Mohammad Ramzan Ansari
Mobile No.: +919*********
E-mail: **************@*****.*** / Skype Id: Mumtaz.ansari7861
Piping Supervisor (16 Years Exp.)
Career Summary:
** ***** ** **** ***, PMC & PMT roles in Oil & Gas, Refinery, Petrochemical, LNG Plants and Gas Booster Station. Fabrication, Erection, Hydro Test, Support Installation, Pneumatic Test Punch A, B and C Pre-commissioning. UG / AG and low and High-Pressure Pipes. I have experience in 1/2" to 60" Pipe and also the pipelines work in size from 8”, 16”, 24”, 36”, 42", 48” and 60” approximately 380 KM Long. Familiar with various international codes and standard for example ANSI, ASME, API and piping codes B31.1, B31.3, B31.4; B31.8 etc. Providing the strong ability to lead at strategic level in both client & contracting organizations.
Core Competencies
Project Conception & Initiation Project Definition & Planning
Project Launch or Execution Project Performance & Control
Contract Negotiations Contractor/Vendor Relations
Time Management Subcontractor/Crew Supervision
Educational & Technical Qualification
1999 to 2002 - Diploma in Mechanical Engineering from Al-Kabir Polytechnic Collage, Ranchi University - India 1998 – Intermeddled Examination from Bihar college Examination Board, Patna - India
Accomplishments:
Prepares and implements the work execution plan and budget as relevant to the construction activities together with Project Manager Onshore, Engineer and Project Control Engineer. Manages and coordinates construction activities.
Studying contract documentation and Scope of Work my second preference will be to flow client Safety & Quality procedure and to convince my senior staff to do the same. Co-ordination of the construction site including construction related schedule, budget, quality & safety.
Cost Estimation and Budget Management:
To prepare, obtain approval and manage project budgets.
To provide feedback for cost realization of the projects.
Pre-Commissioning and Commissioning:
Pre-commissioning & commissioning activities those include activities like hydro testing, pneumatic testing, water flushing, blowing (air, steam) and chemical cleaning. Making isolation as per process requirement by providing spades, oil flushing etc.
Leadership:
Delivers results through personal contribution and team, and uses personal power to motivate, guide and influence self and others. Demonstrates willingness and ability to focus on the delivery of results and respond according to needs.
Employment History / Work Experience
Worked as a Piping Foreman with CLIENT: HARDILIA PETROCHEMICA L & OIL REFINERY IN INDIIA, Project: Piping Construction Project from 05th February 2002 to 24th December 2004
Responsibility
Maintained a safe work environment by following all HSE standards at all times.
Follows all safety rules and guidelines established by the offshore, onshore and actively participates in safety meetings, safety programs.
Planning & Execution of Heat Exchangers, Vessel, Column (Tower), Valves, Boiler, Boiler Heater, All Stationary Equipment’s root in maintenance of all kinds of re-Boiler, Boiler, Heater, Cooler, Reciprocating compressor and Centrifugal pumps.
Visual Inspection for Mechanical Equipment Based on Packing List with client’s and related Trades.
Prepare for all Mechanical Documentation control activities and testing.
To conduct visual inspection installation equipment, alignment, Flatness check and mechanical completion prior to commissioning.
Repairing and overhauling of Pressure vessels and column. Steaming out, open manholes, confined space entry, inspection with inspection team, internal cleaning. Tray removal, repairing and replacing, demister pad removal, repairing and replacing, bubble cap and valves replacing, welding joint buffing for welding crack inspection, plate thickness inspection, replace damaged piping, if critical working with SCABA and final box up.
Review work performance of completed work assignment.
To verify the conformity if there is a comment from class or client’s.
Ensure punch list is prepared during inspection and coordinating with relevant department for closing.
Worked as a Piping Supervisor with CLIENT: AL-GHANIM INTERNATIONAL KUWAIT, Project: LFHO EF/1852 from 12 June 2013 to 20 December 2016
Responsibility
Maintained a safe work environment by following all HSE standards at all times.
Follows all safety rules and guidelines established by the offshore, onshore and actively participates in safety meetings, safety programs.
Planning & Execution of Heat Exchangers, Vessel, Column (Tower), Valves, Boiler, Boiler Heater, All Stationary Equipment’s root in maintenance of all kinds of re-Boiler, Boiler, Heater, Cooler, Reciprocating compressor and Centrifugal pumps.
