Dallas J. Kendall / Cell: 803-***-**** /Email: adsbyj@r.postjobfree.com / Aiken, SC

OBJECTIVE:

Obtain contract or permanent employment (100% remote to 100% travel, open to relocation) in the field of Automated Monitoring and Control Systems.

INDUSRTY EXPERIENCE:

Approx. 50% in Municipal Water/Waste Water Treatment (i.e. I&C system: Design, Panel Building, Troubleshooting, PLC/HMI Programming…).

EDUCATION:

Bachelor’s degree in Electrical Engineering Technology from Southern Polytechnic State University

Associate degree in Optical Engineering Technology from Monroe Community College

PLC/HMI HARDWARE and SOFTWARE EXPERIENCE:

GE, AB, Square-D/Intellution, Cimplicity

DRAFTING EXPERIENCE:

AutoCad, MicroStation

OTHER SOFTWARE EXPERIENCE:

WORD, EXCEL, ADOBE ACROBAT

TEST EQUIPMENT EXPERIENCE:

HART 744 and 475 Calibrator/Communicator, TRANSMATION Calibrator, Digital Multi-Meter

STANDARDS, CODES and REGULATORY EXPERIENCE:

ANSI/ISA, IEEE, NFPA, NEC, UL, ASME, OSHA, NRC

EMPLOYMENT HISTORY:

1) Technical Diagnostic Services (Location: FT. Worth, TX/Phone: 817-***-****)

This was a subcontract assignment were I worked as an electrical technician from 5.16.17 to 5.27.17. I upgraded 100KW and 400KW resistive load banks, installing new I/O boards, new control switches, indicating lights and associated internal wiring.

2) Technical Diagnostic Services (Location: FT. Worth, TX/Phone: 817-***-****)

This was a subcontract assignment were I worked as a PLC support engineer/technician from 10.13 to 12.13. I conducted Loop Checks during the dry commissioning phase of the Keystone XL Pipeline project. I verified that field instruments, devices and components were correctly installed and calibrated. That their signals were getting back to the correct locations on the computer workstation screens. I assisted in the troubleshooting of hardware and software, modified panel wiring, calibrated field instruments, installed components and device and, red lined drawings for revision.

3) Global Energy Services, LLC (Location: Aiken, SC/Phone: 803-***-****)

This was a subcontract assignment were I worked as a Start-Up Lead I&C Engineer from 4.11 to 12.11. I supported multiple on-site engineering teams in their efforts to verify and validate that a newly constructed nuclear material waste processing facility (The IWTU) was functionally safe and ready for operation. That The IWTU had been designed and constructed per the approved drawings and specifications and, was in compliance with all required NRC and other regulatory standards and codes. I did this by following ITAAC (Inspections, Tests, Analysis, and Acceptance Criteria) procedures. This required my participation in the physical inspection of the entirety of The IWTU facility, including all involved drawings and documents and, gathering and documenting “Objective Evidence” which proved or disproved that the “Acceptance Criteria” had been satisfied. In addition, I red lined drawings, corrected DCS loop logic and, participated in daily group meetings.

4) Global Energy Services, LLC (Location: Aiken, SC/Phone: 803-***-****)

This was a subcontract assignment from 1.11 to 3.11 were I worked as an I&C Engineer as part of a Start-Up Transition Team (Contractor Operational Readiness Review/CORR). I was responsible for assessing the degree to which the processing plant was ready to begin normal operations. I analyzed the degree of operational readiness of two nuclear material processing plants (DUF6) which included the evaluation of written specifications, system design drawings, plant monitoring and control hardware and software and, plant personnel.

5) National Engineering Services Corp. (Location: Portsmouth, NH/Phone: 603-***-****)

This was a subcontract assignment were I worked as an I&C Engineer from 10.07 to 7.08. I worked on multiple nuclear material processing projects within the Savannah River Site (SRS). I created and modified P&ID‘s, interconnect and loop drawings, equipment layout drawings, electrical schematics and, specified I&C system hardware.

6) Southeast Automation (Location: NA/Phone: 803-***-****)

I was the owner of this company from 6.97 to 10.07. I concentrated mainly on Municipal Water/Waste Water Treatment projects. I did everything from sales to panel design and building to PLC and HMI programming to system troubleshooting. I designed I&C systems in AUTOCAD (i.e. panel layout and wiring, interconnect and loop drawings, single line diagrams...). I also installed and calibrated field equipment, managed and supervised subcontractors, provided system commissioning and start-up assistance and, personnel training. Secondary to my main business I sold and installed residential, commercial and industrial camera surveillance and card access control systems.

