LORINE GAMBOA DOMINGUEZ

Position : Senior Planning Engineer/ Mechanical engineer.

E-mail : Error! Hyperlink reference not valid.,

adsd89@r.postjobfree.com

Contact No. : +971*********

Driving license:

a)Philippines

b)Saudi Arabia

c)UAE

d)Qatar

CAREER OBJECTIVE

Directly involved in Construction implementation, explore my engineering profession, my skills and experience as well as my computer literacy can be contribute and enhance.

To be able to execute the construction standard procedures, rules, function and set of

standard formulated by the company.

ACADEMIC AND PROFESSIONAL QUALIFICATION:

Bachelor of Science in Mechanical Engineer, College of San Agustine, Philippines – 1979

Bachelor of Science in Electrical Engineering, Cebu Institute of Technology, Philippines –1982

Certified Advance Primavera (P6) – Senior Planning / Scheduling

a. on computer application such as, Primavera (P3) Ver.

b.3.1, (P6) Ver. 6.7 and (P6) Ver. R8.1), Cost Control software (Candy)CCS – Ver. 2,

c.M.S Project, Ms Office & Auto Cad.

TRAINING AND SEMINARS:

Project Management Process (PMP – PMI) Training and Seminar – Chicago

Training Institute – Kharama, Dubai, UAE – Dated :30 September 2011 to October 28 2011

Advance Project Planning and Management ( Primavera ) P6 Version 6.7 & R8.1 – OFCEA – Al Futtain Training Center, Diera, Dubai, UAE – From Aug 2 2011 to September 3, 2011

Coating inspection process using Elcometer instrument, Air blast Saudi Arabia, Dammam, KSA-March 7, Year – 2003

Fiber Glass reinforced Thermosetting Risen (RTR) Pipe System, Pipe Handling & Assembly bond strand Ltd., Dammam, KSA, November 22, Year 2002.

ISO 9000 Awareness Seminar, by Saudi Projects Co. Abdullah Al-Shuwayer Co., Dammam, KSA, Nov. 21, Year – 1999 (QA Internal Auditor)

Planning and Management System, (Primavera Software & Microsoft Project Software), Abdullah Al-Shuwayer Co., Dammam, KSA, March 12, Year – 2000

Reverse Osmosis Desalination Operation Process, Mitsubishi Heavy Industries, Nagasaki, Japan, June 20, Year-1989.

Computer Aided Structural Analysis, West Technologies Institute, Phil., Oct. 15 Year 1982 Welding Inspection Process, CDCP Construction Corp., CDCP Copper Mine, Phil., March 2, Year 1981

CAREER SUMMARY:

Twenty Eight (28) years total work Professional experience and exposure from local and international construction industry; 2 years in Project Planning Consultant, 10 years in project construction planning/scheduling and quantity/cost control, 8 years in project construction quality control/ inspector, 4 years in project construction management and supervision and 2 years in operation in Reverse Osmosis Desalination Process.

Construction project involvements: Site Development, Road Works, Manholes/Conduit, Earth Fill Dam, Dyke, Spillway, Diversion Tunnel, Open Canal, Embankment, Soil Protection Project, Storm Drainage, Concrete/Steel Pipe/Sheet Pilling Works, Gas Pipeline, Offshore Pipelines, Sub-station, Concrete and Steel Buildings up to 10 storey, Chimney Structure (150m), Fence and Landscaping, Water and Sewage Treatment plant and Coal Fired Thermal Power Plant & Combine Cycle Power Plant Projects with Mechanical and Electrical Works, High Rise Building (3Tower- 40 Storey), Marine Works (Quay Wall, Revetment, Dredging), Piping Works (District Cooling System)

PROFESSIONAL EXPERIENCE:

July 2008 to Dec 30 2016: DAR AL HANDASAH (SHAIR & PARTNERS) – DUBAI, UAE

CONSULTING COMPANY

Position: SENIOR PLANNING ENGINEER

Project Attended:

Dubai Exhibition City at Dubai World Central – Dubai, UAE

Dubai World Trade Center New Exhibition Hall – Dubai, UAE

SP500 – Dubai International Airport, Phase III Expansion Project

Package (PK-30) – Dubai International Airport, Upgrading

Terminal One Station.