Visual Inspection for Mechanical Equipment Based on Packing List with client’s and related Trades.
Prepare for all Mechanical Documentation control activities and testing.
To conduct visual inspection installation equipment, alignment, Flatness check and mechanical completion prior to commissioning.
Repairing and overhauling of Pressure vessels and column. Steaming out, open manholes, confined space entry, inspection with inspection team, internal cleaning. Tray removal, repairing and replacing, demister pad removal, repairing and replacing, bubble cap and valves replacing, welding joint buffing for welding crack inspection, plate thickness inspection, replace damaged piping, if critical working with SCABA and final box up.
Review work performance of completed work assignment.
To verify the conformity if there is a comment from class or client’s.
Ensure punch list is prepared during inspection and coordinating with relevant department for closing.
Worked as a Piping Foreman with CLIENT: EASKAY ENGINEERING .CO JAMSHEDPUR Project: Construction Project from 01th January 2004 to 22nd November 2005
Responsibility
Maintained a safe work environment by following all HSE standards at all times.
Follows all safety rules and guidelines established by the offshore, onshore and actively participates in safety meetings, safety programs.
Planning & Execution of Heat Exchangers, Vessel, Column (Tower), Valves, Boiler, Boiler Heater, All Stationary Equipment’s root in maintenance of all kinds of re-Boiler, Boiler, Heater, Cooler, Reciprocating compressor and Centrifugal pumps.
Visual Inspection for Mechanical Equipment Based on Packing List with client’s and related Trades.
Prepare for all Mechanical Documentation control activities and testing.
To conduct visual inspection installation equipment, alignment, Flatness check and mechanical completion prior to commissioning.
Repairing and overhauling of Pressure vessels and column. Steaming out, open manholes, confined space entry, inspection with inspection team, internal cleaning. Tray removal, repairing and replacing, demister pad removal, repairing and replacing, bubble cap and valves replacing, welding joint buffing for welding crack inspection, plate thickness inspection, replace damaged piping, if critical working with SCABA and final box up.
Review work performance of completed work assignment.
To verify the conformity if there is a comment from class or client’s.
Ensure punch list is prepared during inspection and coordinating with relevant department for closing.
Worked as a Piping Supervisor with CLIENT:BADER AL MULLA & BROTERS COMPANY W.L.L KUWAIT, Project:
Al-Jaber Hospital, Kuwait from 12th January 2017 to 30th October 2019
Responsibility
Maintained a safe work environment by following all HSE standards at all times.
Follows all safety rules and guidelines established by the offshore, onshore and actively participates in safety meetings, safety programs.
Planning & Execution of Heat Exchangers, Vessel, Column (Tower), Valves, Boiler, Boiler Heater, All Stationary Equipment’s root in maintenance of all kinds of re-Boiler, Boiler, Heater, Cooler, Reciprocating compressor and Centrifugal pumps.
Visual Inspection for Mechanical Equipment Based on Packing List with client’s and related Trades.
Prepare for all Mechanical Documentation control activities and testing.
To conduct visual inspection installation equipment, alignment, Flatness check and mechanical completion prior to commissioning.
Repairing and overhauling of Pressure vessels and column. Steaming out, open manholes, confined space entry, inspection with inspection team, internal cleaning. Tray removal, repairing and replacing, demister pad removal, repairing and replacing, bubble cap and valves replacing, welding joint buffing for welding crack inspection, plate thickness inspection, replace damaged piping, if critical working with SCABA and final box up.
Review work performance of completed work assignment.
To verify the conformity if there is a comment from class or client’s.
Ensure punch list is prepared during inspection and coordinating with relevant department for closing
Worked as a Piping Supervisor with CLIENT: LARSEN & TOUBRO LIMITED - Project: ECC Construction from 08th January 2013 to 15th April 2013 in India
Responsibility
Prepare and review all the isometric drawing need to fabricate.
Monitor the material required for fabrication.
Supervise the man power, check pools, layout & measurement, heat number of pipe & Fittings in accordance to drawing.
Conduct inspection and validity of welder’s certificates.
Review the isometric drawings and general arrangement of P&ID according to the scope of Project.
Monitor the production in fabrication and erection area.
