Post Job Free

Resume

Sign in

Piping Engineer Aramco

Location:
Qatar
Posted:
October 26, 2022

Contact this candidate

Resume:

MOHAMMAD AAMIR ARAFAT

C/o – Late Mohammad Sami, Bettiah Town, Ganj No.-2, ILAM Ram Chowk,

Police Station & Post Office - Bettiah, Pin Code – 845438, West Champaran,

State - Bihar, INDIA.

Mobile No. +91-990*******

E-mail: ads7bl@r.postjobfree.com

Total Experience: 22 Years (15 Years Abroad & 7 Years India)

Post Applied for PIPING SUPERVISOR

CAREER OBJECTIVE

To utilize my professional skills and experience, to achieve success in contributing towards the corporate objective of a progressive company that offers professional growth, while being resourceful and flexible, I believe to take responsibility to get a job in multifunctional business management, and diligence is my forte.

Dedicated Pipeline Piping Fabrication, Installation, Testing, Pre Commissioning & Commissioning works activities as per the client’s requirements. Having professional work experience with over 22 years of rich experience in Piping, Oil & Gas, Petrochemical, Power, Chemical Industries construction & Inspection

I am a professional with 22 years of rich experience in the fields of Pipeline Piping Fabrication, Installation, Inspection Testing & Commissioning, Erection and Alignment of Equipments (Rotating & Static), Construction of Double wall storage tanks in various major Oil & Gas, Petro-chemical, Ship (Semi Submergible Oil Rig Construction & Inspection.

EXPERIENCE PROFILE

Over 22 year of hard core working experiences in Oil and Gas Industries, Petrochemical Industries, Refinery under the department of Piping & Mechanical in different locations in India, United Arab Emirates, Islamic Republic of Iran, Kazakhstan, Qatar and Kingdom of Saudi Arabia.

DURATION

EMPLOYER

LOCATION

DESIGNATION

Jan. 2017 to continue

Reliance Industries Limited (EPC)

INDIA

Piping Engineer

Nov.2015 to May 2016

SICIM (EPC)

KAZAKHSTAN

pipeline & piping Superintendent

Oct.2013 to May 2015

Rmec Project Limited

INDIA

Piping Engineer

Dec. 2011 to July 2013

Marie Tecnimont ( EPC )

ABU DHABI

Piping & Mechanical construction Supervisor

Dec 2010 to Sep 2011

Tata Steel ( EPC )

INDIA

Piping Engineer

May 2009 to Aug 2010

Chiyoda Technip, Joint Venture ( EPC )

DOHA QATAR

Piping Construction Supervisor

Jan 2007 to Oct 2008

Consolidated Contractor Co.(CCC)

SAUDI ARABIA

Piping Superintendent

Oct 2005 to Sep 2006

BECHTEL Kazakhstan ( EPC )

KAZAKISTAN

Piping Supervisor

July 2004 to Aug 2005

Consolidated Contractor Co. ( C C C)

UAE

Piping Supervisor

Sep2003 to May 2004

Consolidated Contractor Co. ( C C C )

QATAR

Piping Supervisor

Nov 1996 to July 2003

National Petroleum Cont. Co. ( N P C C )

UAE

Piping Supervisor

Nov 1995 to Oct 1996

THERMO Construction Ltd.

Jamshedpur, INDIA

Piping Supervisor

EXPERIENCE ABROAD

spearheading as Pipeline & piping Superintendent with SICIM, Kazakhstan, (From November 2015 to May 16 ) I am engaged in the execution of pipeline & Piping production engineering while communicating, recording and issuing design changes for revised pipeline work to the project team. Skilled in coordinating with the sub-contractors to ensure the compliance of quality assurance, I am duly involved in carrying out visual inspection or line checking for hydro testing, pneumatic testing and reinstatement of pipeline. Competent in handling multifarious functions under high pressure environments with tight deadlines, I have provided valuable inputs for process improvement and provided an extra edge to operational efficiency.

Equipped with well-honed skill sets for operational and maintenance practices covering entire techno-managerial aspects, I am making constant endeavors to meet or exceed the expectations and demands of the organization. I have been involved in installation, testing and commissioning of pipeline & Piping systems of the projects. Fully conversant with the project HS&E Plan, I proactively participate in achieving the highest possible International standard of HSE implementation. With keen technical acumen, I am well equipped in conducting fault diagnosis & failure analysis while developing & improving the processes by taking corrective actions to prevent any reoccurrences & defective issues. My significant contribution in effective planning and execution has attributed to successful completion of projects as per the agreed timelines and quality standards.

