Post Job Free
Sign in

Mechanical Engineer Design

Location:
Ploiesti, Prahova, Romania
Posted:
August 29, 2022

Contact this candidate

Resume:

CURRICULUM VITAE

CONSTANTIN GEORGESCU

**, ********* ******, ******** ***,

PLOIESTI, PRAHOVA COUNTY, ROMANIA

Actual phone (mobile): 004*-***-***-*** (ROMANIA)

E-mail: *******@*****.*** ; *****************@*****.***

PERSONAL INFORMATION

Date/Place of birth: 15.02.1959/ Targoviste, Dambovita, Romania

Civil Status: Married, one child

EDUCATION

M.Sc. Mechanical Engineer, Polytechnic University, Bucharest, ROMANIA

Machine Building Technology Faculty -1988

KEY COMPETENCIES

More than 30 years of experience in Piping Engineering and Project Management, in Upstream and Downstream Oil and Gas industries like refinery plants, petrochemical plants, oil and gas production industries, pump stations and fuel stations, according with European & American Standards and Codes (P.E.D., EN 13480, ASME, ANSI, API – Codes, ISO, BS, EN, DIN, Norsok – Standards, Snamprogetti design standards, KOC standards, Technip design standards, DEP -Shell Standards, OMV PETROM engineering standards, Piping Classes Specifications) etc., which of more than 10 years of site experience for Romanian refining installations execution. Good working knowledge of codes and standards relating to oil and gas industry.

Work experience includes also assignments in Qatar, France, Italy, Kuwait, India, UAE.

Good exposure to execution, erection and maintenance of cylindrical tanks, column, heat exchangers, separators, etc.

Strong technical and practical abilities as well as supervisory skills. Pro-active team player, easy to integrate in multi-cultural environments. Resilient personality, calm and flexible, able and confident to work with minimum supervision, on multiple tasks. Easy learner, good synthesis/reporting capacity, cost conscious and results orientated.

PROFESSIONAL SUMMARY

2020- 2021 ARCHIRODON Group NV Dubai, EAU –Lead Design Engineer-Piping

2017-20219 AECOM Romania- Lead Piping Engineer

2017 – 2017 PureWorld Engineering Ploiesti, Romania-Lead Piping Engineer

2014- 2016 AMEC Foster Wheeler Kuwait- Piping Design Engineer

2013– 2014 URS Engineers & Constructors Romania - Supervising Piping Engineer

2011– 2013 PureWorld Engineering Ploiesti, Romania – Piping Design Engineer

2010– 2011 URS Engineers & Constructors Romania - Supervising Piping Engineer

2007- 2010 Washington E&C Romania - Piping Design Engineer

2005-2007 Rompetrol Logistics S.A. Romania, Branch Truck Services Ploiesti- Chief Designing Department

2003 - 2005 Progaz Distribution S.A. Campina, Romania - Chief Designing and Technical Department

2002 - 2003 Petro-Construct S.A. Ploiesti, Romania - Site Manager

1996 - 2002 TMUCB S.A. Bucharest, Romania, Subsidiary Ploiesti – Chief Designing Department

1990 - 1996 TMUCB S.A. Bucharest, Romania, Subsidiary Ploiesti - Design Engineer

1985 - 1990 TMUCB S.A. Bucharest, Romania, Subsidiary Ploiesti - Mechanical Engineer

PROFESSIONAL QUALIFICATIONS / REGISTRATIONS

SOLIDWORKS 2017/2018 –Company in house and training, Waller Office, Texas, USA, 2018

CADWorx 3D Plant Design – Company in house and training, Ploiesti Office, 2013,2014,2015,2017

Project Controls “Progress and Performance Measurement” - Company in house and training, Ploiesti Office, 2011

"Quality Review of Design Errors and Their Prevention"- Company in house and training, Ploiesti Office, 2011

3D Pelican Forge Support Modeller for PDS – Company internal training, Ploiesti Office, 2008

Intergraph Equipment and Piping Design (PDS) – Company in house and training, Ploiesti Office, 2007MicroStation J – Company internal training, Bucharest Office, 2007

INSEMEX (Romanian National Institute for Mine Safety and Explosion Proof Protection) Certificate (Authorization for design and construction for equipment located in hazardous areas), 2006

Quality Assurance – Company internal training, Bucharest Office, 2000

EMPLOYMENT HISTORY

January 2020- December 2021 ARCHIRODON Group NV Dubai

Position: Lead Design Engineer -Client: ADNOC, UAE

BAB 485 MBD SUSTAINABLE FACILITIES PROJECT

Reviews and provides comments / approval on design deliverables / packages prepared by Engineering Subcontractor, in line with the scope of work requirements, Company’s specifications and international codes / standards.