Doha,Qatar Festival City Mall

Responsibilities and Duties:

Responsible for reviewing Main Contractor construction programme prior to

submit to the client. see to it that the Contractor’s Programme shall be comply all of the Requirements as per Clause 14.1- of the Contract Document..

Responsible for reviewing Main Contractor construction

Responsible for the preparation of the Design/Tender programme.

Assist the Constructor’s for Empowering the project's staff with tools

and methods for project completion within the predefined timeframe,

as per the schedules.

Preparing periodic reports with respect to the department's activities

and achievements to be submitted to the Client.

Monitoring project's progress, preparing status reports, updating work

schedules and preparing ahead programs, as well as submitting regular reports including work progress and staff adherence to schedules.

Coordinating with the project staff to schedule work activities related

to the project and communicate schedules with concerned departments.

Developing Key Performance Indicators as required by clients and

finding ways to achieve them with high efficiency and effectiveness.

Responsible for the preparation of the on going Construction Detailed

from level 1 to level 4 which link to material procurement schedule, updating material submittals and material procurement status.

Check and review the sequence of the Site construction in order to avoid open-end-listing activities, so as to conform to the schedule milestone dates imposed in the contract.

2006 to 2008 EL-SEIF ENGINEERING & CONTRACTING CO. – DOHA, QATAR

Position: PLANNING MANAGER

Projects Attended:

NDIA – New Doha International Airport – Operation and Maintenance Facilities. Project Values = 411 Million Qatar Riyals

Diwan Al-Amiri Under ground Car Park & Relocation of Utility Building, Project Values = 225 Million Qatar Riyals

Duties and Responsibilities :

Responsible for evaluating tender documents, contracts and drawings, analyzing datas.

Responsible for preparation of the Base line Programme budgeting the time required to meet established deadlines and preparing detailed activities and submittals schedules against the stated timeframes.

Responsible for preparation of the Base line Programme budgeting the time required to meet established deadlines and preparing detailed activities and submittals schedules against the stated timeframes.

Providing detailed plans and schedules for the project's execution to the

project's staff including timeframes, resources, equipment’s and submittals, and answering all inquiries pertaining to prepared programs and plans.

Monitoring project's progress, preparing status reports, updating work

schedules and preparing ahead programs, as well as submitting regular

reports including work progress and staff adherence to schedules.

Coordinating with subcontractors to develop detailed schedules for their

work and following up on their activities, as well as developing recovery

plans.

Providing continuous on-site support to the project staff and clarifying

details pertaining to the work plan.

Ensuring a clear understanding of timeframes as per the contract and

resolving any related conflicts by preparing requests for information (RFIs).

Empowering the project's staff with tools and methods for project completion

within the predefined timeframe, as per the schedules.

Developing Key Performance Indicators as required by clients and finding

ways to achieve them with high efficiency and effectiveness.

Performing other duties related to the job as assigned by the Project

Manager.

Preparing periodic reports with respect to the department's activities and

Achievements to be submitted to the Project Manager.

Prepares Delay analysis programme for the projects in globally basis.

Responsible for managing subordinate QS’s in day today duties, such as

the re-measurements and agreeing the same with the Contractor, preparation of Interim Payment Certificates, Preparation of Employer’s

Cash flow requirements, Managing change formats (Variations), Cost

Reporting, Attend Value Engineering and Value Management Workshops

and Proactive in Commercial and Progress meetings representing the

Commercial Dept.

2000 to 2006 APTC CONTRACTING COMPANY LTD. – DAMMAM, KSA

Position: PROJECT MANAGER

Projects Attended:

Construction of Operation and Maintenance Building – Royal Commission, Jubail

Construction of Royal Commission’s Two Boys and One Girls Elementary School Buildings. Two Stories each

Construction of Saudi Aramco, Ras-Tanura Two Refinery Inspection Building and Maintenance Facilities.

