JUDY B. CARBONEL
C I V I L E N G I N E E R
P R O F I L E
I am a Civil Engineer having more than 20 years vast diversified civil engineering experiences in civil structures, site management, and construction supervision. I’ve been working in Dubai for 18 years now and having significant projects handled like Dubai Metro, Hassyan Coal Power Plant, villas and buildings.
I am a Dubai Municipality license engineer in the categories of G+Unlimited floor, G+4 floor, G+1 floor and Building Maintenance.
C O N T A C T
*************@*****.***
Silicon Oasis, Dubai UAE
E X P E R I E N C E S
PROJECT MANAGER
ISL Smart Renovation – April – Sept 2022
Demolition and refurbishing of villas and apartments. Dubai, UAE
CIVIL SITE INSPECTOR
Artline Eng’g Consultants – April 2021 – Dec. 2022 Dubai, UAE
S K I L L S
Project Management
Construction Supervision
Project Quality Assurance
Site Inspection
Structural Steel Fabrication
E D U C A T I O N
Bachelor of Science in Civil Engineering
PROJECTS HANDLED:
G+3P+12Typ+Roof – Ajman
B+G+6Typ+Roof - Ajman
B+G+7Typ+Roof - Muraqabat Dubai
G+1+Roof – Muhaisnah Dubai
Majalis Project – Khawaneej
S E N I O R C I V I L E N G I N E E R
China State Const.& Engg.Corp - Jun 2017-Sept 2020 Dubai, UAE
P R O J E C T S H A N D L E D
Excavation & Installation of 12mx4m dia GRP pipes from pump station to boilers.
Excavation and civil works at MPH, Chemical
Treatments, Boilers and at 150m high Chimney.
P R O J E C T E N G I N E E R
Action International Services - Dec 2016-June 2017 Dubai, UAE
Dewatering System
P R O J E C T S H A N D L E D
Deira Water Front Plot 3 and Plot 13
Dubai Metro Expolink Extension
P R O J E C T E N G I N E E R
Oufuq Al Emarate Bldg.Const.-Mar 2016– Sept 2016
Dubai, UAE
P R O J E C T H A N D L E D
G+M Ground Industrial Bldg, G+4 Labor Camp 2 unit
P R O J E C T E N G I N E E R
Preferred Specialist Services LLC
Mazrui Grp-Jan 2010-March 2016
6Dubai, UAE
P R O J E C T S H A N D L E D
G+1 Villas – Al Barsha
G+1 Villas – Al Khawaneej
S I T E E N G I N E E R
Stone Line Cladding & Contracting
Sept 2004 – July 2007
Dubai, UAE
P R O J E C T S H A N D L E D
G+1 Villas – Al Khawaneej
G+1 Villa - Ajman
T E C H N I C A L F I E L D E N G I N E E R
Hilti Philippines Inc.
Sept 2000 - October 2003
Makati, Philippines
T E C H N I C A L F I E L D E N G I N E E R
Site Demonstration and Product Awareness
S E N I O R S I T E E N G I N E E R / C H I E F E N G I N E E R Obayashi Corporation JV – July 2007- Sept 2009
Dubai, UAE
P R O J E C T S H A N D L E D
Financial Station
Burj Khalifa Station
Mall of Emirates Station
S I T E E N G I N E E R
B&M Contracting
Oct. 2003 - July 2004
Doha, Qatar
P R O J E C T S H A N D L E D
Villas
Pavements
Drainages
C I V I L E N G I N E E R
Marsar Mktg & Industrial Corp.
June1994 - June 2000
Quezon City, Philippines
P R O J E C T H A N D L E D
Structural Fabrication and Erection
D U T I E S A N D R E S P O N S I B I L I T I E S : As Site Engineer /Sr. Site Engineer
Daily ensured that equipment, manpower, labor and materials are available on site to carry out the work as per planned. Ensured with subcontractor the daily plans and work schedules are being followed and work execution is as per approved drawings and standard specifications.
Coordinated day to day activities with site engineers, monitored site accomplishment and proper work execution, ensuring high level quality of construction work and construction method of statements is being followed. Attended site inspection with Consultants and Dubai municipality engineer. Prepared weekly and monthly site accomplishment report. Collaborated with the construction team to refrain any hazard associated with the work that may adversely affects the safety or health of the workers.
Duly implement safety and housekeeping on site.
Assists in preparation of BOQ for tendering.
As Civil Site Inspector
Attended site inspections and material inspections for civil structural works as per request by contractors Monitored activities on site ensuring the progress of work has been followed as per baseline. Reviewed Bill of Quantities submitted for monthly billing against site accomplishment and prepare Payment certificate. Reviewed and approved shop drawing submittals and materials submittals. Inspected and approved mock-ups on site prior to installation. Monitored and ensured that the housekeeping and safety on site is regularly observed and implemented. All materials used on site are thoroughly monitored as per approved, and ensured installations are done as per approved drawings and standards.
Conducted regular weekly meetings on site.