Reviews Plot plan, Piping General Arrangement drawing, Isometrics, Tie-in Schedule, Material Take-off, Stress reports, Supports material requisition, Vendor Drawings, material selection, data sheets & specifications .

Ensures that all technical review comments are incorporated in the design deliverables / packages.

Reviews and endorses design change requests, concession request and waiver to project specifications, related to the discipline.

Provides technical / expert support for projects various activities, including bids evaluation, review of pre-qualification of Subcontractors / Contractors, Vendors or Suppliers, commissioning and handover of project facilities to end-users, etc.

Adheres to Company HSE policy, procedures, regulations and objectives as they relate to area of responsibility. Ensures that work undertaken is performed in a safe and environmentally sound manner.

Participates in various workshops and associated closeouts, e.g. Design Review, 3D Model Review, HSE Studies, Constructability Review, etc.

Participates in vendor drawing reviews and assists in resolving technical issues raised during FAT/SAT testing.

Ensures safe, economic and technically sound decisions related to area of responsibility.

Assists in resolving field engineering queries during construction phase.

Verifies of scope of work for any new modifications, new packages and review Contractor’s proposals.

Provides on-site engineering consultation, as applicable, during construction, pre-commissioning and commissioning stage; full involvement during performance test run for the plant.

Perform additional work activities as directed by line manager.

September 2017- December 2019 AECOM Romania-Bucharest

Position: Lead Piping Engineer

Assignment to J. W. Williams Inc. Office, Waller, Texas USA

November 2018-April 2019

Responsibilities:

3D modeling equipment (Exchangers, Separators, Scrubbers, Skids) using SOLIDWORKS 2017/2018.

Extraction of Equipment and Skid drawings, annotation and dimensioning, according with JWW's procedures and requirements.

Checking the drawings made by other design team members using the company's procedures and checklists.

PERMIAN PERIDOT CTB

Responsibilities:

Piping coordination and checking design, piping routing and supporting, GA’s using CAD Worx 2017, isometrics extraction, checking and issuing.

COP-ZIA HILLS

Responsibilities:

Piping coordination and checking design, piping routing and supporting, GA’s using CADWorx 2016, isometrics extraction, checking and issuing.

COP-SENM

Responsibilities:

Checking design, piping routing and supporting, GA’s using CADWORX 2016, isometrics extraction, checking and issuing.

OXI-Corral Fly and Draw Project

Responsibilities:

Reviews Plot plan, Piping General Arrangement drawings, Isometrics, Tie-in Schedule, Material Take-off, Stress reports, Supports material requisition, Vendor Drawings, material selection, data sheets & specifications

Ensures that all technical review comments are incorporated in the design deliverables / packages.

Reviews and endorses design change requests, concession request and waiver to project specifications, related to the discipline.

January 2017-July 2017 Pure World Engineering Ploiesti, Romania

Position: Lead Piping Engineer

Define line pipe specification;

Elaborate piping material component specifications;

Control of piping engineering document subcontracted;

Develop key plans, plot plans and layout studies

Checking and issuing isometrics (maintain Line List, ISO's tracking reports,

maintain a master ISO's issue book);

Prepares technical and contractual correspondence in the form of formal letters and transmittals for review and approval by the Lead Engineer;

Elaborate insulation, painting and protection specifications;

Define plant fireproofing specification;

P&ID's mechanical implementation / assist process engineer for flow sheets revision;

Scheduling and co-ordination between disciplines for interference checking;

Assists in developing documentation to fulfil discipline project requirements

May 2014- December 2016 AMEC FOSTER WHEELER Kuwait

Position: Piping Design Engineer CLIENT: KOC, Kuwait

North Kuwait Projects for GC 29, GC 30, GC 31 and Manifold Group Trunk line for GCs.

