Engr. Benzon C. Bulawan

Mechanical Engineer

Mobile #: 60016368

E-mail: ads65a@r.postjobfree.com

Kuwait Society of Engineer (KSE ID)

Kuwait driver's license (Valid until 2023)

Position Desired: Mechanical Engineer

Objective: To achieve outstanding performance and accomplishments in performing my duties and responsibilities, complying with the safety and health standards in my engineering career as Mechanical Engineer.

Total Years of Experience = 16 years

1. Work Experiences:

Position: MEP Engineer (Facility and Maintenance)

Company: ECOVERT FM KUWAIT

Date Employed: November 10, 2021 - Present

Company Business: Contractor

Name of Project: Facilities and Maintenance of Jazeera Terminal 5 Airport Location: Terminal 5

Owner / Clients: Jazeera Airways

Job Responsibilities:

Responsible for maintenance of HVAC, Fire Fighting and Plumbing equipment.

Engineer in charge of HVAC Preventive maintenance of Air-cooled Chiller, Chilled water pumps, AHU, VAV, Pressurization Fans and Toilet exhaust fans.

Engineer in charge of Firefighting Preventive maintenance of Fire pumps, Jockey pumps, Isolation valves, Smoke exhaust fans and Fire hose reel & extinguishers.

Engineer in charge of Plumbing Preventive maintenance of Booster pumps and Irrigation pumps.

Create reactive work order for damage assets and make MRF for immediate purchase of materials.

Monitor all reactive work order to be closed before the SLA, not to get penalty from the client.

Study and propose additional facility to improve the services of Jazeera Terminal. 2 cm x 3cm

ID PHOTO

Page 2 of 5

2. Work Experiences:

Position: MEP Engineer

Company: EiFFAGE GENIE CIVIL MARINE KUWAIT

Al Manar Tower A, 4th Floor Coastal Road 209 Building 168, Block 2, Mahboula

Date Employed: September 12, 2020 - October 31,2021 Company Business: Contractor

Name of Project: Package 5: Al Zour New Refinery Project (EPC 045) Location: AL Zour

Owner / Clients: KIPIC (Kuwait Integrated Petroleum Industries Company) Consultants: PMC Wood

Job Responsibilities:

Responsible for HVAC, Fire Fighting and Plumbing system drawing review.

Supervise installation works by providing method statements and procedures.

Site Visit on HVAC, Fire Fighting and Plumbing systems installation of Subcontractor to check if they meet the Owner/Client requirement.

Coordination with subcontractor for the submission of IN/RFI to Consultant.

Prepare MAR in advance to cope up with the delivery schedule and work progress.

Supervise the Flushing and Disinfection of piping system for HVAC and Plumbing System.

Supervise the Flushing and Gross leak test of piping system for Fire Fighting system.

Supervise the Purging and Vacuum of Refrigerant line for all HVAC Equipment.

Supervise the Auto-Control works for HVAC Control Panel.

Supervise SRT and MRT for Fan motor of All HVAC Equipment for Pre-commissioning stage.

Supervise together with vendor the Energization of All HVAC Equipment for Commissioning stage.

Report to MEP Manager for work progress, workers needed, tools and materials required from time to time, updating all files and reports.

Daily submission of All inspection request to Consultant and Owner representative.

Preparation of Documents for MC walkdown stage.

Supervise the MC walkdown of HVAC, Fire Fighting and Plumbing System.

Submission of MC completion for Certification of Client. 3. Work Experiences:

Position: HVAC Engineer

Company: JASSIM QABAZARD ENGINEERING CONSULTANTS

Al-Tijaria Tower, 32nd floor, Al-Soor Street, Sharq Date Employed: October 13, 2019 - August 31,2020 – 10 months Company Business: Consultant

Name of Project: Package 2: Administration Building, Car Park and Fire Station Location: Kuwait International Airport

Owner / Clients: Directorate General of Civil Aviation Consultants: DAR – JQEC

Page 3 of 5

Job Responsibilities:

Conduct site inspection for outstanding works of contractors.

Record all the discrepancy found on site and make a Punch List.

Reviewing Testing, Adjusting & Balancing Reports for Final Approval.

Do witness Pre-commissioning and Commissioning of HVAC Equipment.

Review and check of Spare parts for Final Hand over to Client.

Review the O & M Manual for Final Hand over to Client. 4. Work Experiences:

Position: HVAC Engineer

Company: O&G Engineering and Gen Cont. Co.

