Mahesh kanna Madasamy, Construction Manager,
https://www.linkedin.com/in/mahesh-kanna-madasamy-0b103886
Cell: +91-784*******, ************@*******.***
SUMMARY
A self-motivated mechanical engineer with 11 years' experience in oil & gas
mid & downstream projects, I am adept in field management, engineering,
construction, quality assurance, and team collaboration. while my on-the-
job experience has afforded me a well-rounded skill set, including project
peer to peer communication protocols and first rated delivery &
commissioning abilities. Speed, cost and quality this is motto.
HIGHEST EDUCATIONAL QUALIFICATION
. Bachelor of Engineering major in Mechanical engineering (2007-2011)
Anna University Trichy, Tamil Nadu, India.
. Graduated from ST. Antony high school, Nagapattinam, India. 2007
CAREER EXPERIENCE
Company: Lohuon Al-Arabia, KSA (January 2019 - June 2022)
Role/Projects: Construction Manager, Oil & Gas Projects.
. Propane level imbalance between surge bullets, Construction of new
piping system including Civil, structure and instrument installation,
Wison/Saudi Aramco
. Installation of new Lube oil skid for crude shipper pump, Wison/Saudi
Aramco
. PP14, sales gas delivery system, SEPCO-III
Responsibilities
. Presented accurate B.O.Q price figure and aid successful project
awarding.
. Drafting & presented schedule, cost plan, project development plans to
client.
. Economize company's indirect project assets such as storage
fabrication/painting yard, test yard etc., and reserved millions to my
employer.
. Assisted project-specific methodology and field engineering red mark
approval
. Developing non-standard complicated exercise by right technique
methodology.
. Developed & proposed metallurgy wise acceptable In-service WPS/WPQR.
. Developed rigger level-1 critical lift plan for elevated structure &
piping section.
. Performed 90 tonnage heavy duty steel structure erection over live
plant facility.
. Represented weekly MOM with client to discuss contractual obligation &
progress.
. Developed on the spot engineering solution to client and provided
assistance during extended length of RTR tunneling carrier pipe
through extended steel casing pipe.
. Performed successful RTR mainline hydro-testing to ensure strength of
each joint inside the steel casing pipe as per project requirement.
. Pursued all possibilities to ensure all project materials and tools
are advancing on time.
. Arranged various project oriented obligatory institutional training
and certification program for field working personal.
Company: Arkad Engineering and Construction Company, KSA
Role/Projects: Project Engineer, Saudi Aramco Project.
. Fadhili Downstream gas program Master gas Phase-II, 33 KMs of 56"
Mainline construction including Inservice high pressure Hot tapping,
. Onshore potential Maintenance program, 16 water well lateral piping
replacement including 48" and 30" heavy duty Sand trap installation.
Responsibilities
. Providing technical leadership to site/engineering team members
. Maintained all engineering red line drawings, project schedule, and
ensured optimal quality and cost effectiveness.
. Participated in numerous technical meetings with EPC contractor,
client, and engineering consultant regarding basic and detailed
documents, model reviews and safety standards.
. Demonstrated awareness of safety in the construction and operation of
pipelines.
. Oversaw material inspection, fabrication, NDT experiments,
external/internal coating, and final receiving inspection.
. Familiar with Saudi Aramco engineering standards, ASME and API
Standards
. Performing large string mainline lowering, Pre-walk through Invitation
to Client different division representative for project Mechanical
completion certificate at the 75% completion of scope of work.
. Pre-commissioning, Hydro testing and star-up of mainline system
. Obtain Proponent signature over approved project packages by closing
final punch lists in Aramco MPCS system through Project management
team.
Special Achievement:
. Performed In-service welding over 40 inches. high pressure Mainline
Hot tapping by T.D Williamson. KBG-1 & 2, Northern area pipeline
division, Saudi Aramco
. Obtained certification of appreciation for 3million safe man hours and
project accomplishment by Saudi Aramco representative.