7) Production Systems, Inc. (Location: Marietta, GA/Phone: 770-***-****)

This was a subcontract job from 11.96 to 6.97 where I was a Controls Engineer on Material Conveying System projects. I designed I&C systems in AUTOCAD (i.e. panel layout and wiring, interconnect and loop drawings, single line diagrams...). I programmed the PLC software. I also supervised and assisted in system commissioning and, start-up.

8) Control Instruments, Inc. (Location: Smyrna, GA/Phone: 404-***-****)

This was a permanent position from 1.94 to 11.96 where I was a Project Controls Engineer on Municipal Water/Waste Water Treatment projects. I managed projects from initial design to completion including the supervision of electrical subcontractors and field technicians. I supervised and assisted in system installation, commissioning, start-up and, personnel training. I designed I&C systems in AUTOCAD (i.e. panel layout and wiring, interconnect and loop drawings, single line diagrams...). I selected the I&C system hardware and software and, assembled submittal and O&M manuals. I also programmed PLC and HMI software.

9) The Turbitrol Company (Location: Atlanta, GA/Phone: 770-***-****)

This was a permanent position from 1.92 to 12.93 where I was an Electrical Designer on Municipal

Water/Waste Water Treatment projects. I assisted senior engineers with the design of I&C systems, assembly of submittals and O&M manuals and, supported field personnel with hardware and software troubleshooting issues.

10) Emprise Corporation (Location: Marietta, GA/Phone: 770-***-****)

This was a permanent position from 8.89 to 6.91 where I was a Junior Electrical Engineer on Municipal Gas SCADA systems projects mainly throughout the Southeastern US. As a Junior Electrical Engineer I performed sales calls, installed and calibrated field equipment, created AUTOCAD drawings, assisted in the building of control panels, hardware and software troubleshooting, system commissioning and start-up, system designs and PLC programming.

PROJECT EXPERIENCE:

1) Southeast Automation (Location: NA/Phone: 803-***-****)

I provided I&C engineering services for Georgia’s Cobb County Water Authority including system troubleshooting, equipment installation and calibration and, PLC and HMI software upgrades.

2) Southeast Automation (Location: NA/Phone: 803-***-****)

I designed, built and programmed the I&C portion of a septage receiving station for The Augusta Waste Water Treatment Plant. Included where three card readers, one control panel and, one computer workstation with HMI graphics software. The workstation provided a real-time graphical representation of the system, functioned as a means to help monitor and control the system and, for provided logging and billing services. The system was designed with one card reader at the front gate to admit plant employees, one card reader at the side gate to admit non-employees and one card reader at the septage receiving station. Once the card swiped at the septage receiving station was verified as being one of the companies on file access would be granted to operate the control panel. Push buttons and pilot lights on the panel provided a means of visual confirmation and control. The system logged the number of gallons dumped along with any ph alarms and also, calculated amounts due per total gallons dumped per month. The system used a GE Versamax Micro PLC, GE Cimplicity Machine Edition View HMI software and, Excel with XLreporter for the logging and billing.

3) Production Systems, Inc. (Location: Marietta, GA/Phone: 770-***-****)

I design and programming 13 control panels to monitor and control spiral up/down conveyor lines and a three to one merge line on a battery packaging plant. I supervised the electrical contractors in the installation of the system and, participated in the on-site start-up of the system. The system used GE 90-30 PLC’s, Allen Bradley variable speed drives and Banner photo eye’s.

4) Control Instruments, Inc. (Location: Smyrna, GA/Phone: 404-***-****)

I designed 9 control panels, programmed the HMI software and PLC's, terminated fiber optic cable between 4 computer workstations and 9 PLC’s and, provided system start-up assistance and personnel training. The system was designed to monitor and control plant back-up power, the influent, the effluent, the RAS, the WAS and the oxygenation train stations. The system monitored the backup power generators for on/off status and fuel tank levels. The influent and effluent station wet well levels were monitored. Pumps were controlled in a lead/lag order with the number of pumps ON and their speeds varied to maintain the specified safe wet well levels. The RAS and WAS pumps were turned ON/OFF in a lead/lag order with the number of pumps ON and their speeds varied to maintain a specified flow rate. The oxygenation train stations were monitored for mixer motor ON/OFF and oxygen level status. The HMI software was Intellution and the PLC's where Square-D model 400's.



Contact this candidate