program, Carrier Transicold Co., Ltd., 2002 Vocational Education : Welding & Sheet Metal Certificate, I.T.V.E. North Bangkok Campus, 1987 Secondary Education : M. 3 Certificate, Buranasuksa School, 1983 Primary Education : P. 6 Certificate, Voratit School, 1980 Correspondence Course : Introduction Manufacturing Management, Technological Promotion Association (Thai-Japan) Sanno Institute of Management, Tokyo, Japan, 1993

Seminar Course : Welding and Inspection in Industrial Plant Construction, the Thai Welding Society, 1997

: Basic Server, D Computer Co., Ltd., 2000

: Basic Network, D Computer Co., Ltd., 2000

: ISO 9000; Internal Audit, Paragon Management Co., Ltd., 2001

: Standard of Electrical Installation for Thailand, the Engineering Institute of Thailand, 2001

: Safety for Management, the Eastern Safety Center Co., Ltd., 2001

: Wire Rope and Lifting Equipment, Thai Mui Trading Corporation Co., Ltd., 2002

: Safety for Radioactive, Office of Atomic Energy for Peace, 2002

: Carrier TransCold 1- week Container training program, Carrier TransCold Co., Ltd., 2002

: The Significance of Vibration Analysis in Maintenance, Thai-Germen Institute, 2002

: The Art of Supervisory Skills, Leaning Gallery Co., Ltd., 2002

: The Improvement and Development of Civil Engineer, the Engineering Institute of Thailand, 2003

: The Latest Logistics Case Studies in Asia, Siemens Demotic Logistics Co., Ltd, 2004

: Safety for Confined spaces working, Exsym Corporation, 2007

: Building Inspector, BSA-ACAT-MECT Institute, 2007

: Transmission and Distribution System, the Engineering Institute of Thailand, 2008

: The Radioactive Safety Controller Certificate, Office of Atomic Energy for Peace, 2008

: Financial Management for Executive,Chulalongkorn University, 2009

: Inspection and Testing of Electrical System in the Building, the Engineering Institute of Thailand, 2009

: Fire Protection in Building for Building Manager, the Engineering Institute of Thailand, 2009

: Standard of Sprinkler Pipe according to ASTM A795 and NFPA 13, 14, The Engineering Institute of Thailand., 2010

: Labor Protection Networks, Department of Labor Protection and Welfare, 2012

: : Contract administration & Project Management, The engineering Institute of Thailand, 2013.

: Autodesk Revit Architecture 2014, Autodesk,Synergysoft,Muban Chombueng Rajabhat University, 2013

: Power Management Manager for AEC.,AEMAS.,CU.,The Engineering Institute of Thailand, 2013.

: Safety Officer at Supervisor Level, Safety and Health at Work Promotion Association (Thailand), 2017

: The Improvement and Development of Special License of Civil Engineer, IEAT, 2017

: Mobile Crane Inspector, the Engineering Institute of Thailand, 2017

: ISO 14001: 2015, IBC Industrial Company 2019

a : Safety for Confined spaces working: IBC Industrial co,Ltd. 2020 (PTT Project: Gas Pipe Line)

: Safety Officer at Technical Level, Safety and Health at Work Promotion Association (Thailand), 2020

: Construction Management Foundation; LinkedIn Learning, CA 94085, United States, 2020

: Construction Industrial Safety, CA 94085, United States, 2020

: Cert Prep: PMI agile Certified Practitioner (PMI-ACP), CA 94085, United States, 2020

: 15 Secrets Successful People Know about Time Management, CA 94085, United States, 2020 Extra-Curricular Activities : Membership, the Thai Welding Society

: Membership, the Thai Astronomical Society

: Membership, the Council of Engineers No. 97429

: Membership of the Thai Mechanical and Electrical Consulting Engineering Association.

: Membership of Building Safety Association.

Professional License : Professional Engineering, License IE 14042

: Professional Building Inspection License B1818/2551

: Professional Energy Manager (AEMAS) CEM-TH-194-0713 SUMMARY

Results-oriented manager with extensive experience in high pressure, time-sensitive businesses and proven Record of success in on time. Delivery of product/services. An innovator in logistics and scheduling for Port Containers, Manage Reefer Container 12,000 TEU/Month, 50%Shut-Out Reduced, complex, 24-hour 7- day operation. Decision maker/Re-engineering/ Time Management, OSHA, and employee, reduced dead stock in Warehouse 50%, Make new Warehouse Layout and Relocate, Development background. Team builder/player able to prioritize and supervise employees. Over Eighteen Years of diverse Engineering Experience in Steel Structure Design on TOYU Project New Factory can be modified to be Economical and Cost Reduction by 20 Percent. And stat Quality Control in Power Plant and Infrastructure as Welding Inspector. Over Three years Diverse Pipelines Construction in Oil and Gas (NFPT Project and PTT Project). Reduce Cost of Heavy Equipment and Material 30%. And Increase Productivity by 40% on Direct Pipe and HDD

