Career highlights
A highly motivated and proactive Quantity Surveyor with work experience in Pre- & Post-Contract works for Oil and Gas sector, Roads & Infrastructure, Building, MEP and Hospitality in UAE and Pakistan.
Familiarity of Professional Standards:
FIDIC Conditions of Contract
Principles of Measurements (International)(POMI)
Civil Engineering Standard Method of Measurements (CESMM3)
Detailed Experience
ADNOC PMC
April 2022 to Continue….
Client: ADNOC on Shore (Abu Dhabi Company for on shore Petroleum Operations LTD.)
Contract No. 16942.01
Project: EPC for the Replacement of MOL (MOL-1.2 & MOL-3.5) and related works
Project Scope: EPC for the Replacement of 36” Main Oil Line MOL-1.2 & 3.5 including Pig Launcher, Pig Receiver, Block Valve Stations, By Pass Stations, RRE Take off Stations, RRW Take off Stations, Chemical Injection facilities, CP Station / Solar Station, ICMP Station (Internet Control Message Protocol, leak Detection System including all Mechanical, Civil, Telecommunication and HSE Works.
Duties and Responsibilities:
• Commercial Post- Contract Review
• Preparation of Interim Payment Certificate considering the QA/QC approved Inspection requests for Material delivery+ Progress on site according to the Contract Measurement Criteria following the Payment terms & Conditions according to the Contract.
• Reviewing Interim Payment Application considering the QA/QC approved Inspection requests for Material delivery+ Progress on site according to the Contract Measurement Criteria following the Payment terms & Conditions according to the Contract and preparation of Interim Payment Certificates for the Contractor.
• Calculation of recapitulate (Recap) Quantities of the Project considering the changes in the Scope.
•Review and verification of Contractual Obligation and preparation of variation (NAP) and claims submitted by Contractor.
Detailed Experience
TECNICAS REUNIDAS Abu Dhabi
Oct-2020 to Dec-2021 Senior Quantity Surveyor
Client: ADNOC on Shore (Abu Dhabi Company for on shore Petroleum Operations LTD.)
Contract No. 16566.01
• Project: (BUIFDP) Integrated Field Development Project Oil and Gas Field (Worth 1.4 Billion$) Engineering Procurement and Construction for Bu Hasa Integrated Field Development Project.
Scope of Work. 1. Pre-work’s Scope-Removal and Rerouting (Removal and Rerouting of Existing OHL, Existing Pipe lines and Flow Lines, Removal and Rerouting of FOC cable, Existing Roads and Tracks.
2. Bu Hasa Gathering facilities expansion including RDS-1, RDS-2, RDS-3 Modification. Including on Pad Oil Producer wells, Water Injection Wells De-Sharing off Pad Wells, Total Well Counts-126 etc. Including well Plats Developments complete (Well Process area & Well Bay Area Complete with Piping, Instrumentation, Well Head Control Panels, Cabling. Etc.)
3. Bu Hasa Gas Lift Phase II (Including 2 Compression trains, Gas dehydration Unit, Gas Supply from 1st Stage Separator, Providing Gas lift to 143 off Pad wells and 35on Pad wells, Existing NGIP modification and Pipe Line Network.)
4. Produced Water Reinjection Phase I and II (GRE Network total -83.5Km.
5.CDS Dry to Wet trains conversion and Brown field (Including Modification of 3 Existing Separation from dry to wet Trains, Modifications of Produced Water Handling System to Cope with additional PW profile.
6. Tie in Scope.
7.Fencing Works
8. 33 KV Over Headlines (OHL) (Includes Modification of Existing Sub Station, OHL network includes 33KV Double Circuit Main OH Lines and Branch Lines
9. Builds Works (Including i-UBS & Battery Building, ii-CCR Building, iii- Guard House Building, iv- 33KV Sub Station Buildings, v-ETR and ITR Buildings.
Duties and Responsibilities:
• Commercial Post- Contract Review
• Preparation of Interim Payment Application considering the QA/QC approved Inspection requests for Material delivery+ Progress on site according to the Contract Measurement Criteria following the Payment terms & Conditions according to the Contract.