Duration : 04th Dec 2013 to 30 May 2015

Employer : RMEC Private Limited

Location : India Gujarat

Position : Piping Engineer

spearheading as Piping Engineer with RMEC (From Oct 2013 to May 2015 ) I am engaged in the execution of pipeline production engineering while communicating, recording and issuing design changes for revised piping work to the project team. Skilled in coordinating with the sub-contractors to ensure the compliance of quality assurance, I am duly involved in carrying out visual inspection or line checking for hydro testing, pneumatic testing and reinstatement of piping. Competent in handling multifarious functions under high pressure environments with tight deadlines, I have provided valuable inputs for process improvement and provided an extra edge to operational efficiency.

Duration : 04th Dec 2011 to 31st July 2013

Employer : MAIRE TECNIMONT

Location : HAbshan-5 Project Abu Dhabi (UAE)

Position : Piping & Mechanical construction Supervisor

Principle responsibility :

Well conversant with the Project HS&E Plan. Proactively participate in achieving the highest possible International standard of HSE implementation. Review, and apply the contract.

Ensure all work being carried out is done in a timely manner and in line with the master schedule. Effective maintenance of Performance through HS&E and STOP program. Achieve safety standards as defined in personal performance contract.

Specifications, project procedures, relevant codes and standards in the execute on of piping production engineering. Access on site review station. Communicate, record and issue design changes and revised pipe work fabrication isometrics to the project team in a timely manner and in accordance with the project procedures; i.e. Contract Change Notices, Site Engineering Queries, Field Design Change Notices, Site Instruction ETC.

Coordinating with the sub-contractors (Engineers, Supervisors and Inspectors) to ensure the compliance of quality assurance. Carried out Visual inspection or line checking for hydro testing, pneumatic testing and reinstatement of pipe.

Access on site review station. Communicate, record and issue design changes and revised pipe work fabrication isometrics to the project team in a timely manner and in accordance with the project procedures; i.e. Contract Change Notices, Site Engineering Queries, Field Change Notices, Site Instructions.

Close A0 &“A” Punch SPL Punch DPL Punch and approved by company.

Punch list form and Preservation Certificate,

For Piping (Check sheets): Line index. Piping installation.

Mechanical Completion Certificate.

All inspection of pipe line carried by API – 1104, like wps. Fit up, per heat, welding, weld joint, NDT. Etc.

Duration : 07th May 2009 to 31st August 2010

Employer : Chiyoda Technip Joint Venture

Location : QCS Project, Raslaffan, Doha Qatar

Position : Piping construction supervisor

Principle responsibility :

Well conversant with the Project HS&E Plan. Proactively participate in achieving the highest possible International standard of HSE implementation. Review, and apply the contract.

Ensure all work being carried out is done in a timely manner and in line with the master schedule. Effective maintenance of Performance through HS&E and STOP program. Achieve safety standards as defined in personal performance contract.

Specifications, project procedures, relevant codes and standards in the execution of pipeline production engineering. Access on site review station. Communicate, record and issue design changes and revised pipe work fabrication isometrics to the project team in a timely manner and in accordance with the project procedures; i.e. Contract Change Notices, Site Engineering Queries, Field Design Change Notices, Site Instruction ETC.

Coordinating with the sub-contractors (Engineers, Supervisors and Inspectors) to ensure the compliance of quality assurance. Carried out Visual inspection or line checking for hydro testing, pneumatic testing and reinstatement of pipe.

Preparation of construction work packs and job cards. Work with the inspectors and contractor for resolution of quality control related issues or concerns.

Close X &“Y” Punch SPL Punch DPL Punch and approved by company.

Mechanical Completion Check Record’s.

Punch list form and Preservation Certificate,

For Pipeline (Check sheets): Line index. Pipeline installation.

Involved in PMC activity.

For Mechanical Equipment: Mechanical Completion Certificate.

Mechanical Completion Status Index.

Duration : 12th January 2007 to 14th October 2008

Employer : Consolidated Contractor Company (CCC)

Location : AL Khobar, Kingdom of Saudi Arabia

Site Area : NGL Recovery, Hawiyah

Position : Piping Superintendent

Principle responsibility:

Review the scope of work as described in the Contract. Well familiar with procedures and during this period I have been involved in fabrication, installation, testing and commissioning of pipeline systems (Marine & Process) of the projects.

Documentation for Compile and ensured timely issue of detailed Pipe work Work-packs containing, work-scope description, piping work and Material Issue Notes.

Responsible for prepare piping hydro test packs based on PED category, and personnel involvement in pre-commissioning activities (identify SYSTEM and SUB SYSTEMS for pre commissioning).

Following documents By using WIN PCS as Completion.

Mechanical Completion Status Index’s.

Punch list form and Preservation Certificate,

For Piping (Check sheets ) : Line index

Piping installation

Piping system Flushing & Testing.

