Post Job Free
Sign in

Project Superintendent Manager

Location:
Bakersfield, CA
Posted:
September 03, 2022

Contact this candidate

Resume:

Timothy J. Brady

***** **** ******* *****

Bakersfield, CA 93312

Cell: 661-***-**** ·

Email: ******@***.**.***

PROFESSIONAL EXPERIENCE

BERNARDS, San Fernando, CA 2016 to Present

Project Superintendent, Commercial Construction

Supervision of all construction activities including site work, infrastructure and building construction. Schedule inspections and walk through jobs with inspectors and building owners. Rectify any problems with appropriate subcontractors.

Project List:

• Bakersfield College, Science and Engineering Building : New $53,000,000 construction of 3- story building consisting of general classrooms, state-of-the-art class labs, robotics lab, and faculty workspaces. Scope includes all hookups and utilities so all rooms can function as either a lab or a classroom.

• County of Tulare, South Detention Facility : New Type-II, $52,600,000, 500-inmate detention facility comprised of one- and two-story tiered buildings including laundry, kitchen, dining, medical, video visitation, and program space.

• Faraday Manufacturing, Faraday Future Retrofit Project : Retrofit and new construction on an existing tire manufacturing plant into a 983,700 SF electric car manufacturing and assembly plant. The complete project will include office space, restrooms, truckers lounge, break room, lunch area, conference room, parts storage, vehicle painting booth, vehicle assembly and testing area, tool storage, maintenance and show room.

• County of Fresno, West Annex Correctional Facility : $82,100,000, Type II, 4 story, 300 bed, concrete structure Detention Facility with a full basement and will connect to the existing jail via underground tunnel.

• CA Dept. of Corrections, Wasco State Prison : New construction, renovations, and reconfigurations in medium custody facility that provides short-term incarceration while inmates are physically and mentally evaluated before permanent placement.

• Henry Mayo Newhall Hospital, New Patient Tower : Design-build delivery of a new 6-story, 116-bed patient tower with dedicated maternity floor, 3 floors of medical surgical rooms, kitchen/serving/dining areas with exterior dining garden, loading dock, central plant, and rooftop helipad.

• Tehachapi Valley Healthcare District, Tehachapi Valley Hospital : The new 25-bed, 78,979 SF facility will replace the existing hospital, to meet current California Seismic Safety Standards. It is designated as a critical-access rural facility, offering acute care and outpatient services. PATTERSON BUILDERS, Delano, CA 2015 to 2016

Project Superintendent, Commercial Construction

Supervision of all construction activities including site work, infrastructure and building construction. Schedule inspections and walk through jobs with inspectors and building owners. Rectify any problems with appropriate subcontractors.

Project List:

• Vineyard Offsite Delano : Underground wet utilities, curb, gutter, soil import, Cement treatment and paving for Dover, Wollomes, Morse and Albany.

WALLACE AND SMITH CONTRACTORS, Bakersfield, CA 2005 to 2015 Project Superintendent, Commercial Construction

Direct supervision of all construction activities including site work, infrastructure and building construction. Schedule inspections and walk through jobs with inspectors and building owners. Rectify any problems with appropriate subcontractors.

Project List:

• Kern Schools: Assist on two 3 floor Administration Buildings.

• Solera Recreation Center: Recreation Center Building and site including pool, tennis courts, bocce ball courts, pool house, and gym.

• Action Sports: Sporting Goods Supermarket.

• Prime Cut: Restaurant

Bakersfield Crossing Shopping Center: Three buildings and infrastructure for fast food restaurant.

• Apple Surgery Center: New surgery center and doctor offices.

• San Joaquin Bank: Built new branch building. LEEDS Ce1tified

• Aera Energy: Remodel three floors of existing building while occupied, work done during night.

• Beckes Apartments: 56 Single family units.

• Colombus Street Apartments: 58 Single family units.

• ·Baker Street Apartments: 60 Single family units with community building. HAWKINS DESIGN CONSTRUCTION, Nashville, 1N 1998 to 2005 Project Superintendent, Commercial Construction

Tiris Design/Build contractor specialized in churches, warehouses, and industrial buildings. Coordinated all subcontractors to perform their respective jobs according to specifications. Coordinated pre-engineered metal building installation and tilt up panel erections. Project Superintendent Project List:

• Old Hickory Investors: 40,000 ft. Warehouse. Constructed a new pre-engineered metal building for warehouse space.

• Interplastics Nashville: Warehouse. Constructed a new warehouse with 4 hr. walls and containment areas for chemical storage.