Perform Project Management Consultancy (PMC) services in the role of Piping Engineer for oil & gas and petrochemical projects. The responsibilities include the review of Engineering Contractor’s design work / deliverables and provide necessary comments / approval, while fully meeting COMPANY’s requirements by assuring quality deliverables in a timely manner.

Monitors and manages the works carried out by Engineering Contractor during FEED and Detailed Engineering phases, which includes review of deliverables, attending meetings, monitoring resource levels, compliance to codes and standards and Company specifications.

Reviews and provides comments / approval on design deliverables / packages prepared by Contractor, in line with the scope of work requirements, Company’s specifications and international codes / standards.

Reviews Plot plan, Piping General Arrangement drawing, Isometrics, Tie-in Schedule, Material Take-off, Stress reports, Supports material requisition, Vendor Drawings, material selection, data sheets & specifications

Ensures that all technical review comments are incorporated in the design deliverables / packages.

Reviews and endorses design change requests, concession request and waiver to project specifications, related to the discipline.

Provides inputs to line manager on change orders and ensure safe, economical and technically sound decisions.

Provides technical / expert support for projects various activities, including bids evaluation, review of pre-qualification of Subcontractors / Contractors, Vendors or Suppliers, commissioning and handover of project facilities to end-users, etc.

Provides feedback to COMPANY on selection and shortlisting of new / replacement Contractor’s engineering staff.

Coordinates, supervises and evaluates technical studies and special investigations carried out by third party, including Survey and Reports, Skids, OEM documents, condition assessment, fit for purpose Pipe routing Studies, calculations, vibration issues, establishing adequacy, facilities/systems upgrading, replacement requirements etc.

Identifies areas of improvement for the design contractor and articulate an action plan with the involvement of both the project engineer and the design contractor representative.

Provides technical advice and support to the operation group, in order to ensure that the plants integrity and long term availability are maintained, areas of concern are identified by the appropriate party and optimum / cost effective solutions are adopted.

Follows up with Contractor’s planning and progress on daily basis.

Provides technical support to resolve pending / outstanding issues.

Coordinates with the Core Team, Company, Contractor and other disciplines, as required.

Adheres to Company HSE policy, procedures, regulations and objectives as they relate to area of responsibility. Ensures that work undertaken is performed in a safe and environmentally sound manner.

Participates in various workshops and associated closeouts, e.g. Design Review, 3D Model Review, HSE Studies, Constructability Review, etc.

Participates in vendor drawing reviews and assists in resolving technical issues raised during FAT/SAT testing.

Ensures safe, economic and technically sound decisions related to area of responsibility.

Assists in resolving field engineering queries during construction phase.

Verifies of scope of work for any new modifications, new packages and review Contractor’s proposals.

Provides on-site engineering consultation, as applicable, during construction, pre-commissioning and commissioning stage; full involvement during performance test run for the plant.

Reports on Engineering Contractor’s work to line manager.

Perform additional work activities as directed by line manager.

Aug. 2013 – April 2014 URS Engineers & Constructors Bucharest, Romania

Position: Supervising Design Engineer

CLIENT: Denver Office of URS, US

Project: Dawson Spectra Gas Plant

checking activities: GA’s, Plot Plans, Isometrics;

interference checking with existing piping, structural, electrical, using Smart Plant Review;

equipment, piping and structure design modelling in 3D-PDS, according to P&ID’s and Project Specifications;

Feb. 2013 – Jul.2013 Pure World Engineering Ploiesti, Romania

Position: Piping Design Engineer

Project: Mobile Skid Mounted Gas Turbine Power Generation Unit– South Oil Company of IRAQ

piping studies, piping layouts, piping GA’s using AutoCAD;

piping typical assemblies, using AutoCAD

standard pipe support collection

bill of materials, data sheets, piping specifications;