(Gas Pipeline 42”) Consult and Re-design of HDD Crossing. Providing advice on contract details in case of breaches of the requirements of the relevant departments and explaining the correct details in order to meet the requirements. Provides advice on investigating and preventing Damage that may arise from HDD operation in Granite rocky areas by Issue the Standard of Dummy Test and Standard of Fiber Lapping Film. Time Management of Direct Pipe - HDD Team and Welder Operator Team, Heavy Equipment, Safety, Clear Area of Work, Proven strengths in Engineering, Construction Management, Building Inspector, Cost budget control, Bid preparation Making Bidding Documents 100 Million Baht. To completed within 7 Days at a Reasonable Price and Get a Job. Safety scoping, Site supervision, Documentation, Drawings, and Business management encompassing Planning, Repurchase, Staffing, QC, Scheduling on Construction and Project, Manage Project SLIK (Thailand) New Factory on time can finish in 90 Days., Coordinate Sourcing and Manage 230Kv Underground Cable 7.2Km. HR, QC, Sub-Contractor, Coordinate, Payment, Safety, Supervise, and Controlling all Project We have Team Operators. #Pipe Jacking Team # Direct Pipe Team #Welder Team #HDD Team #TBM Team PROFESSIONAL EXPERIENCE

Company : KSR Roongruang Co.,Ltd. Nonthaburi Jul 2020 to Present Type of Business : Sub Contractor

Position : Project Manager

Project : Pipe Jacking Water Drain Pipe 2000mm. (DOH 304 Project)

: Pipe Jacking Power Cable Pipe 1800 mm. (MRTA PINK LINE)

: CPF; Chicken Processing Plant (Nakhon Ratchasima) 66 MB.

: TPN PROJECT FLUE PIPELINE NORTH-EAST REGION

: Residential welfare project with workplaces and service centers for civil servants

(Nonthaburi) 72MB

Project Management/Time Manage of all Pipe Jacking Pipe 1800mm. in MRTA PINK LINE / Pipe 2000mm. DOH Water Drain Project Coordinate with CIVIL ENG. and DOH / HDD for Power Cable and Flue Pipeline manage all work Operation on Quality and Procedure Manage and Control all Material, Safety, and good at a coordinate And following up assignment good at time Management, Service-minded, Trouble Shooter, Resourceful, Organized, Systematic, Responsible, Action-Oriented, Cooperative, Good negotiator, Skillful at supervising And controlling, Deal with Contractors in areas of work and Manufactory work. Reporting of malfunctions, Inspection report and all accident in addition, all documentation as per customer's requirements and up to date Company : IBC Industrial Co., Ltd. Chachoengsao - Nonthaburi Nov 2019. To Jul 2020 Type of Business : Contractor

Position : Direct Pipe Manager and Assistant HDD Manager Project : The Fifth Transmission Pipeline Project Phase II (5TP2) PTT Project (45000MB) Project Management/Time Manage of all HDD and Direct Pipe in 5TP2 Project, Coordinate with EGAT, DOL, WTL and PTT Manage all Subcontractors to Operation on Quality and Procedure .Manage and Control all Material, Safety, CR and As- Built DWG. Reduce Cost of Heavy Equipment and Material 30%. And Increase Productivity 40%. Consult and Re-design of HDD Crossing. Good at coordinate and following up assignment. Good at time Management, Service-minded, Trouble Shooter, Resourceful, Organized, Systematic, Responsible, Action-Oriented, Cooperative, Good negotiator, Skillful at supervising and controlling, Deal with sub-contractors in areas of work and manufactory Work. Reporting of malfunctions, Inspection report and all accident in addition, all documentation as per customer's Requirements and up to date

Company : INFINITY SERVICE Co., Ltd. Tak City Nov 2018. To Oct 2019 Type of Business : CONSULTANT

Position : Construction Management (Consultant)

Project : North Flue Pipe-Line Project (12000 MB)

