ADAM “TOMMY” ELIZONDO, JR.
Longview, Tx. 75605
Cell: 361-***-****
**************@*****.***
Objective: Employment in a field that allows me to provide great work ethic as a conscientious employee moving forward safely while reaching new goals to comply with company demands
PROFESSIONAL EXPERIENCE
Primoris Services Corporation, Carlsbad, New Mexico
December 2019 to October 2020
Customer: XTO
Duties: Project management team. Assigned to capture all extras (adder sheet) in the field throughout the projects. Getting signed off and approved by the lead inspector on site.
HGA, Ruston, Louisiana
October 2018-August 2019
Customer: Reliance Gathering
Contractor: GTO, George West, Texas
Duties: Inspection of row clearing, stringing of pipe both poly and steel, mainline welding, coating crews, lower in and tie in crews, backfill and cleanup of rows. And final cleanup and restoration.
Epic Management, Houston, Texas
October 2017-October 2018
Customer: Halcon Resources
Contractor: Epic Energy Services
Duties: Inspection of field survey crews, inspection of clearing row’s, stringing of pipe both steel and poly pipe. Fire line inspection, and following crews, ditching, lower in, coating, tie in crews, backfill and finishing crews on high and low pressure lines for water, oil and gas. Also inspected on facility sites for hookups to live lines, dealing directly with the project management of the customer, Halcon resources.
HGA, Ruston, Louisiana
October 2016 - August 2017
Customer: En-Link Pipeline
Contractor: New Mexico Rentals/Crossfire
Duties: Inspection of ditching crew/lower in crew/backfill. Following landowner agreements for depths, Separation of new and existing limes and/utilities. Topsoiling of property. Excavation of existing hotlines. Coating and coating repairs. Tie ins and restoration of ROW.
QIS, Guymon, Oklahoma
September 2015 - April 2016
Customer: Williams/Transco
Contractor: Jendal Steel mill
Duties: Final inspection bench in steel mill and final inspection bench of coating mill.
Applied Consultants, Longview, Texas
August 2014 - July 2015
Customer: American Midstream
Contractor: Multiple contractors used in building gathering system
Duties: Senior chief over multiple jobs running simultaneously (up to 10 projects at running at times). Up to 34 inspectors in the field and yard at once. Duties were watching over all construction projects daily, directing placement of inspection daily and accordingly, taking all reports and compiling into master report. Conducted daily morning meetings at 6am with all inspectors and office employees.
Wood Group/Mustang Eng., Houston, Texas
March 2014 - May 2014
Customer: Dow Chemical
Contractor: Troy
Duties: Inspection of ditching crew/lower in crew/backfill. Following landowner agreements for depths, Separation of new and existing limes and/utilities. Topsoiling of property. Also hdd crews For several hdd and slick bore projects.
Wood Group/PAC Houston, Texas
Nov 2013 - Feb 2014
Customer: Murphy Oil
Contractor: Duphil and Coastal
Duties: Inspection duties varied from start of job to finish. Clearing of ROW, stringing of pipe,
Fire line, HDDs, hydro tests, ditching and lower in, tie in crews, coating crew, fab and bolt up/torque, painting, and
Clean up
Wood Group/Mustang Eng., Houston, Texas
March 2010 – August 2013
Customer: Chief Oil & Gas/PVR
Contractor: Numerous contractors building gathering system pipelines
Duties: Assistant Chief Inspector, Inspection of complete start to finish jobs.
Ranging from, 2” to 24” pipelines
Compressor installation in compressor stations
TGCS Energy Services, Houston, Texas
Feb 2009-May 2009
Customer: Enterprise Prod.
Contractor: Strike Const. and Wild Horse Const.
Duties: Inspection of process of running cleaner tools in variety sizes of pipeline. On lines up to 24”, the inspection of, and the tracking of the ILI tool runs, while completing all reports of time, pressure, product flow, and completion of the ILI runs including step by step photos. Also performed, inspection of pressure charts, weather chart, time charts for the hydro-tests ran on Enterprise lines, above ground and below.
Universal Ensco Inc. Houston, Texas
May 2008-October2008
Customer: Trans Canada
Contractor: Henkel & McCoy
Duties: Inspection of the prep and application of field girth weld coating using SPC 2888. Inspection of crew running holiday detector on both the girth welds coated in the field, and, the original FBE coating on the body of the pipe, while on skids, and before lower in of the pipe.
I also performed the inspection of tie-ins at road and water crossings. Inspection of the lower in crew, and the back-fill crew was also performed.
Mustang Eng., Houston, Texas
August 2006-May 2008
Customer: Enterprise Prod.
Contractor: Weatherford (cleaned line), Strike Const. (completed project)
Duties: Coating Ins./Utility Ins. new construction and rehab of pipeline (10” and 8”)
Inspection of all excavation,, and road drill sites, coating of girth welds and underground fabrication, also, the complete restoration done on the right of way.