Aug. 2012- Jan.2013 Pure World Engineering Ploiesti, Romania

Position: Piping Design Engineer

Project: FEED Closed Drain System at BCDS – Abu Dhabi Company for Onshore oil Operations (ADCO)

piping studies, piping layouts, piping GA’ s for construction and demolition lines, using AutoCAD;

bill of materials for all new drain lines;

Nov. 2011- Jul. 2012 Pure World Engineering Ploiesti, Romania working for ENERECO S.p.A. Engineering &Consulting, Fano, Italy

Position: Piping Design Engineer

Project: Onshore Burun Field Oil Development - Phase 2

(FEED) - Western Turkmenistan

study of existing documentation regarding the project;

make new plot plans using AutoCAD 2D for 8 new field station;

make new drawing for production manifold, gas lift manifold and water injection manifold according to P&ID’ s;

make new drawing for field trunk lines according to P&ID’s;

modification, updating and completing these drawings with new information about equipment, manifolds, client requirement;

piping studies and layouts for fields trunk lines (production, gas lift and water injection, new field stations and separation and pumping plant ( SPP);

design and detailed drawings for launching and receiving pig stations;

equipment, piping and structure design modelling in 3D-PDS, according to P&ID’s and plot plans;

Aug. 2011 – Nov.2011 PureWorld Engineering Ploiesti, Romania

Position: Senior Piping Design Engineer

Project: Revamp N-Hexan Unit- VEGA Refinery

preparing the programs of examination, tests and investigations to assess the technical state for piping, according with roumanian codes;

piping studies;

Mar. 2011- Jul. 2011 Petroconsult S.R.L. Ploiesti, Romania working for ECI Inginérie, Rouen, France

Position: Piping Design Engineer

Project: Centrale de Komsilga Sonabel Burkina Faso

MicroStation 3D equipment, structural and piping modelling in accordance with P&ID’s;

piping studies and layout for water cooling, fuel, lube-oil, utilities;

interference checking with existing piping, structural;

drawings extraction, isometrics issuing;

Jun. 2010- Mar. 2011 URS Engineers & Constructors Bucharest, Romania

Position: Supervising Design Engineer

CLIENT: Tennessee Valley Authority, Brownsville, Tennessee, US (Lead Office WGI Princeton)

Project: John Sevier Combined Cycle Project

PDS piping modelling in accordance with P&ID’s, for Gas Turbine & HRSG Area;

interference checking with existing piping, structural, electrical, using Smart Plant Review;

3D Pelican Forge support design and modelling;

Sep.2007- Jun.2010 Washington E&C Bucharest, Romania

Position: Piping Design Engineer IV

CLIENT: Qatar Gas

Project: Common Sulfur

piping study lay-out Conveyor 41 Area- Fire Water System;

piping Design Modeling using 3D-PDS;

extraction of isometrics from PDS, ISO’s checking, Isometrics issuing ;

checking piping routing and supporting using Smart Plant Review;

Sept.2008- Oct.2009 Assignment to Ras Laffan-Qatar

Responsibilities:

Performing walk down in site, checking and marking P&ID ; 2D AutoCAD detailed piping drawings, details and piping supports design; Field survey and updating drawings with survey output; Basic and detailed engineering (P&ID’s, equipment and piping arrangement, isometrics, bill of materials, pipe supports, 3D modelling); Coordination between design and construction; Performing detail design and construction; Inter-disciplines coordination for Mechanical, Civil, Structural, Instrumentation and Piping Department; Implementation in 3D Model of engineering design solutions; Updating and Red line P&ID’s; Rework Steam and Condensate System; Updating Plot Plan Drawings, As-Built Isometric and Plot Plan Drawings. Finding proper solutions to solve holds and clashes in accordance with Client procedures; Preparing Walk-Down Packages.