Company: Aarvi Encon India PVT Ltd. (2015)
Role/Project: Inspection Engineer, Shutdown project.
. Turnaround and Shutdown Gas/oil Processing facilities
Client:
. Hindustan Petroleum corporation Limited, Visakhapatnam, India
. Chennai Petroleum Corporation Limited, Chennai, India
. Reliance Industries limited, Jamnagar, India.
Responsibilities:
. Supervision, monitoring and coordinating of all shutdown activities
which include maintenance, inspection, and testing of refinery unit.
. Over saw Extraction of U-Tube and straight tube bundles of exchangers
and Inspection for corrosion and witness NDE examination where
required.
. Visual Inspection of high-pressure shell and tube heat exchanger
involving cleaning of fouled tubes with the help of high-pressure
pumps/ water jetting.
. Hydro testing for high pressure vessels and shell and tube heat
Exchangers.
. Installation, Commissioning, and maintenance of various mechanical
equipment like Blowers, Furnace & Pumps
. Column tray replacement, surface induced crack weld repair instructor.
. Maintain and recording of facilities inspection history for different
shift team.
Company: A.R Industrial Engineering (P) Limited, India. (2014 - 2015)
Role/Project: Inspection Engineer, Above ground tank construction.
. Ethylene Cryogenic Storage package (API 620th /625) Tank construction
(Reliance industries/Larsen and tubro Hydrocarbon limited)
Responsibilities:
. Welding instructor, SMAW, TIG and MIG process for wide variety of
materials.
. Fabrication and erection of annular plate and Bottom plate
. Oversaw the installation of suspended deck, roof nozzles, purlin
structures and vapor barrier plates.
. Performed visual/NDE experiments on wide range of structural members
like dome roof, vapour barrier bottom and side wall, internal/external
compression ring, monorail, and cooling/spray piping system.
. Fit-up inspection of weld joints. Preparation of Daily and Weekly
Reports.
Achievements:
. Air lifting of whole dome roof structures successfully includes
Suspended deck.
Company: Mynor Enterprises (P) Limited, Tamil Nadu, India. (2011 - 2013)
Role: Maintenance/Quality Engineer, ONGC, India.
1. Onshore pipeline projects (4" Mainline, KMP #44, ONGC India)
2. 18" Piping, PPE gas turbine power plant, GAIL, India.
3. Repair and Maintenance (Process plant/shutdown) - (ONGC, India)
4. Onshore gas pipeline construction and Terminal piping (SHUT DOWN)
Responsibility:
. Performed Safe lowering of 3km continuous cross country pipeline
string into trench.
. Coordinate with inspection department for Hydro testing and mainline
construction.
. Pre-Commissioning, Pigging, Chemical cleaning, Nitrogen purge and
System layup
. Supporting commissioning/start-up team
. Performed HSE training at work.
. Interact with Plant in charge/regional engineer, Troubleshoot.
arrest leakage by Clamping, sleeve welding, replacement in Plant
maintenance
. Retrieve job completion certification as per contract.
PERSONAL SKILLS
. Ability to work on your own without being constantly supervised.
. Help to keep other's spirits up and encourage them to do their
best.
. Strong work ethics and Multitasking
. Expert in Microsoft Paint (Field engineering & designing)
. Certified welding inspector (AWS-CWI) and RTFI inspector
PERSONAL PROFILE
Date of Birth : 24.04.1990
Last Name : Madasamy
Nationality : Indian
Language Known : English, Tamil, and Hindi
Current location : Tenkasi, Tamil Nadu
Passport No : V0653603
Position applied for : AET-PE
Passport Expiry : 16/09/2031
Notice period : immediate
DECLARATION
I hereby declare that the details furnished above are true and correct
to the best of my knowledge.
Date: 01/10/2022 Yours faithfully,
Place: Tenkasi, Tamil Nadu
(Mahesh kanna Madasamy)