Time Management for Consult all of Pipe-Line Project Management, Construction, Coordinate with DOH, TOT, CAT, PWA Providing advice on contract details in case of breaches of the requirements of the relevant departments and Explaining the correct details in order to meet the requirements. Provides advice on investigating and preventing Damage that may arise from HDD operation in granulated rocky areas. Manage all Subcontractors to Operation on Quality and Procedure .Manage and Control all Material, Safety, CR and As- Built DWG. Good at coordinate and following up assignment good at time Management, Service-minded

, Trouble Shooter, Resourceful, Organized, Systematic, Responsible, Action-Oriented, Cooperative, Good negotiator, Skillful at supervising and controlling, Deal with sub-contractors in areas of work and manufactory work. Reporting of malfunctions, Inspection report and all accident In addition, all documentation as per customer's requirements and up to date. Company : STREGA PUBLIC COMPANY LIMITED. Lamlukka ; Pathum Thani Nov 2017 To Oct. 2018. Type of Business : Contractor (HDD, PIPE LINE)

Position : Sr. Project Manager-Contract

Project : Northern Fuel Pipeline Transportation (12000MB) (FPT Project)

: SIAMPATHUM GROUP; Water Pipeline Pathumtani 5.0 Km. (HDD 900 M.) D= 1000 mm. 800 mm.

: SUPPLY INTREGESTION SERVICE; HDD Gas Pipeline 350 M.; D= 150mm. (WHA)

: THONGSANKOND; HDD POWER CABLE 150 M. ; D= 90 mm. (KATHUMBAN) Responsible for all of NFPT Project Management, Construction, Coordinate and Budget. Secondary manage all facilities are operating to optimum capacity and efficiency. Manage and Control all Material, Safety, Transportation, and As DWG. In addition, QC of Project. Implementation scheduling, document, payment and coordinate with Consultant (CSC & PMC), Sub-Contractor (CPP, SPC, HDDT, MP, TPT, UGO, P329, GREAT, MIT, GPC) and FPT. Good at coordinate and following up assignment Good at time Management, Service-minded, Trouble Shooter, Resourceful, Organized, Systematic, Responsible, Action-Oriented, Cooperative, Good negotiator, Skillful at supervising and controlling, Deal with sub-contractors in areas of work and manufactory work. Reporting of malfunctions, Frack-out report, Inspection report and all accident In addition, all documentation as per customer's requirements and up to date. Company : JMM INTER CO., LTD., JUN THAILAND CO., LTD. (Korea) Asoka; Bangkok: Oct 2016 To Oct 2017. Type of Business : Sub-Contractor (Steel Structure, Civil, M&E, Factory) Position : Project Manager, Assistant General Manager. Project : Thai Daerim Precision Project. (Korea Company: 80 Million) Responsible for all of Project Management, Construction, Coordinate and Budget. Secondary manage all facilities are operating to optimum capacity and efficiency. Manage and Control all Material, Safety, Transportation, and As DWG. In addition, QC of Project. Implementation scheduling, document, payment and coordinate with Consultant (DKJ), PEA, WHA, IEAT and DAERIM Good at coordinate and following up assignment Good at time Management, Service-minded, Trouble Shooter, Resourceful, Organized, Systematic, Responsible, Action-Oriented, Cooperative, Good negotiator, Skillful at supervising and controlling, Deal with sub-contractors in areas of work and manufactory work. Reporting of malfunctions, Inspection report and all accident In addition, all documentation as per customer's requirements and up to date. Company : THAI AGRO EXCHANGE CO., LTD. Pathum thani, May 2015 To Oct. 2016. Type of Business : The largest wholesale food market in South East Asia Position : Construction Manager Reason for resign: Lack of career advancement Project : Refer Container Building Project 250MB (RITTA)

: Garbage Center II, III, IV, V

: Land Development Land no. 161416 and Land no.31344 Responsible for all New Project Management, Construction and Architects work. Secondary maintenance of all construction and manage all facilities are operating to optimum capacity and Efficiency. Manage oversee and Control all Material Stock, Safety, Transportation, Cold Storage Maintenance, Servicers, and DWG. In addition, Design all Project. Implementation Scheduling, and Good at Coordinate and following up assignment Good at time Management. Deal Contractors in Areas of work, Skillful at supervising and controlling, Deal Contractors in areas of work and reporting of Malfunctions, and all new project Construction and Maintenance Section. Company : Q.T.T. Co., Ltd. (Singapore) Pathum Thani, Apr 2011 To Apr 2015 Type of Business : Sub-Contractor (Steel Structure, Civil, M&E, Factory) Position : General Manager, Project Manager and M&E Manager Reason for resign: Layoffs Project : SLIK Project (Japanese Company: 45 Million)