Project: Constellation Power Source Generation

P&ID Drawing using Micro Station 2D, in accordance with

mark-up;

Project: AREVA, Imouraren Uranium Project- NIGER

taking active part in feasibility studies – Material Take- Off;

Feb.2005 - Sep.2007 ROMPETROL LOGISTICS S.A. Romania –Branch Truck Services Ploiesti, Romania

Position: Chief Designing Department

Authority Engineer for projects conformity authorization - authorized by “The National Authority for Control and Approval of Pressure Vessels and Hoisting Equipment” – ISCIR – Romania for designing, checking and conformity assessment and authorization of GPL installation according to ISCIR PT C8-2003.

supervising of this department‘s activity;

designs, elaboration and execution of GPL installations for constructions (unfamiliar buildings and so on) and fuel stations;

almost any detail work for the up-named types of installations;

supervising for execution and mounting details;

responsible for the final function tests and checking for elaborated designs;

supervising offers and estimation;

Sep.2003- Febr.2005 PROGAZ DISTRIBUTION S.A. Campina, Romania

Position: Chief Designing and Technical Department

Authorized GR. I D by ANRGN, Romanian National Authority for natural

gas distribution.

supervising of this department‘s activity;

designs, elaboration and execution of natural gas installations for constructions (unfamiliar buildings and so on);

almost any detail work for the up-named types of installations;

supervising for execution and mounting details;

responsible for the final function tests and checking for elaborated designs;

supervising offers and estimation;

Aug. 2002- Sep.2003 PETRO-CONSTRUCT S.A. Ploiesti, Romania

Position: Site Manager

CLIENT: S.N.P. Petrom S.A. – Branch Ploiesti,

Project: Setting-up distribution of natural gas in Mizil-Prahova

coordinates project requirements with Operations/Disciplines to assure adequate staffing consistent with the scope, schedule and budget of the project;

organizes manpower for the project; coordinates overall operations;

directs and delegates to the project team;

anticipates, recognizes and identifies key issues surrounding problems and establishes objectives and priorities in solving them;

determines solutions to problems and directs their implementation and maintains quality assurance in compliance with company philosophy and requirement;

co-ordinate technical and administrative activities for a site;

field and shop support;

Jul.1996 - Jul.2002 TMUCB S.A. Bucharest- Subsidiary Ploiesti, Romania

Position: Chief Designing Department

Specific project of petrochemicals field (tanks, columns, heat exchangers, piping, metallic structure) for various refineries in Romania: Petrotel-Lukoil Refinery, Vega Refinery, Astra Refinery, Brazi Refinery, etc.

supervising of this department‘s activity.;

coordinates engineering interface activities with other disciplines and departments;

institute Design Review teams as required to assure quality of engineering conformance with project definition and to comply with regulatory requirements;

complete design activity including: calculation sheets, technical specifications for materials, parts list; assembly drawings, subassembly drawings, detailed execution drawings;

performing “As Built” documentation;

Jan.1990 - Jul.1996 TMUCB S.A. Bucharest- Subsidiary Ploiesti, Romania

Position: Design Engineer

Specific project of petrochemicals field (tanks, columns, heat exchangers, piping, metallic structure) for various refineries in Romania: Petrotel-Lukoil Refinery, Vega Refinery, Astra Refinery, Brazi Refinery, etc.

complete design activity including: calculation sheets; technical specifications for materials; parts list; assembly drawings; subassembly drawings; detailed execution drawings; “As Built” documentation; Equipment specification, equipment erection, piping studies, pipe routing, piping GA’s, issued isometrics, supports, material take-off.

Sep.1985- Jan.1990 TMUCB S.A. Bucharest- Subsidiary Ploiesti, Romania

Position: Mechanical Engineer

problems solving related to the Mechanical - Energetic Department.

LANGUAGE ABILITIES

English (good)

French (medium)

Italian (basic)

Russian (notions)

MISCELLANEOUS

Highly motivated and driven by certain basic principles and strongly believe in fundamental values & self-respect;

Achievement oriented with excellent people management/interpersonal skills;

Very good collaboration with my working fellows, with my superiors, with clients and vendors;

Ability to adjust easily to change, team motivation and meet strict deadlines;

Software: SOLIDWORX 2017/2018, MS Office (Word, Excel, PowerPoint, Access & Project), AutoCAD 2006, AutoCAD 2010 2D/3D, MicroStation J, MicroStation V8i, PDS, Pelican Forge, Smart Plant Review, Naviswork

TIME OF AVAILABILITY

Maximum 30 days after the Contract signature.

REFERENCE AVAILABLE UPON REQUEST



Contact this candidate