Post Job Free
Sign in

Industrial Electrician,electrician

Location:
Al Masfalah, Makkah, Saudi Arabia
Posted:
October 30, 2022

Contact this candidate

Resume:

CELSO DE ISIDRO GERONGAY

KHAMIS MUSHAYT, SAUDI ARABIA

***************@*****.***

****************@*****.*** +966********* / +966*********

APPLIED: ELECTRICIAN

Objective

● To develop a career that embodies professionalism and excellence with advancement.

● To contribute and enhance my knowledge in electrical work.

Profile

Read and interpreted electrical and mechanical drawing as standard code specification, compliance of both British & American electrical standard specification.

High knowledge of electrical work motor control, stop/start, forward-reverse, y delta connection, PLC, VFD, soft starter, pneumatic, abb flow meter, millwright, pump mechanic.

Follow the safety procedure inside the company worksite.

Achievements

TQM (Total Quality Management) of the EEI Engineering in the Philippines.

AIT Approved Letter (APPRENTICESHIP AND INDUSTRY TRAINING) CANADA

IOSH managing safety training - Philippines

ACSA Certificate –Alberta, Canada

Education

Collegiate

Mindanao University of Science and Technology March 1992

Two years certificate of Technology

Major in Electronic Technician

Secondary

Halapitan National High School March 1990

Halapitan, San Fernando, Bukidnon

Work History

Electrician

Assol AL Benaa Trading & Contracting Co. January 07, 2014 - Present

P.O.BOX 2698 Khamis Mushayt 61961, KSA

011************ - Fax 011************

Read and interpreted electrical and mechanical drawing as standard code specification, wiring main supply and distribution panel,PLC ( programmable logic control) wiring motor control & soft starter, installation pump motor & submersible pump and aligned, millwright, pump mechanic. Repairing of automatic gate barrier (cane). Scada operator of STP plan and pumping station. Monitor choline building instrument like Jesco chlorinator c 2701, c2525-v, Jesco topax

Conduct preventive maintenance programs of (STP) sewerage treatment plan, Install underground wiring and cables. Install, replace and repair electrical control. Splice, joint and connect wires. Test and measure voltage, loads, ground fault integrity of circuits. Troubleshoot and isolate faults. Replace and repair electrical and electronics control in the panel board, Install and wiring vfd Drive & soft starter, abb lst 400, abb flow meter, abb awt 400, mov.Changes oil of gear box, changes mechanical seal and oaring, change bearing inner & outer. Check pneumatic cylinder, Log-out and tag-out.

Pulled wire through conduit, installed panel board & termination, wiring of light & power socket, fabrication work, testing and commissioning with engineer and plant in charge.

Electrician

AL NASR CONTRACTING LLC July 10, 2008 – June 23, 2013

P.O BOX 2436 Abu Dhabi U.A.E

Read and interpreted electrical and mechanical drawing as standard code specification, Wiring Main Supply and Distribution Panel, Wiring Motor Control & soft starter, installation pump motor, millwright, pump mechanic.

Installation of flow meter and wiring. Installation of 11 kV / 33 kV Hyundai and ABB, electric Schneider, SIEMENS switchgear. Install and wiring VFD Drive, Installation of solar panel, testing electrical instruments, Install cable tray.

Troubleshoot and isolate the fault. Replace and repair electrical and electronics control, test and measure voltage, load, ground faults integrity of circuits.

Conduct preventive maintenance programs in Pumping Station & plant workshop.

Electrician / Conduit Fitter

KHARAFI NATIONAL W.L.L September 16, 2007 – July 09, 2008

P.O Box 24081, Safat 13101 – Kuwait

+965******** – Fax: +965647608

Read and interpreted electrical and mechanical drawing as standard code specification.

Pulled wire through conduit, installed panel board & termination, wiring of light & power socket, Install underground wiring and cable, layout and installation of switch gear panel, layout lighting arrester.

Cable pulley, cable cad welded, layout and installation of switch gear board, layout lighting arrester, fabrication work with cable tray. Logout and tag-out.

Electrician

MIDMAC CONRACTING CO. W.L.L July 09, 2005–February 07, 2007

P.O Box 1758, Doha – Qatar

+974******* – Fax: +974*******

Read and interpreted electrical, mechanical plans and drawing, cable pulley, wiring and termination of lighting and power supply installation of light fixture and devices.

Cable pulley, cable cad welded, layout and installation of switch gear board, layout lighting arrester, fabrication work with cable tray. Install pipe Treaded, cut, bending.

Cable glanding and termination, layout for lighting power and auxiliary system, setting of utility box for power, millwright. Handle electrical equipment for any hand use.

Industrial Electrician

MODUDRIVE INDUSTRIAL CORPORATION

Unit 602, west trade center building, February 20, 2002 -June 25, 2005

132 West Avenue, Phil-am, Quezon City, Philippines

011**********

Read and interpreted electrical and mechanical drawing as standard code specification, cable wiring main supply and distribution panel, wiring motor control, stop/start, forward/reverse, wye delta, install and wring VFD Drive, millwright, willet inkjet printer technician (for small and large character), installation of motor, Changes oil of gear box, changes mechanical seal and oaring, change bearing inner and outer.

Termination of main switch board, emergency switch board, generator main supply, bended pipe& treaded, installed conduits, operate and calibrate metal detector for food and pharmaceutical industry, preventive maintenance of conveying system.

Isolate the fault of electrical system, replace and repair electrical & electronics control in the panel board.

Industrial Electrician

FIESTA BRAND Incorporation March 03, 2000 – January 21, 2002

Makati, Philippines

011***********

Read and interpreted electrical and mechanical drawing as standard code specification. Preventive maintenance, termination for power cable ATS, MCC, switch gear to distribution panel, setting of MVSG, LVSG, MCC Panel and bus bar.

Wiring motor control, stop/start, forward/reverse, wye delta, install and wiring, millwright, installation of motor, changes mechanical seal and oaring.

Pulled wire through conduit, installed panel board & termination, wiring of light & power socket, fabrication work, testing and commissioning with engineering dept.

Industrial Electrician

EEI Corporation Engineering Equipment Corp.

188 E. Rodriguez Jr. Avenue, September 17, 1996 – Dec.19, 1999

Bagumbayan Quezon City 1110, Philippines

006***********

Read and interpreted electrical and mechanical drawing as standard code specification, cable wiring main supply and distribution panel, wiring motor control, stop/start, forward/reverse, wye delta.

Termination of main switch board, lay out and wiring for generator main supply, preventive maintenance

Pulled wire through conduit, installed panel board & termination, wiring of light &power.

Interests

Playing basketball, volleyball and soccer to maintain good exercise

Playing billiards, badminton, basketball and table tennis

Reading books and surfing in the internet

Visiting relatives and friends

REFERENCES PERSON TO BE FOLLOW UPON REQUEST

CELSO DE ISIDRO GERONGAY

Applicant



Contact this candidate