• Reviewing Interim Payment Application considering the QA/QC approved Inspection requests for Material delivery+ Progress on site according to the Contract Measurement Criteria following the Payment terms & Conditions according to the Contract and preparation of Interim Payment Certificates for the Sub-Contractors.
• Reviewing and Certification of Final Account for the Project Sub-Contractors according to the Contract Terms & Conditions.
• Calculation of recapitulate (Recap) Quantities of the Project considering the changes in the Scope.
• Identification of Contractual Obligation and preparation of variation (NAP) and claims
• Preparation of Bar Bending Schedule.
• Engineering follow up for the IFCs, Specifications and any other Changes.
.
M/s. DMF Engineering
Nov 2016 to Sep. 2020, Sr. Quantity Surveyor
Client: Wasl Asset Management Group
Projects:
• F1004-Jebel Ali Development on Plot 500-1698 Dubai
Scope of Work: Utility Buildings, Roads & Infrastructure Works, Including Sewer network, Storm Water Network, Irrigation Network, Fire Fighting Network, Potable Water Network, Irrigation and Fire Pumping Stations, Sewer Pumping Station. Storm Water Holding Tanks, Telecommunication Networks including Meet Me Room, protection removal and reinstatement of Existing Services as per Authority requirements, Traffic Signals.
Contractor: Al Naboodah Contracting co. LLC
• F1002-Nad Al Hamar village Roads and infrastructure works Package
Scope of Work: Roads & Infrastructure Works Package including all Utilities Sewer, Storm water, Potable Water, Irrigation Network Fire Fighting Network, Irrigation and Fire Water Pumping Stations.
• R1061- Dubai Police Car Holding Section Al Warsan 3rd on Plot 811- 0870, Dubai
Scope of Work: Dubai Police Office Buildings, Bulk Earth works, Roads & Infrastructure Works including Boundary walls security gates and Parking’s.
• R1062- Dubai Police General H.Q Car Holding Section Al Ttay on Plot 2840114
Scope of Work: Dubai Police Office Buildings, Bulk Earth works, Roads & Infrastructure Works including Boundary walls security gates and Parking’s.
Duties and Responsibilities:
• Commercial Post- Contract Review
• Tender Reviews & Remarks
• Preparation of Tender Doc. BOQ, Volume 1. Addressing Tender Quarries,
• Reviewing Interim Payment Application and preparation of Interim Payment Certificates to the client.
• Preparation of Final Account for the Project
• Preparation of weekly and monthly Progress Report.
• Calculation of recapitulate (Recap) Quantities of the Project which used for the progress reports.
• Identification of Contractual Obligation and preparation of variation and claims
• Preparation, review and finalization of Final Account, discharge certificates and PTOC & FTOC Reports
M/s. Tyco Fire & Security LLC, UAE
Jan 2016to Nov 2016, Sr. Quantity Surveyor & Estimation Engineer
Scope of Work:
Foam Water and Dry Powder Skid-Mounted Separation systems
Gas extinguishing systems enclosures
Fire Hydrants and Pipe works Fabrication Design and Installations
Fire and Gas deduction systems
Public Alarms /General Alarms PA/GA.
Security Systems as Under
CCTV Systems
Access control systems
Intruder alarms
Integrated Systems
Physical security integrated Management system
Perimeter Protection.
Duties and Responsibilities:
Commercial Post- Contract Review
Tender Reviews & Remarks
Preparation of Interim Payment Application to the client. (IPA).
Preparation of Interim Payment Certificate (IPC).
Preparation of Final Account for the Project
Preparation of weekly and monthly Progress Report.
Preparation of materials report, consumed in a month.
Calculation of recapitulate (Recap) Quantities of the Project which used for the progress reports.
Checking of Subcontractor invoices and preparation of subcontractor Payment Certificates.
Identification of Contractual Obligation and preparation of variation and claims
Preparation of material tracking log.
Preparation of Sub-Contractor Accounts & Maintaining Record.