Construction of New Operation and Maintenance Building and

Structural Erection – Shedgum Refinery expansion project,

Responsibilities and Duties:

Assist Engineering group for further review of the IFC drawing’s to be used

in construction.

Reviewed and approving Subcontractor Schedule of work that match the

baseline master schedule.

Always co-ordinate with the Procurement group and advise them the time of

the delivery of Materials, especially those included in long lead delivery

materials.

Assist the site planning engineers for revising the construction schedule of

the projects.

Finalizing Contractual Claims (Associated cost of awarded EOTs) an getting

approval of such additional costs from the Employer, a Contractual

requirement.

Managing measurement (qty take off), monthly evaluations, evaluation of

varied works by subordinate QS’s.

Tender Evaluation, recommendation and award of Packages. (The Contract

was sub-divided into many Packages).

Reviewing Contractual Aspects of EOT Claims (Analysis and Finalization of

EOT Claims by Separate Team).

Responsible for managing subordinate QS’s in day today duties, such as

the re-measurements and agreeing the same with the Contractor, preparation of Interim Payment Certificates, Preparation of Employer’s

Cash flow requirements, Managing change formats (Variations), Cost Reporting, Attend Value Engineering and Value Management Workshops and Proactive in Commercial and Progress meetings representing the Commercial Dept.

1999 to 2000 ABDULLAH AL-SHUWAYER CONTRACTING CO – DAMMAM, KSA

Position: SR. PLANNING ENGINEER

Projects Attended:

Construction of Road Widening and Civil Works – Yanbu Petromin Expansion project. Yanbu, KSA

Construction of Abqaiq Refinery Service Utility Building &

Upgrading of Fire Water Line – Saudi Aramco Abqaiq Refinery

Responsibilities and Duties:

Prepare construction schedule with link to the procurement schedule as per

approved contract milestone dates.

Prepare Resource estimate and distribute to the individual activities as per

budget quantities, prepare the budgeted cost distribution as per budgeted

quantity approved.

Coordinate the construction schedule with all Engineering disciplines and

with all key personnel involved in the construction. Develop weekly target

percentage schedule.

Prepare Progress monitoring Tracking sheet and Monitoring of actual

progress earned value.

Tracking down the activities that cause delay in the project and submitted to

the project manager for immediate resolution.

Prepare weekly progress report and two weeks look ahead schedules and

submitted to the Project Manager and Procurement Engineer. Prepare

Monthly Invoice based on the actual progress at site. Participate in the

weekly progress meeting. Prepare monthly forecast cash flow.

1998 to 1999 ARABIAN FAL CONTRACTING COMPANY – RASTANURA, KSA

Position: SENIOR PLANNING ENGINEER

Projects Attended:

Construction of New Four Stories Office Building, Al-Sayed Int’L. Cont., Ras-Tanura, KSA

Reconditioning of Gas Flow Pipelines in Ras-Tanura, Juaymah to Qatif GOSP Plant

Construction of New Operation and Maintenance Building Shedgum Refinery expansion project, Uthmaniyah, KSA

Responsibilities and Duties:

Prepare construction schedule with link to the procurement schedule as per approved contract milestone dates.

Prepare Resource estimate and distribute to the individual activities as per

budget quantities, prepare the budgeted cost distribution as per budgeted

quantity approved.

Coordinate the construction schedule with all Engineering disciplines and

with all key personnel in evolved in the construction.

Develop weekly target percentage schedule.

Prepare Progress monitoring tracking sheet and Monitoring of actual

progress earned value.

Tracking down the activities that cause delay in the project and submitted to

the project manager for immediate resolution.

Prepare weekly progress report and two weeks look ahead schedule and

submitted to the Project manager and Procurement Engineer.

Prepare Monthly Invoice based on the actual progress at site.