• Christian Gospel Temple: A new $3,500,000.00 sanctuary, kitchen, dining room, and classrooms.

• Hollister: New 100,000 concrete tilt up warehouse with office space.

• Tennessee Processing Center: 162,000 sq ft data processing center for the Bank of New York. Project Manager, Commercial Construction

Estimated projects, prepared schedules, prepared billing and acted as liaison between client and general contractor.

Project Manager Project List:

• Dismas Charities: $1,500,000.00 remodel existing building convert to halfway house for prison parolees in Memphis.

• AmSouth Bank: Various remodels of AmSouth Bank branches across Tennessee. Page3

BATTEN AND SHAW, INC., Nashville, TN 1993 to 1998

Project Superintendent, Medical and General Contractor Coordinated all subcontractors to perform their respective jobs according to specifications. Scheduled inspections and walk through jobs with inspectors and business owners. Rectified any problems with appropriate subcontractors.

Project List:

• Summit Medical Center: Add a new operating room to the existing hospital.

• American Transitional Hospital: Remodel two floors of the old Park View Medical Center and add a sprinkler system.

• Summit Medical Center: Build out top floor of the new hospital convert to a medical surgery suite.

• Athens Medical Center: New addition to the existing x-ray dept for a magnetic resonance imaging.

• John Moore and Associates: New 100,000 sq ft warehouse and office facility. HEALTHCARE ENVIRONMENTS, Pasadena, CA 1991 to 1993 Medical Project Superintendent, Design/Build Medical Contractor Coordinated all subcontractors to perform their respective jobs according to our specifications. Met with clients and prepared prima vera scheduling. Scheduled inspections and walked through jobs with OSHPD inspectors and clients.

Project List:

• University Imaging Center: Add a new MRI to the existing facility.

• USC Medical Center: Cath lab.

• USC Medical Center: x-ray # 9. Remodel and add a new x-ray machine to room #9.

• Huntington Medical Group: Build a new facility for doctors' offices in Temple City.

• Santa Monica Hospital: Build out a new physician's office.

• Huntington Medical Group: Remodel 30,000 sq ft of an existing office-building convert to doctors’ offices.

KEY CONSTRUCTION, INC., Rancho Cucamonga, CA 1989 to 1991 Medical Project Superintendent, Medical Contractor Coordinated all subcontractors to perform their respective jobs according to our specifications. Scheduled inspections and walked through jobs with OSHPD inspectors and clients. Project List:

• Century City Hospital: Laminar flow. Demo an existing surgery suite and add a new laminar flow system.

• Doctors Hospital Montclair: Add a new CT scan to the existing x-ray facility.

• Ontario Community Hospital: Neonatal ICU. Remodel existing new natal intensive care unit.

• White Memorial Medical Center: Miscellaneous remodels of the existing hospital. Page4

AVCON, INC., Lancaster, CA 1986 to 1989

Medical Project Superintendent, Medical Contractor Coordinated all subcontractors to perform their respective jobs according to our specifications. Scheduled inspections and walked through jobs with OSHPD inspectors and clients. Project List:

• White Memorial Medical Center: ENT Clinic. Demo existing space and build a new ear, nose and throat clinic.

• White Memorial Medical Center: Eye Clinic. Demo existing space and build new eye clinic.

• White Memorial Medical Center: Miscellaneous x-ray room additions.

• Antelope Valley Hospital: Medical surgery unit.

• Victor Valley Community Hospital: ICU Remodel.

EASTON CONSTRUCTION, INC., Saugus, CA 1983 to 1986 Project Superintendent/Project Manager, Medical Contractor Coordinated all subcontractors to perform their respective jobs according to our specifications. Scheduled inspections and walked through jobs with OSHPD inspectors and clients. Project List:

• Henry Mayo Newhall: Med Surg. III. A medical surgery addition to the existing hospital.

• Henry Mayo Newhall: Emergency Department addition.

• Community Hospital Gardena: Renovation to the existing Intensive Care Unit.

• White Memorial Medical Center: New psychiatric unit addition to the existing hospital.

• Simi Valley Adventist Medical Center: Replace 39 air handler units on the existing hospital.

• Sonora Community: Physical therapy unit.

• Glendale Adventist Medical Center: Miscellaneous remodels. EMPLOYED IN CONSTRUCTION-RELATED ACTIVITY SINCE 1983 EDUCATION Saugus High School, Saugus, California

College of the Canyons, Newhall, California

Antelope Valley College, Lancaster, California



Contact this candidate