Ahmadi, Kuwait

Date Employed: Dec 28, 2016 - October 12,2019 – 2 years and 10 months Company Business: General Contractor /

Oil and Gas

Name of Project: Ali Al Sabah Military Academy Project Location: Al Mutlaa, Jahra, Kuwait

Completion Date: Jan 31, 2015 - Dec 31, 2019

Owner / Clients: Ministry of Defense

Consultants: Gulf Consult

Job Responsibilities:

Responsible for HVAC system drawing review, Consultant and Owner coordination.

Supervise installation works by providing method statements and procedures.

Direct supervision on all HVAC systems installation, inspection and testing.

Coordination and progress monitoring, updating RFI (request for inspection).

Re-check dimensions, specifications of delivered HVAC materials at site.

Prepare materials requisitions in advance to cope up with the delivery schedule and work progress.

Report to HVAC Manager all status of the work, workers needed, tools and materials required from time to time, updating all files and reports.

Record all areas where HVAC installations are on scheduled time

Daily submission of inspection request to Consultant and Owner representative.

Review as-built drawing completed by draftsman, and put comments as per actual modifications and revisions.

Attend coordination meetings, HSE scheduled safety orientation and trainings.

Daily site inspection of completed jobs and prepare snag reports.

Update revised drawings transferred by civil and structural team, and review affected HVAC route.

Daily coordination with consultants to update HVAC activities on each buildings and other areas.

Page 4 of 5

5. Work Experiences:

Position: Maintenance Engineer – STP Plant (KOC project) Company: AHL AL-KHALEEJ Gen. Cont. Co.

KDC Compound, Ahmadi, Kuwait

Date Employed: Oct 23, 2008 - Dec 15, 2016 – 8 years and 2 months Company Business: General Contractor /

Oil and Gas

Projects Completed:

- Pipe laying works for KDC Drill Rigs Sewage system –(KDC-KOC)

- Construction of Sewage Treatment Plant for KOC (KDC Rigs) Job Responsibilities:

Design, erection, operation and maintenance of STP Plant for KOC.

Supervise installation works of “Biokube Portable STP” on various Rig sites.

Direct supervision of pump and blower installation.

Work closely with the teams in executing the project package, mechanical and electrical works.

Prepare materials requisitions in advance to cope up with the delivery schedule and work program.

Conduct Preventive weekly and monthly maintenance of pumps and blowers for Biokube portable STP.

Report to Project Manager all status of the work, workers attitude, tools and materials required from time to time.

Record all weather data to monitor works affected by climate change.

Prepares incident reports happened at site and submit to PM with photos attached.

Daily submission of installed equipments, quantity of pipes, fittings and other scope of works.

6. Work Experiences:

Position: Maintenance Engineer

Company: Kuwait British Factory

Al Shuwaikh, Kuwait

Date Employed: May 7, 2006 to October 10, 2008 – 2 years and 5 months Job Responsibilities:

Responsible for the complete maintenance of Company factory facilities such as fire protection systems, HVAC, plumbing & drainage system, electrical supply and other electro mechanical improvement issues of the company.

Monitor maintenance schedules for air conditioning units especially on summer periods.

Test water supply on hydrant lines for leaks and dry run fire pumps once a month.

Check clogged pipelines, modify connections and replace damaged leaking fittings as

The approved recommended request.

Page 5 of 5

Prepare s standard facility maintenance chart protocol for equipment servicing as per the manufacturer’s recommendation to avoid unnecessary breakdowns.

Submit monthly report of parts and materials purchase done on each machine or equipment to monitor the maintenance expenses.

Coordinate with the delivery group in transferring machines outside workshop for some machine shop works and general fabrication.

Submit recommendation or suggestion with attached photos and records of equipment with poor efficiency and performance, for replacement or upgrading.

Conduct a general housekeeping of company materials, tools and equipment to keep it in a secured and safe areas.

7. Work Experiences:

Position: Mechanical Engineer

Company: Moldex Group of Companies

Moldex Building, Ligaya Street,

West Triangle, Quezon City, Philippines

Date Employed: July 2, 2005- March 30, 2006

Company Business: Moldex is a Realty and Housing Developer, Consulting and General Contractor also, Manufacturer and supplier of UPVC, PE, PVC and HDPE Pipes.

Job Responsibilities:

Interpret Piping Isometric Drawings for Sub Contractors, Suppliers and quantify the take off materials by weight and volume.

Re-Draw existing piping drawings for projects, using AutoCAD showing all the Elevations, joints, valves and fittings.

Evaluate piping network for HVAC systems, plumbing and drainage.

Re-draw existing Plans and Drawings for previous projects for Split AC and pipe specialties.