Participate in the weekly progress meeting. Prepare monthly forecast cash

flow.

1995 to 1998 - AL-ROBAYA CONTRACTING EST. – ABQAIQ, DAMMAM, KSA

Position: PLANNING ENGINEER

Projects Attended:

Construction of East/West Pump Station Admin Building and Facilities

Up-grading of Fire Water Line and Construction of Service Crew Facility Building – Rastanura, Saudi Aramco Refinery

Construction of Saudi Cement (Hofof) Operation and Maintenance Building, Hofof, KSA

Responsibilities and Duties:

Responsible for the preparation of preliminary construction schedule as per module and submit to the planning manager for technical review and approval.

Responsible for the review of sub-contractor’s construction schedule

proposal.

Responsible for the review of resource loading, cost loading, activity

sequence and avoid open-end listing of activities and the milestone

dates as per approved contract.

Coordinate the construction schedule with all engineering disciplines and with all key personnel involved in the construction.

Develop weekly target percentage schedule. Monitoring daily actual progress earned value.

Evaluate weekly work achievement against the weekly forecast schedule.

Prepare weekly, Bi-weekly and monthly forecast schedule against target schedule. Cost control and prepare monthly forecast cash flow.

Prepare weekly actual progress report and submit to the manager.

Prepare monthly invoice billing as per quantity installed at the construction site.

Tracking down the activities that cause delay in the construction.

Participate in the weekly progress meeting.

1993 to 1995 MITSUBISHI HEAVY INDUSTRIES LTD. – TAKASAGO, JAPAN

Position: MECHANICAL QA/QC INSPECTOR

Project Attended:

Construction of Jendar Combine Cycle Power Plant – Arab Republic of Syria

Responsibilities and Duties:

Prepare Test and Inspection Plan based to the quality inspection plan submitted to the consulting Engineers.

Perform Hold points, witness and surveillance inspections and test the activities under mechanical items at construction site, to ensure the compliance with the Project Specification and international standards.

Check material submittals conformity to approved standards and specifications.

Inspect materials and equipments as applicable to ensure the compliance with the Project Contract requirements and Specification, and for proper handling storage and protection at the construction lay down areas.

Review and evaluate Contractor’s and Sub-Contractor’s Quality document submittals.

Prepares necessary documentation (Request for inspection and attachments) and submitted to the Client Inspection team for review and witness the Specified items ready for inspection.

Witness on site materials installation test by the Sub-contractors that conform to the compliance of projects specification and standards.

Check review construction/ installation sketches and or shop drawings, ensure that they conform to project specification requirements.

Record legibly and accurately all controversial and non-complying construction practices, for materials and equipments and reported to the site supervisors or Field engineers the Detailed potential problems for their early resolution.

Prepares inspection test reports and initiate Non-conformance Reports (NCR) worksheet and equipment deficiency reports as needed.

Assist in performing Quality Audits to the Project completion.

Perform inspection for welding, Coating application, and Mechanical inspection required for Stationary and Rotating equipments installation.

Perform other miscellaneous duties as directed by the Inspection Supervisors or Field Engineers

1991 to 1993 M.S. AL-SUWAIDI CONTRACTING CO. – DAMMAM, KSA

Position: MECHANICAL FIELD ENGINEER

Project’s Attended:

Petro-Chemia – Expansion Plant – Jubail, KSA

IBNZHR – Petro Chamical Plant – Jubail, KSA

Love

Responsibilities and Duties:

Checking that the works performed by the construction group conform to the approved construction drawings, specifications and standards.

Prepare quantity take off and, estimate the manhours required.Per quantities.

Check that the material submittals conform to the approved standards and specifications.

Check that the materials conform to approve material submittals.

Implement and complete weekly inspection activities.

Prepares necessary documentation (Request for inspection attachments, etc.).

Check review construction/ installation sketches and or shop drawings.

Ensure conformity to the specified requirements.

Check and log request for design change initial and forward to site

superintendent.

Check and verify any revision to drawings that affect to field installation.