Test pack Reinstatement

Test pack bolt tensioning

Chemical cleaning.

Fully Involved in PMC activity.

Access on site review station. Communicate, record and issue design changes and revised pipeline work to the project team in a timely manner and in accordance with the project procedures; i.e. Contract Change Notices, Site Engineering Queries, Field Change Notices, Site Instructions.

Liaise with fabrication personnel to ensure issue of engineering information and drawings are being issued in line with the construction schedule.

Duration : 13th October 2005 to 16th September 2006

Employer : BECHTEL, Kazakhstan

Location : Tangies, Kazakhstan

Site Area : SPL Tangis, Kazakhstan

Position : Piping Supervisor

Principle responsibility:

During this period I have been involved in fabrication, installation, testing and commissioning of piping systems (Marine & Process) of the projects.

Well conversant with the Project HS&E Plan. Proactively participate in achieving the highest possible International standard of HSE implementation.

Review the scope of work as described in the Contract. Liaise with the Pipeline Supervisor, Engineer, Planning Engineer and Forman.

Estimate the scope of work and liaise with the fabrication Engineering Manager to ensure that Contractor supplied material is requisitioned in a timely manner to enable procurement in accordance with the Contract Master Schedule.

Liaise with fabrication personnel to ensure issue of engineering information and drawings are being issued in line with the construction schedule.

Ensure all work being carried out is done in a timely manner and in line with the master schedule. Effective maintenance of Performance through HS&E and STOP program. Achieve safety standards as defined in personal performance contract.

Review, and apply the contract specifications, project procedures, relevant codes and standards in the execution of piping production engineering.

Preparation of construction work packs and job cards. Work with the inspectors and contractor for resolution of quality control related issues or concerns.

Oversight of all contractors’ fabrication and installation activities for successful completion of the work in accordance to the project schedule and contract. Responsible for on and offshore construction activities. Work with the inspectors and contractor for resolution of quality control related issues or concerns.

Duration : 4th July 2004 to 4th August 2005

Employer : Consolidated Contractor Company (CCC), UAE

Location : Abu Dhabi, UAE

Site Area : ONSHORE GAS DEVELOPMENT PROJECT, Phase–II

Position : Piping Supervisor

Principle responsibility:

During this period I have been involved in fabrication, installation, testing and Pre commissioning of piping systems (Marine & Process) of the projects. Closely monitor piping activities and ensure implementation of projects specifications. Conducting Line Checking:-

Punch List handling, handling 2 groups to correct punched items and preparing a list of missing materials for request. Also attend and supervised bolt tensioning activities.

Assigning to the Fabrication of the Piping supports of about 5,000 tons x 65,000 pcs. Closely monitor fabrications activities in accordance with the specs and fabrication drawings. Counter check up daily production status compares with the fabrication index and prepares progress report.

Preparing shop drawing and isometric drawings, supervise the fabrication and erection works, preparing daily work schedule, prepare daily work progress, closely monitor and follow up urgent materials.

Evaluate and monitoring manpower, equipment and other urgent materials to meet the estimated work production and propose, suggest corrective action to the client when encountering field interfaces.

Duration : 05th September 2003 to 09th May 2004

Employer : Consolidated Contractor Company (CCC), QATAR

Location : QAFCO, Doha

Site Area : QAFCO-4, Expansion Project,

Position : Piping Supervisor

Principle responsibility:

Checking and verifying the drawings and specifications familiarized on the construction details. Ensure that the drawings are in latest revision and editions, approved for fabrication and construction. Monitoring inspection at implementation of projects procedure, specifications at method for statement. .

Assigning the area respectively, conducting walk down inspection and punch clearing work. Study and implement approved ITP’s (Inspection and Test Procedure) to be conducted on all pipeline installation. Supervising and monitoring of pipe spool on above ground pipe racks and underground pipeline, conducting punch clearing for rectified punched items and make confirmation to hand over to the client’s consultant for final walk down / punch listening and clearing prior to test requirements.

Inspection of surveillances of pipes and ensuring it is in accordance with the General Specifications and approved for construction. Enforce soundless of quality for field workmanship. In charge of monitoring for cleaning of punch item of test packages. Coordinates schedule of testing on piping to both hydro test group and QC. Perform related jobs as assigned by the area piping Supervisor.

Direct supervise and coordinate activities of workers engaged in the fabrication, installation and underground pipes for drains and above grounds for process plants and structure erection equipments. Studies plan drawings to determine the extent of work to be done, material and equipment to be used, assists in preparation the schedule of work activities and give assignments to subordinates like Foreman, Charge Hand and give priority to critical areas.