M/s. Belhasa Projects LLC
Sept 2013 to Dec 2015, Sr. Quantity Surveyor & Estimation Engineer
Client: Nakhel PJC Dubai
Projects: Infrastructure Works Package Nos. 11 to 18 at Al Furjan Area, Dubai
Scope of Work:
Construction of Sewerage Network, Storm Water Network, Portable Water Network, Chilled Water Network, External Fire Fighting Network, Internal Fire Fighting Network, Irrigation (Primary and Secondary Network). Road Networks, Street Lighting Network and Gas Network, 11 KV Power Distributions, LV Power Distribution and Fire & Irrigation Pump house.
Dragon Mart Expansion-International City External Works Package Contract No. DMS 134783
Scope of Work:
Construction of Utility Building including all External Services Sewerage Network, Storm Water Network, Portable Water Network, Chilled Water Network, External Fire Fighting Network, Internal Fire Fighting Network, Irrigation (Primary and Secondary Network) Hard & Soft Landscaping, and Water features etc. Road Network, Street Lighting Network.
Client: FEWA (Federal Electricity and Water Authority)
FEWA CONTRACT 8W/2011 - Water Transmission Networks at Umm Al Quwain City.
FEWA CONTRACT 11W/2011 - DN600 Transmission Pipeline from Thouban to Masafi W.D.C.
FEWA CONTRACT NO.14W2011 - 2X10MIG RCC Water Tanks at Burairat WDC-Rak.
FEWA CONTRACT NO.15W2011 - 2X4MIG RCC Water Tanks at Shokha Area –Ras Al Khaima.
Duties and Responsibilities:
Preparation of Interim Payment Application to the client. (IPA).
Preparation of Interim Payment Certificate (IPC).
Preparation of Final Account for the Project.
Preparation of SAP Report as per FEWA requirements
Preparation of weekly and monthly Progress Report.
Preparation of materials report, consumed in a month.
Calculation of recapitulate (Recap) Quantities of the Project which used for the progress reports.
Checking of Subcontractor invoices and preparation of subcontractor Payment Certificates.
Identification and preparation of variation and claims.
Preparation of bar bending schedules.
Preparation of material tracking log.
Preparing Subcontracts according to scope of works, including Subcontracts BOQ, Specifications, Drawings, Contracts conditions following FIDIC.
Coordination with Venders, Suppliers for Material Delivery, LPOs, Maintaining Tracking for Material Deliver, Order, and Certifying the Invoices for suppliers.
Preparation of Sub-Contractor Accounts & maintaining Record
Client: EMPOWER PJC
Construction, Completion and Maintenance in the Defect Liability Period of DIFT Network Extension along Road 312 to Zabeel with Connection to WTC.
Scope of Work:
Construction of Chilled Water Network 300 mm diameter Line to 1050 mm Diameter Chilled Water HDE Pre-Insulated Carbon Steel Pipe lines with Network Valve Chambers and NDM Road Crossings. Communication Ducts & Cable removal & Re-instatement of Paved Area and Landscape Area.
Engineering, Procurement, and Construction of Tabreed District Cooling Scheme Shams 01 Plant Expansion Abu Dhabi.
Duties and Responsibilities:
Preparation of Interim Payment Application to the client. (IPA).
Preparation of Interim Payment Certificate (IPC).
Preparation of Final Account for the Project.
Preparation of weekly and monthly Progress Report.
Preparation of materials report, consumed in a month.
Calculation of recapitulate (Recap) Quantities of the Project which used for the progress reports.
Checking of Subcontractor invoices and preparation of subcontractor Payment Certificates.
Identification and preparation of variation and claims.
Preparation of bar bending schedules.
Preparation of material tracking log.
Preparation of Sub-Contractor Accounts & maintaining Record.
M/s. Al Salmeen General Contracting Establishment
Jan 2011 to Aug 2013, Quantity Surveyor
Project: Construction of Sewerage Connections and Related Works Abu Dhabi Island and Main Land Phase-V
Scope of Work: Sewerage Lines Upvc and GRP from 160/150 OD/DN TO 700mm diameter and up to 12Meter Deep, NDM Works, Construction of Sewerage Lifting Station and related Works in Presidential Palace Ras Al Akhdar, Construction of Secant Pile, & Jet Grouting for the Line and Construction of Curtain Walls.