Prepare original documents (tests) to support the mechanical completion certificates (MCC).

1988 to 1991 MITSUBISHI HAEVY INDUSTRIES LTD – NAGASAKI, JAPAN

Position: OPERATION ENGINEER and MECHANICAL QA/QC INSPECTOR

Projects Attended:

Jeddah – Reverse Osmosis Desalination Plant

SWRO – Phase 1 to 4, SWCC Plant, Jeddah KSA.

Responsibilities and Duties:

Checking that the works performed by the construction group conform to the approved construction drawings, specifications and standards.

Check that the material submittals conform to approved standards and specifications.

Check that the materials conform to approved material submittals.

Implement and complete weekly inspection activities.

Prepare necessary documentation (Request for inspection attachments, etc.).

Ensure proper filing documents, check review construction/ installation sketches and or shop drawings, ensure that they conform to the specified requirements.

Check and log request for design change initial and forward to site superintendent.

Check and verify revision to drawings, check and mark-up as built drawings. Witness all test on soils and concrete.

1983 to 1988 - MOHAMMAD AL-MOJIL GROUP – DAMMAM, KSA

Position: FIELD ENGINEER (CIVIL/MECHANICAL)

Projects Attended:

Construction of Uthmaniyah Faras Power Plant – Year 1983 -85

Uthmaniyah,KSA

Construction of Rabigh – PETROLA-PTEROMIN Refinery Expansion, Rabigh, KSA

Construction of Gasland Power Plant, Juhaymah, KSA

Responsibilities and Duties:

Perform Hold points, witness and surveillance inspections and test the activities under mechanical items at construction site to ensure the compliance with the Project specification and international standards.

Check material submittals conformity to approved standards and specifications.

Inspect materials and equipments as applicable to ensure the compliance with the Project Contract requirements and Specification and for proper Handling storage and protection at the construction lay down Yard.

Review and evaluate Contractor’s and Sub-Contractor’s Quality document submittals.

Prepare necessary documentation (Request for inspection and attachments) and submitted to the Client Inspection team for review and witness the Specified items ready for inspection.

Witness on site materials installation test by the Sub-contractors that conform to the compliance of projects specification and standards.

Check review construction/installation sketches and or shop drawings, ensure that they conform to the specified requirements.

Record legibly and accurately all controversial and non-complying construction practices, for the materials and equipments and reported to the site supervisors or Field engineers the detailed potential problems for their early resolution.

Prepare inspection test reports and initiate Non-conformance Reports (NCR) worksheet and equipment deficiency reports as needed.

Assist in performing Quality Audits to the Project completion.

Perform inspection for welding, Coating application, and Mechanical inspection required for Piping, Stationary and Rotating equipments installation.

Perform other miscellaneous duties as directed by the Inspection Supervisors or Field Engineers

1979 to 1983 CDCP CONTRACTING CORPORATION – MANILA, PHILIPPINES

Position: FIELD ENGINEER

Projects Attended:

CDCP Mining Power Plant, Basay, Neg. Oreintal, Phil.

Construction of Geothermal Power Plant, Palinpinon, Phil.

Project 3. Construction of Isabel Leyte, Smelting Plant

Responsibilities and Duties:

Prepared shop Drawings for Structural and Piping Fabrication.

Assist field fabrication supervisor for fabrication

Assist erection supervisor during field erection.

Responsible for Inspection of Steel Structural Fabrication & Erection and Mechanical equipment Rotating & Stationary installation.

Prepare inspection Test Plan and Procedure for client Inspection Team approval.

Coordinate to the client inspector for any changes occurring in design and specification.

Conduct joined inspection together with the client for all hold points to be inspected.

Do the machinery, equipment and manpower allocation/schedule.

Assist in the preparation and submittals of materials specification for approval.

Check/review and comments on the shop drawings and erection procedures.

Responsible for the preparation of daily, weekly and monthly progress reports.

Conduct the weekly coordination progress meeting with the subcontractors and consultant.



Contact this candidate