: CHOSEN Pinthong Project (Singapore: 40 Million)

: M&E Project (TOYOTA, TOYU, BELTON, LITE-ON, JCY)

: Saraff Energy (Biomass Power Plant: 99Mw)

Project Management, Time-Cost Management Coordinator and Control all staff and Sub-Contractor. Secondary manage all facilities are operating to optimum capacity and efficiency. Manage and Control all Material Stock, Purchasing, Safety, Transportation, and As DWG. In addition, Tender, Design and QC all Project. Implementation scheduling, payment and coordinate With Consultant, Affair, Sub- Contractor, IEAT, PEA, WHA and Owner. Deal with sub-contractors in areas of work and manufactory work. Reporting of malfunctions, Inspection report and all accident in addition, all documentation as per customer's requirements And up to date.

Company : Fivebond Co., Ltd Bangkok, Mar 2010 To Mar 2011 Type of Business : Distributors and Service of Material Handling Equipment (MHE.) Position : Engineering and Service Manager Reason for resign: End of Contract Service Management, Support Sales, Tender and Maintenance of Material Handling Product. Secondary manage all facilities are operating to optimum capacity and efficiency. Maintaining of sufficient stock of MHE. Spare part. Engineering Designs and Proposes the Best Solution to Customer. Supervise Sub-Contractors for Transport, Installation, Inspection, Safety and Acceptance Test. Company : Exsym Corporation. (Japan) Bangkok, Jun 2006 To Feb 2010 Type of Business : Cable Manufacture and Installation (High Volt & Sub-Marine Cable) Position : Project Coordination & Contract Manager, Asst’ PM. Reason for resign: End of Contract Project : Construction of 230 KV Underground Transmission Line between Bangkapi and Chidlom Terminal Stations Project: Contract No. CF 7-9001-WBA (3000 Million Baht) MEA Project Project Coordinate for all Contracts of local staff and Sub-Contractor. Provide the required staff, distributors, and Contractors. Secondary management all facilities are operating to optimum capacity and efficiency. Manage and Control all Material, HR, Process Document Contract Payment, Control Safety/Transportation, and As DWG. In addition, Manage QC all Project. Implementation schedule, document, payment, and coordinate with Consultant

(ATT & EDF), EGAT, BMA. And MEA. Good at Coordinate and following up on assignment Good at time Management, Service-minded, Trouble Shooter, Resourceful, Organized, Systematic, Responsible, Action-Oriented, Cooperative, Good negotiator, Deal Contractors in Areas of work, Skillful at supervising and controlling, Deal with sub-contractors In areas of work and manufactory work. Reporting of malfunctions, Cable Dent, Scratch of HDPE pipe, Inspection Report, and all accidents in addition, all documentation as per the customer's requirements and up to date. Providing advice on contract details in case of breaches of the requirements of the relevant departments and Explaining the correct details in order to meet the requirements. Coordinate all Material, Document, Schedule, Payment and Safety with Consultant (ATT, EDF), EGAT and MEA Company : Qualitec Engineering and Construction Co., Ltd. (Thai & France) Bangkok, Dec 2004 To May 2006 Type of Business : Sub-Contractor (Steel Structure, Civil, M&E., Oil & Gas) Position : Asst' Purchasing Manager Reason for resign: Lack of career advancement Develop and execute sourcing strategy for key spending pool. Responsible for sourcing and Ordering of all equipment’s, Instruments, supplies and services that will be required. Monitor and track the performance of the suppliers. To be the Trainer for the Purchase's Customers and suppliers to comply with the Company Policies and Purchasing Procedures. To be the system owner for key control objective for control self-assessment of purchasing System. Lead on cost saving in the responsible area. Company : Yumark (Thailand) Co., Ltd. (Thai & Taiwan) Bangkok: Sep 2002 To Nov 2004 Type of Business : Garment and Decorate

Position : Warehouse Manager Reason for resign: Lack of career advancement Responsible for developed and managed warehouse stock .Secondary planed Warehouse Performance. Planed the Raw Materials and Finish Goods for Logistic System. Reduce dead stock by 50% through stock data and used for new order. Improved storage layout of all materials for easier storage and reduce the time to find the material Report to Factory Manager.