Duties and Responsibilities
Preparation of Interim Payment Application to the client. (IPA).
Calculation of Quantities of above mentioned work
Calculation of Material Quantities of above mentioned work
Preparation of Interim Payment Certificate (IPCs).
Preparation of weekly and monthly Progress Report.
Preparation of materials report, consumed in a month.
Calculation of recapitulate (Recap) Quantities of the Project which used for the progress reports.
Checking of Subcontractor invoices and preparation of subcontractor Payment Certificates.
Identification and preparation of variation and claims.
Preparation of bar bending schedules.
Preparation of material tracking log.
Control the status of check requests.
Preparation of Sub-Contractor Accounts & maintaining Record
M/s. Public Works Department High Ways Division Rawalakot
Aug 2006 to Sept 2007, Sub Division Engineer
Projects:
Rehabilitation of District Main Roads and Branch Roads
Rehabilitation and Reconstruction of Infrastructure and Government Buildings in District Poonch and Bagh
Duties and Responsibilities
Road Works
Infrastructure Works and
Building Works Supervision
M/s. Nael and Bin Harmal Hydro Export Establishment
Jan 2004 to Jul 2006, Quantity Surveyor
Project: Al Hilli Residential Complex at Al Hilli Industrial Area Al Ain Phase 1
Scope of Work: Road work, Sewer work, Irrigation work, Strom water work, Sweet Water work, Street Lighting and Electrical Work Proposed and Relocation11KV and 33KV Cable Telecom.
Duties and Responsibilities:
Preparation of Interim Payment Application to the client. (IPA).
Calculation of Material Quantities of above mentioned work
Preparation of Interim Payment Certificate (IPCs).
Preparation of weekly and monthly Progress Report.
Preparation of materials report, consumed in a month.
Calculation of recapitulate (Recap) Quantities of the Project which used for the progress reports.
Checking of Subcontractor invoices and preparation of subcontractor Payment Certificates.
Identification and preparation of variation and claims.
Preparation of bar bending schedules.
Preparation of material tracking log.
Control the status of check requests.
Employment record
from – to
Oct 2020 to Continue
employer/description of duties
TECNICAS REUNIDAS ABU DHABI
Sr. Quantity Surveyor Contracts and Commercial Engineer
Nov 2016 to Sep 2020
M/s. DMF Engineering Consultant Dubai, UAE
Sr. Quantity Surveyor Contracts and Commercial Engineer
Jan 2016 to Nov 2016
M/s. Tyco Fire & Security LLC, UAE
Sr. Quantity Surveyor & Estimation Engineer
Sept 2013 to Dec 2015
M/s. Belhasa Projects LLC, UAE
Sr. Quantity Surveyor & Estimation Engineer
Jan 2011 to Aug 2013
M/s. Al Salmeen General Contracting, UAE
Quantity Surveyor
Aug 2006 to Sept 2007
M/s. Public Works Department High Ways Division Rawalakot. Pakistan
Sub Division Engineer
Jan 2004 to Jul 2006
M/s. Nael and Bin Harmal Hydro Export Establishment, United Arab Emirates Quantity Surveyor
Contact Details
Contact No: 009***********
Email: *************@*****.***
Qualifications
MSc. (Quantity Surveying), Birmingham City University UK, Continue...2019
B.Tech (Bachelor of Technology – Civil), University of Engineering & Technology, Lahore, Pakistan
Diploma in Civil Engineering, Punjab Board of Technical Education, Lahore, Pakistan
Diploma in Information Technology
Professional Affiliation
Approved from ADNOC for PMC ID No.6009489 Quantity Surveyor
Approved by DM: Water Supply &
Station Contracting Engineer, DM Ref.103582
Computer Knowledge
MS Office Application
MS Project
Auto Cad 2008
Country Experience
UAE
Pakistan
Nationality
Pakistan
Languages
English
Hindi