Mustang Eng., Houston, Texas
March 2005
Customer: (location) Freeport LNG
Contractor: Zachary
Duties: Coating Inspector, all girth coating and coating of fabrication of 42” and 36” pipe
Quality Inspection Services, Inc., Goodwell, Oklahoma
August 2004
Customer: Unisource Energy Services
Contractor: Pacific Industrial Pipeline Co., Inc./Northern Pipeline
Duties: Inspection of joining polyethylene pipe and fittings by electro-fusion based upon gas company Standards and Procedures manual including: fusion times, measurements, pressure tests, and hot taps. Visual inspection of wells on low pressure steel gas lines, fittings, and transition pieces (steel to PE) installed for main and services. Inspection of installation of natural gas main and service lines including: clearance of existing structures, reviewing coordinates and footage according to as built presented by engineer, pressure tests, and hot taps. Also performed the inspected the abandonment and replacement of existing lines. Inspect contractor excavation and backfill including: trench depth, width, bedding and shading, and complete backfill for gas lines across private property, county roads, and highways.
Materials Consulting Services, Inc., Houston, Texas
May 2004
Customer: Williams Transco
Contractor: Acipco Steel, EB Foster Coating; Birmingham, Al.
Duties: (Steel) Final inspection of ERW pipe. I also performed the inspection of OD coating both FBE and ARO. Walkthroughs were done hourly throughout EB checking on line speed, blast profile, oven temps, coating temps, and total mils.
Materials Consulting Services, Inc., Houston, Texas
February 2004-May 2004
Customer: Williams Transco/Gulfstream Project
Contractor: Berg Steel, EB Coating; Panama City, Fl.
Duties: (Steel) Final bench inspection of 30" DSAW pipe .441wall. Dimensional and visual inspection was done along with walkthroughs throughout Berg Steel. Inspections of OD FBE coating, along with, inspection of stations during the coating process.
Quality Inspection Services, Inc., Goodwell, Oklahoma
August 2003-February 2004
Customer: Unisource Energy Services
Contractor: Pacific Industrial Pipeline Co., Inc./Northern Pipeline
Duties: Inspection of joining polyethylene pipe and fittings by electro-fusion based upon gas company Standards and Procedures manual including: fusion times, measurements, pressure tests, and hot taps. Visual inspection of wells on low pressure steel gas lines, fittings, and transition pieces (steel to PE) installed for main and services. Inspection of installation of natural gas main and service lines including: clearance of existing structures, reviewing coordinates and footage according to as built presented by engineer, pressure tests, and hot taps. Abandonment and replacement of existing lines. Inspect contractor excavation and backfill including: trench depth, width, bedding and shading, and complete backfill for gas lines across private property, county roads, and highways.
Quality Technical Consultants Inc., Harvey, Louisiana - 2003
Customer: Chevron, Total Fina Elf/Matterhorn Project
Contractor: Coflexip-Stenna Spoolbase, Theodore, Alabama
Duties: Inspected 8" and 10" FBE girthweld coating, thermal spray aluminum coating and repairing, thermal spray polyethylene coating and repairing, yard repairs of coating and spooling of 8" and 10" stalks.
Quality Inspection Services, Inc., Goodwell, Oklahoma - 2002
Customer: Williams Transco/Kern River Expansion
Contractor: Napa Pipe, Midwestern Coating; Napa, California
Duties: Final bench inspection on 30" and 36" DSAW pipe; Complete and thorough dimensional and visual inspections were performed on various wall sizes and steel grades; Walk-through checks were performed daily throughout the steel mill; Other inspections were performed on O.D. and I.D. FBE and ARO coatings and double end girth weld coating.
Quality Inspection Services, Inc. Goodwell, Oklahoma- 2002
Customer: Williams Transco/Kern River Expansion
Contractor: Stupp Steel Mill; Baton Rouge, Louisiana
Duties: Final bench inspection of 24" ERW pipe.
Quality Inspection Services, Inc. Goodwell, Oklahoma - 2002
Customer: Williams Transco/Kern River Expansion
Contractor: Bayou Coating; Baton Rouge, Louisiana
Duties: Inspection of O.D. FBE coating
Quality Inspection Services, Inc. Goodwell, Oklahoma - 2001
Customer: Williams Transco/Gulfstream Project
Contractor: Bredero Price Company; Ft. Meade, Florida
Duties: Final inspection of concrete weight coating
Quality Inspection Services, Inc. Goodwell, Oklahoma - 2001
Customer: Williams Transco/ Gulfstream Project
Contractor: Bredero Price Company; Mobile, Alabama
Duties: Final inspection of concrete weight coating- concrete thickness ranged from 2.75" up to 5"; Inspections on the installation of anodes and buckle arrestors on approximately 3500 pieces of 36" pipe; Inspection of gunnite repairs on concrete coating and two-part repairs on FBE prior to concrete coating; and witnessing and recording daily proctor tests on concrete cylinders.
CERTIFICATIONS AND EDUCATION
High School Diploma- Carthage, Texas
AOC's, General Pipeline/NCCER certs
O.Q. Certs: Controlling accidental release of natural gas, purging, control of static electricity, patrolling and system surveillance, valve maintenance, locating and marking facilities, joining steel pipe, joining plastic pipe, pressure testing, installing steel mains and services, installing plastic mains services, abandon and reinstate facilities, capping pipe lines, cathodic protection, installation of excess flow valves, inspection, corrosion control
REFERENCES
Hunter Phillips-903-***-****
Robert Riley- 337-***-****
Jim McCartney- 970-***-****
Mike Kitterlin- 318-***-****
Mike Culpepper- 318-***-****