Company : LCB Container Terminal 1 Ltd. (Thai-Japan) (MEARK Line) CHONBURI: Mar 1999 To Aug 2002 Type of Busines : Services (Container Port)

Position : Service and Facilities Superintendent Reason for resign: Lack of security in working life. Responsible for all technical services and maintenances heavy Machines and reefer container

. Secondary manage all terminal facilities are operating to optimum capacity and efficiency. Maintaining of sufficient stock of reefer spare part and report to Maersk Line. Selection of contractor, evaluation of BOQ. Deal with sub-contractors in areas Of civil work, infrastructure and facilities. Reporting of malfunctions, shut-out In addition, Reefer documentation as per customer's requirements and up to date. Responsible for scheduling of reefer section duty staff. Manage Reefer Section and Reporting for Reefer Container as 8,000 TEUs to 12,000 TEUs per Month. Reduced Reefer Container Shut-Out by 50% Through Accurate data and Reported before loading 1 Hr. Manage the Civil Sub-Contractor in the construction of 1.5 x 60m high 0.25m thickness of Roads for Rubber Tire Gantry crane Way, Construction of 4.0 x 30m high 0.30m thickness of Roads for Gate In-Out No. 4 and Recovered Asphalt of 200m x 4m on Yards and Gates. Install new Transformer of 2000 KVA. Supply for Reefer Container 600-800 TEUs. And remove old Transformer of 1000 KVA, Installation new Steel Structure (Cat Walk) for 4 Units. Planed Reefer Container Pre-Test Inspection increases 50% to 3000 TEUs / Weeks Planed the Reefer Container area of stockyard. For Import / Export 7000 TEUs / Weeks. Reduced Top Customer Complaint Quality Problem of Reefer Container by 50%. Removed Rust of Gantry Crane Rails for 600m and Re- Painting. Report to Engineering Manager or General Manager. Company : 72 Engineering Co., Ltd. Bangkok Feb 1995 To Mar 1999 Type of Business : Sub-Contractor and Supplier

Position : Asst’ Engineer Manager. Reason for resign: Lack of career advancement Project : Screw Conveyor 0.6m Diameter, 10m. Length. Total 30m.for Siam Concrete Cement Cooperation

: Steel Structure in Ventilation station for subway MRT and Emergency Elevator Structure Responsible for technical services, maintenances and Supply power machines. Secondary manage all machines and facilities are operating ta optimum capacity and efficiency. Development all project planning, safety and maintenance project-wide. Design and Development of Civil work and Steel Structure. Manage and Selective of Sub-Contractors For new Project Manage all Technical Work on Sites and Workshop. Set up Optimized Process In addition, Material Improvement. Engineering Designs and Proposes the Best Solution to Customer. Supervise Sub-Contractors for Installation, Inspection, and Acceptance Test. Coordinate with Customer, Sub-Contractors and All Third Parties Regarding Site Survey, Survey Report, Installation Drawing and Implementation Scheduling. Analysis of Project Contract Requirement. Company : Italthai Industrial Co., Ltd. Samutprakan, Mar 1992 To Jan 1995 Type of Business : Steel-Structure Construction

Position : Welding Inspector and Post Weld Inspector Reason for resign: End of Contract Project : South Bangkok Combined Cycle Power Plant Construction of Power-Plant of Combined Process 2 x 300MW. (SBCC1-2H PROJECT) EGAT THAILAND. Responsible for Inspection of Weldment and Post Weld Heat Treatment (PWHT).

- Monitor Progress / Documentation and Technical Problem

- Liaise with the Client and Ensure Safety Awareness on Site.

- Inspection /Documentation Closed out to ASEM IX, ANSI B31. AWWA D-100, SSPC, SA, and TRD. Company : Watpatanalohakit Workshop Bangkok, Nov 1989 To Jan 1992 Type of Business : Machining Workshop

Position : Technician Reason for resign: Lack of career advancement

Responsible for Produce Machine parts of Feed Mill Manufacture. In addition, Inspection. Report to Supervisor

- Produce some Machine past for Feed Manufacturing .CP, Betago, Sunfeed, Centago, Unicord,…

- Produce some Machine past for Exporters. .Nanapan, Tamung taiheng, … References

- Mr. Prasert Mannoi, PDC SGK Supervisor, PTTEP Tel: 66-81-373****,, 66-74-338850

- Mr,Chen Zhongju,Project Manager, China Petroleum Pipeline Bureau (CPP), Tel : 66-94-816****

- Mr. Prakasit Salasuk, Director, Thai - cool Co., Ltd., Tel: 66-81-339****

- Mr. Sumit Sourammart, Production Manager, Excell Press Co., Ltd., Tel : 66-2-2941699, 66-84-147****

- Mr .Wuthipong Sangpan, Site Manager, Sinohydro Coporation Limited., Tel : : 66-94-350-****