CV Alaa Abdelhalim Aly *
Alaa Abdelhalim Aly
Senior Mechanical Engineer
Site Operations & Design
Contact: 009***********/009***********
Email: ads9b8@r.postjobfree.com
Profile Key experience Profession
Alaa has More than “23” years
of experience as Senior
Mechanical Engineer with good
experience in the
supervision and design of
Residential and Commercial
projects (consultant and
contractor)
Supervise, guide and follow up
with Main Contractor and their
MEP Subcontractors for MEP
works and review of material
submittals, method statements,
builders work, shop drawings &
as-built drawings and QA/QC &
HSE plans, procedures,
conducting the site progress
and technical meetings and
liaise with the local authorities.
Preparation of overall project
design, plan & execution of
strategies to achieve project
deliverables and timeline
objectives that required to set
up the organization & mobilize
the team and to develop critical
path method/ analysis and
schedules with respect to
design, planning, procurement,
execution, monitoring & control
and close-out of the projects
and also for management
review and approval.
Supervision & Design
Senior Mechanical Engineer
Nationality / Languages
Egyptian / Arabic & English
Qualifications
Bachelor of mechanical power
(Faculty of Engineering from
Assuit University) - Graduation
Date 1997
Course of safety in the
institute for Industrial
Safety
Certificate of Completion
from “Project
Management’ ’Institute-
Arabian Gulf Chapter
(PMI-AGC)” for
successfully completing an
intensive training on
“Project Management
Professional (PMP)
Certification Preparation
Seminar
Course of leed 101 green
building basics and leed
Course of HAP 4.61 for A/C
design with carrier
Approval from: Abu Dhabi
Municipality, Nakheel Dubai,
Damac Dubai, Musanada Al
Ain
Skills: Office, AUTOCAD,
PMP, HAP 5.11, leed, BIM
modeler
U.A.E. driving license
CV Alaa Abdelhalim Aly 2
Experience with Dorsch Consultant Engineering (Feb 2021 to date) Senior Mechanical Engineer
Responsibility: HVAC, Plumbing, Drainage & Firefighting Project : VVIP Villas (Palace) (B+Gr+F.F. +Roof)@Reef palace (Abu Dhabi) Air cooled chiller 750 Ton
Supervise, guide and follow up with Main Contractor and their MEP Subcontractors for MEP works and review of material submittals, method statements, builders work, shop drawings & as-built drawings and QA/QC & HSE plans, procedures, conducting the site progress and technical meetings and liaise with the local authorities.
Preparation of overall project design, plan & execution of strategies to achieve project deliverables and timeline objectives that required to set up the organization & mobilize the team and to develop critical path method/ analysis and schedules with respect to design, planning, procurement, execution, monitoring & control and close-out of the projects and also for management review and approval.
Control of projects through project management & engineering, discipline engineering, construction management and financial management.
Monitoring of progress of work for timely execution of the project through daily/weekly/monthly/ reports with respect to review of the overall status of the project. Experience with Lacasa Consultant Engineering (Nov 2016 to Feb2021) Senior Mechanical Engineer
Responsibility: HVAC, Plumbing, Drainage & Firefighting Projects:
Aloft hotel (B+G+11floor+H.C. +R) in palm Jumeirah (Dubai)
Paramount tower (3B+G+10P+55floor) Dubai 2200Ton
Office building (5B+G+11floor) Dubai (DIFC) Obtained approval from DAMAC Dubai Supervise, guide and follow up with Main Contractor and their MEP Subcontractors for MEP works and review of material submittals, method statements, builders work, shop drawings & as-built drawings and QA/QC & HSE plans, procedures, conducting the site progress and technical meetings and liaise with the local authorities. Preparation of overall project design, plan & execution of strategies to achieve project deliverables and timeline objectives that required to set up the organization & mobilize the team and to develop critical path method/ analysis and schedules with respect to design, planning, procurement, execution, monitoring & control and close- out of the projects and also for management review and approval. Experience with Crown Home Consultant (Sep 2012 – Nov 2016) Head of Mechanical Department Employer
Responsibility: HVAC, Plumbing, Drainage & Firefighting Projects:
Alfattan Cristal towers (2 Basement +GR+Podium+ two towers) (Tower A 5-star hotel 39 floors) and
(Tower B 34floors) in JBR Dubai Water cooled chiller 5650 (700 million AED
Project 2building in Dubai (B +G+4) at Jumeirah village
Project (22 villas in Dubai) (G+1)
Project (G+podium+12+health club) in Tecom Dubai
Steel wood Factory in Jabil Ali Dubai
Office building (2basement+G+3) in Dubai
Commissioning of HVAC system for extension of dragon mart Plant room 7500 Ton
Nakheel mall project in Palm Jumeirah Dubai 8250 Ton (1200 million AED) Supervise, guide and follow up with Main Contractor and their MEP Subcontractors for MEP works and review of material submittals, method statements, builders work, shop drawings & as-built drawings and QA/QC & HSE plans, procedures, conducting the site progress and technical meetings and liaise with the local authorities. CV Alaa Abdelhalim Aly 3
Preparation of overall project design, plan & execution of strategies to achieve project deliverables and timeline objectives that required to set up the organization & mobilize the team and to develop critical path method/ analysis and schedules with respect to design, planning, procurement, execution, monitoring & control and close- out of the projects and also for management review and approval. Experience with Dewan Architects Consultant (Oct 2009 – Sep 2012) Senior Mechanical Engineer
Responsibility: HVAC, Plumbing, Drainage & Firefighting Projects:
(3 Schools) at Alain (1225 student) each school including (Swimming pool, laboratory, sports hall, auditorium) Air cooled chiller (Mazyad, Um ghaffa1 and Um ghaffa2)
Obtained approval from musanada Alain
