JG
JORDAN GILREATH
************@*****.*** 918-***-**** Wilburton, OK 74578
Basic mechanical abilities
Welding knowledge
Production background
Inventory monitoring
Mathematical skills
Hand and power tools
Skilled metal worker
Crane and hoist equipment operation
Critical thinking
Computer skills
Spirit AeroSystems Mcalester, OK
Detail Fab
01/2018 - 04/2020
Fabricated and altered parts with metal hammers, punches, drills and shears.
Verified product quality by checking products for accuracy and completing necessary adjustments.
Was trained to run the joogle machine its like a giant press that comes down and forms a joggle in the part your working on Theres alot of setup on every job number every part number uses a different type of dies and some metals have have to heat up more than others
Have to use blue prints to make sure to lay your first part out right then get a first part check
Spirit AeroSystems Mcalester, OK
Project Specialist
01/2018 - 04/2020
Monitored overall safety by regularly inspecting job sites and confirming observation of protocols and standards by workers. Answered questions from clients while conducting pre-closing walk-throughs.
Oversaw [Number] team, project milestone completion and quality of work performed.
Saved money by overseeing cost-effective material sourcing and effective work orders.
Made sure there wasnt any slip,trip or falls
Watched for pinch point and labeled if needed.
Made sure my team had all the tools they needed to do their jobs easier and faster and more efficient
Made our work area safer
Went and thru ideas to the higher ups in tulsa on ways to make our area more efficient like bring most of what we needed to our own cabinet in stead of having to walk all the way to the tool crib, less time going to look for your tools and more time in your area geĴing jobs out. Spirit AeroSystems Mcalester, OK
Deburr
Used power tools to grind, mostly aluminum parts.
Performed finishes by trimming and deburring to create smooth surfaces Summary
Skills
Experience
01/2018 - 04/2020 and joints of assembled parts.
Prepared metals for industrial processes by cleaning, degreasing and removing impurities from raw materials.
Worked closely with team members to deliver project requirements, develop solutions and meet deadlines.
Demonstrated leadership by making improvements to work processes and helping to train others.
Used angle grinders,barrel grinders and palm Sanders Had to break all sharp edges and get any flaws ground out before process.
Prepared all parts for paint
Choctaw Defense Mcalester, OK
Welder
03/2016 - 10/2017
Welded all the milatry trailers
Put all the pieces of metal in a big jig table that was all ready squared up so you just throw the right pieces in every spot then start tac welding it together, then make sure its still square before welded out Ran o.45 pulse wire or a Lincoln 220 mig welder.
Set up equipment and welded parts according to welding chart specifications and type.
Followed safety guidelines through proper machine guarding and lockout and tagout procedures.
Scraped off excess spaĴer using portable grinders and arc-cuĴing equipment.
Laid out, positioned, aligned and secured parts and assemblies with straightedges, squares and calipers.
Adjusted gas flow and pressure to create and maintain desired flames. Operated manual and semi-automatic welding equipment to fuse metal segments together.
Positioned and clamped workpieces together and properly assembled in jigs and fixtures.
Auto-turn manufacturing Broken Arrow,
OK
Head Welder
02/2013 - 04/2016
Followed safety guidelines through proper machine guarding and lockout and tagout procedures.
Scraped off excess spaĴer using portable grinders and arc-cuĴing equipment.
Used 0.35 mig for root and 0.45 pulse for fill and cap Used roll out jigs to weld 4,6 and 8" tees to the same size flanges Hired and test people for jobs and fired a couple too Starting out had to pass 100% x-rays but over time if you didnt bust any x-rays you would be dropped to 50% of your parts being tested Globle x-ray tested all our parts we welded
When slow in welding area ran manual mill and lay for the machine shop Set up and operated welding equipment to complete all welding projects on-time.
Improved project completion time by managing multiple tasks using forklifts and other heavy equipment.
Developed plans for each project from start to finish, cuĴing timelines down by 10% and providing exceptional services.
Hartshorne High School Hartshorne, OK
High School Diploma
Education and Training
05/2009