Inspects work in progress to determine conformity with plans and specifications, suggest better way of pursuing works assignments to achieve more economical and efficient work operations.

Duration : 29th November 1996 to 11th July 2003

Employer : National Petroleum Construction Company (NPCC), UAE

Location : Abu Dhabi

Site Area : N PCC, Abu Dhabi

Position : Piping & pipeline supervisor

Principle responsibility :

During this period I have been involved in fabrication, installation, testing and Pre commissioning, Inspection of piping systems of the below mentioned projects:-

1.ZADCO CENTRAL COMPLEX, SATELLITE & WELL HEAD PLATFORM: - Installation of two new Gas Turbine, Involves in Piping connections and Structural also involve in extension of Skid for plat form installation of piping and fully connections of Skid, Hydro Testing and Testing Commission.

2.SATTAH & UDECO FLELD:- Installation of Vessel and fully connections of piping.

3.ADMA-UMM SHAIF & ZAKUM WEST SUPER COMPLEX:- Modifications of water injection plant and modification of piping, Gas Turbine, New structural installed and piping work.

4.ARAMCO OFFSHORE FIELD (SAUDI ARABIA):- Installation of Oil Lines, pipe high pressure in the sea for 100 Kilometer and Installation of new process platform.

5.QGPC MERSK OIL FIELD (QATAR):- Installation of Process Platform, water injections platform and fully piping installation. Fiber Glass pipe for Fire Fighting, Stainless Steel, Nice, Mild Steel etc.

6.DAS ISLAND & ZIRKU ISLAND:- Modification of tank and flair pipe line.

7.RUWAIS ADNOC JETTY LOADING AREA & REFINERY:- Installation of new loading Berth, Loading arms, Modifications Berth C.E, Installation of new moves and piping work.

8.ADNOC ONSHORE GAS DEVELOPMENTY PRIOJECT PHASE-II :- Fully piping, vessel installation, Connection, Hydro testing and commissioning works.

9.IRAN FIELD SOROOSH / NOWROOZ INTEGRATED DEVELOPMENT PROJECT: - Structural, Piping, Vessels, Kerosene Drum Installation Hydro Testing and Commissioning.

Duration : 10th November 1995 to 22nd October 1996

Employer : THERMO Construction Limited, Jamshedpur, INDIA

Location : Jamshedpur, India

Site Area : BOC GAS Jamshedpur & TATA Steel Jamshedpur.

Position : Piping Supervisor

Principle responsibility :

Responsibility in interpretation of all related drawings of piping works

Responsibility in fabrication and erection activities

Responsibility in safekeeping of materials, tools for installed.

Responsibility in making daily accomplishment report.

Conducting punch list and pre-commissioning activities.

Conducting all kinds of testing in accordance to piping standard.

EDUCATIONAL QUALIFICATION

Passed I. Sc. from Bihar Intermediate Educational Council, Patna, India.

Year of Passing : 1991

Division Obtained : 1st

TECHNICAL QUALIFICATION

Passed Three years Diploma in Mechanical Engineering, from New Government Polytechnic College, Patna

Year of Passing : July 1995

Branch : Mechanical Engineering

Division Obtained : First Class

University Name : State Board of Technical Education, Bihar

(Professional Graduate Programmed (P.G.P.M.E.) IN MECHANICAL ENGINEERING IS COMPLETE IN 2016 FROM IIMT GUJRAT INDIA)

NDT Label II Training in: - Ultrasonic Testing, Radiographic Testing, Penetrant Testing, Magnetic Particle Testing.

Safety Training Attended

Completed 30 Hours OSHA Training course in Ras Laffan, Doha, Qatar. (Certificate Registration # O.U.T.0004345)

Completed Safety Training, conducted by TATA Steel Council, under the branch of Industrial Safety Management, TATA Steel, Jamshedpur India.

Completed Safety Training, TATA Steel Council, under the branch of Fire Fighting Management, TATA Steel, Jamshedpur, India.

SAFETY AND QUALITY RESPONSIBILITIES:

1.Maintain standards of safety and comply with company’s Health, Safety & Environment Management System requirements.

2.Take reasonable care of health, safety and Environment that others in the workplace.

3.Follow and maintain Company standers of Quality in accordance with Company Quality System requirement.

PERSONAL DTAILS:

Father Name : Mohammad Sami

Date of Birth : June 07th 1973

Place of Birth : Bettiah, Bihar, India

Religion : Islam

Nationality : Indian.

Marital Status : Married

Languages Known : English, Hindi & Arabic.

PASSPORT DETAILS :

Passport Number : M1981457 {ECNR}

Date of Issue : 3 0 August 2014

Date of Expiry : 29 August 2024

Place of Issue : Indian Patna.



Contact this candidate