Coordination with and attending regular meeting with client and subcontractor.
Review and approval of shop drawing.
Tie-in connection for all kinds of service.
Review procedures/specification prior to the start of construction (Fabrication, Erection, installation of Piping, Hydrostatic/Pneumatic Testing, Welding and Reviewing of Construction Drawing.
Review of various design documents / drawings related to piping system submitted by contractors.
Review and approval of documents (i.e. Plot plan, Equipment layout, Piping drawings, Method of statements etc. submitted by Contractors.
Identify the bottleneck & inform to seniors, participate in daily, weekly & monthly progress meetings.
Keep an eye on the contractor to finish the project within the scheduled time frame.
Worked as a Piping Supervisor with CLIENT: Descon Engineering QATAR, L.L.C - Project: Ras Laffan Qatar from 17th February 2006 to 25th February 2008
Responsibility
Designed and implemented oil and gas pipeline installation software applications.
Monitoring of work progress, Assigning Resources to achieve the Target Schedule.
Study of Drawings, Maintaining Documentation, Preparation of Bill of Material, Estimating Consumables, Material Identification & Colour Coding.
Preparation of Reports (Daily/Weekly), includes Progress achieved, Forecast activities, Bottlenecks, Resources Statistics.
Interface Management, Sub-Contract Management, and Co-ordinate with Other Department for achieving Scheduled Completion date.
Inspection erection of U/G GRP pipe and fitting surface preparation, alignment, wrapping and curing, coordinate of pipe laying, sand bedding, and water compaction, elevation of pipe, Field Density Test layer
Wise, installation of thrust block to resist the forces develop by change in temperature and Valve support for the valve inside the valve pit.
Supervise construction activities inclusive of fabrication and erection of piping spools, Installation of valves, its direction, tag number, ratting as per approved isometric drawing.
Involve in Planning of Manpower, Material & Equipment during execution of project. Line up the manpower in proper way so that to reduce the wastage of time.
Witnessing Hydro test of various Piping. Hydro test of Pipeline activities (Cleaning, Gauging, Bidirectional Pigging, Calliper pigging) after Hydro test, Dewatering, Swabbing, Air drying & Nitrogen Purging in all gravity lines.
Worked as a Piping Supervisor with Dodsal ENGINEERING CONTRUCTION PTE LIMITED . UAE from 25th February 2009 to 29th December 2012 - Project Location: UAE Petroleum downtown,
Responsibility
Field supervision & reporting directly to the Project Manager on a daily basis for the construction activities & being supported by the Third Party Inspection personnel, Team of QA/QC & HSE.
Ensure that all construction work is carried out in accordance with Permit to Work procedures, project approved drawings, approved method statements and project priorities.
Review & Approve the Method statements, Material Approval Request & Inspection Test Plan, Site Technical Query & Design Changes Authorization submitted by the contractor.
To co-ordinate the approval of all "field change notes”.
Working on 3 week look ahead schedule to follow up the Project Schedule Milestones.
Attend meetings to provide assistance in Mechanical Completions, punch list clearing, Commissioning, and start up activities as required facilitating construction deliverables for these activities.
Supervision of Pipeline / Piping Installation work assuring to desire norms & procedure with scheduled time frame.
Raising RFI (Request for Inspection).
Installation & removal of PSV’s / PSE’s, various types & sizes of valves, fire fighting equipments.
Support to inspection team for internal & external inspection of equipments& final box ups.
Cold setting alignment of spring supports & hanger, Adjustment & repair of air cooler louvers, Assist & support to commissioning crew for catalyst loading, Installation of interlocks mechanism on PSV’s.
Requisition and/or Purchases Supplies material and tools
Ensure all the resources are Available to Site prior to work.
PERSONAL INFORMATION
Father’s Name : Abdul Rauf Ansari
Date of Birth : 2nd March 1982
Nationality : Indian
Religion : Islam
S e x : Male
Marital Status : Married
PASSPORT DETAILS
Passport No. : K – 6862234
Date of Issue : 03.10.2012
Date of Expiry : 02.10.2022
Place of Issue : Ranchi Jharkhand
DECLARATION
I do hereby declare that all the information as mentioned above is true & correct to the best of my knowledge and belief.
Date: March 2020
Place: India (MOHAMMAD RAMZAN ANSARI