Project School at western region (800 students) including (Swimming pool, laboratory, sports hall, auditorium) (Badaa School) Obtained approval from municipality Abu Dhabi Experience with ACE International Consultant (Nov 2007 – Oct 2009) Senior Mechanical Engineer
Responsibility: HVAC, Plumbing, Drainage & Firefighting Projects:
Project Package 15 International City (26) Building (G+5) (15Flats each floor) Responsibility for
(HVAC, plumbing, Drainage and firefighting) Obtained approval from Nakheel Dubai Experience with Moosa Industrial Co-Minco contractor (Jan 2005 – Nov 2007) Project Manager
Project:
Project– Elite Hotel Mina Dubai (B+G+4) Floor (60 flats each floor) (Hotel) Senior Mechanical Engineer
Projects:
Zen Gardens 1B+Gr +8floor (8buildings) (23 flats each floor)
Tamweel 3B+Gr+34floors
Mankhool Building (Golden Sand12) (Hotel) (3B+Gr+8floors) (40 flat each floor) Preparation of overall project design, plan & execution of strategies to achieve project deliverables and timeline objectives that required to set up the organization & mobilize the team and to develop critical path method/ analysis and schedules with respect to design, planning, procurement, execution, monitoring & control and close- out of the projects and also for management review and approval. Control of projects through project management & engineering, discipline engineering, construction management and financial management.
Monitoring of progress of work for timely execution of the project through daily/weekly/monthly/ reports with respect to review of the overall status of the project. Ensure the delivery of the projects within the contract duration and within the agreed budget through regular meetings and monitored performance and expenditure in respect of the plan. Experience with the Arab Office for Planning and Architecture (May 2003 – Jul 2005) Mechanical Engineer
Projects:
Two School at Abu Dhabi
Obtained Approval from PWD for two school projects (Abu Dhabi) CV Alaa Abdelhalim Aly 4
Supervise, guide and follow up with Main Contractor and their MEP Subcontractors for MEP works and review of material submittals, method statements, builders work, shop drawings & as-built drawings and QA/QC & HSE plans, procedures, conducting the site progress and technical meetings and liaise with the local authorities. Experience with Consultant Engineer Office - Egypt (Dec 1997 – May 2003) Mechanical Engineer
Supervision, Design of HVAC
Responsibility
Supervise, guide and follow up with Main Contractor and their MEP Subcontractors for MEP works and review of material submittals, method statements, builders work, shop drawings & as-built drawings and QA/QC & HSE plans, procedures, conducting the site progress and technical meetings and liaise with the local authorities.
Preparation of overall project design, plan & execution of strategies to achieve project deliverables and timeline objectives that required to set up the organization & mobilize the team and to develop critical path method/ analysis and schedules with respect to design, planning, procurement, execution, monitoring & control and close- out of the projects and also for management review and approval.
Control of projects through project management & engineering, discipline engineering, construction management and financial management.
Monitoring of progress of work for timely execution of the project through daily/weekly/monthly/ reports with respect to review of the overall status of the project.
Ensure the delivery of the projects within the contract duration and within the agreed budget through regular meetings and monitored performance and expenditure in respect of the plan.
Provide leadership & direction to various contractors during project execution, maintain ongoing relationships and ensured that the business dealings with clients, subcontractors and vendors were conducted with a high professional standard.
Maintain of high safety standards on all projects with feedback from the HSE staff for
zero accidents in all projects.
Creation of teamwork and a spirit of co-operation among employees.
Review and comment on relevant Method Statements, QCP, and record as submitted by contractor and ensure its compliance with contract requirements.
Participate in reviewing Field design changes as submitted by contractor.
Technical support and assessment to contracts engineer and cost engineer of trend notices, approved variation and claims (when raised by contractor).
Attend Technical Meetings with contractor, and weekly progress meeting if required by Project Lead / Head Discipline Engineer
Advise Planning engineer and Project Lead of any slippage of progress regarding site activities.
Witnesses testing and commissioning and performance of various plant and systems. Issue 'Handing Over' certificate for completed works.
Participates in the coordination and monitoring of snagging and project handover.
Review and approved all close documents as submitted by contractor. CV Alaa Abdelhalim Aly 5
Review and approve shop drawings, Material Submittals, and Methods statements to make sure they are as per contract drawings, specifications and Standards. Monitor’s performance of contractors and assisting residence engineer in decision making.
Assist in the static and dynamic Commissioning of central mechanical plants, chillers, cooling towers, pumps, precision HVAC systems, and other mechanical/ electrical systems.
Factory visits and Witnessing Factory Acceptance Test,
Conduct site observation surveys and prepares field reports on the status of projects and completion of projects with respect to compliance to the contract and specifications.
Development of commissioning plans. Engineering design reviews. Interacts with contractors, interprets design and specifications. Coordinate with clients, tries to resolve problems within the scope of the design meetings the Owner Project Requirements and Commission Plans. Issuing punch list reports and determines corrective measures for on-site problems. Familiarize oneself and with codes, local project regulations, construction practices and the latest equipment functional concepts
Calculation, duct sizing, pipes sizing, equipment selection, BMS.