Resume:

Marian Bolinu

Career Summary

• A highly skilled Electromechanical Engineer with over 19+ years’ experience like an Quantity Survey, Project Engineer, Project Supervisor, Lead Engineer, Site Manager and Project Manager in Oil & Gas, Mining and Infrastructure projects

Personal Data

Date of birth: 07.09.1977

Nationality: Romanian

Status: Married

Address: Dealul cu Piatra no. 1, bl. 29, sc. C, flat no. 50, 2nd floor, Ploiesti, Prahova

Phone Number +407********;

E-mail address: adrzhq@r.postjobfree.com

Skype: marian. bolinu

Gender: Male

Education and Qualification

Specialty: Mechanical and Electrical Engineering

Date: 1997-2002 “Petroleum and Gas University of Ploiesti”

City Ploiesti, Country ROMANIA

Specialty: Military High School

Date: 1992-1996 “Constantin Brancoveanu” HIGH SCOOL

City Ploiesti, Country ROMANIA

References:

Vincenzo Romano- Amec Foster Wheeler-Wood Site Manager- Phone number: +39.340.196.22.44

Andrea Conti- Amec Foster Wheeler-Quantity Surveyor-Phone number: +39.328.415.03.74

Work Experience

Date: May 2021-Present

Company: Maire Tecnimont

Project: HAOR-Baku, Azerbaijan

Position: Subcontract Administration Engineer

Date: November 2019-April2021

Company: ThyssenKrupp

Project: MOL Polyol project- Hungary

Position: Mechanical, E&I, Civil Quantity Surveyor

Duties:

- Verification of Monthly Progress Certificates submitted by Contractor

- Evaluation and verification of extra works requested by Project

-Attend to the weekly coordination meeting with Contractor

-Prepare in collaboration with the Subcontract Administrator the draft of Contract amendments due to extra works, back charges and Contractor claims

- Check by the Manpower presence report the quantity of manpower presence at site especially for the Direct Portion of the Contracts, organize random site verifications of work progress

- Check in detailed accounting submitted by Contractors for the unit prices portion in particular verify the quantities to be calculated in accordance with the drawings issued for construction and with the method of Measurement. Verify all arithmetic calculations and application of unit prices (to be in accordance with contract price list and Contracts requirements), correctness of all calculation.

Date: December 2017-October 2019

Company: Amec Foster Wheeler-Wood

Project: Polyfuel project, Petrom OMV- refinery, Petrobrazi - Romania

Position: Mechanical, E&I, Civil Quantity Surveyor/Subcontract Administrator

Duties:

- Responsible for managing all project costs from pitch to completion.

- Undertaking costs analysis, attending meetings and liaising with stakeholders on commercial matters.

- Monitoring the cost of site resources.

- Inspecting and then valuing completed work.

- Produce monthly cost & value reports, quarterly reports & cash flow information.

- Preparing tender and contract documents.

- Developing strong relationships with the clients and subcontractors.

- Providing advice and guidance to staff in the preparation and presentation of works proposals, reviews and updates

- Responsibility of BOQ, progressive payments certificate, final accounting and mechanical completion certificates;

- Preparing start of work certificates, mechanical completion certificates and all other documents necessary for project milestones

Date: July 2017-November 2017

Company: Area Impianti

Project: ECS (Glass factory project Egypt)

Position: E&I Manager

Duties:

- Responsible for all E&I activities on site.

- Monitoring the cost of site resources.

- Provide Electrical Input to detailed design / construction contractor if required

- Modify and approve all electrical drawings

- Approve all materials from technical point of view

- Supervising and clearing Commissioning related punch lists and outstanding works

- Conducting field acceptance test and collation of related documentation

- Assist with developing HSE plans that comply with Company policies and procedures

Date: December 2014-April 2017

Company: Amec Foster Wheeler

Project: Optara Project Lot 3A, TOTAL refinery, Antwerp- Belgium

Position: Mechanical, E&I, Civil Quantity Surveyor/Subcontract Administrator

Duties:

- Responsibility of BOQ, progressive payments certificate, final accounting and mechanical completion certificates;

- Preparing start of work certificates, mechanical completion certificates and all other documents necessary for project milestones- Responsible for managing all project costs from pitch to completion.

- Undertaking costs analysis, attending meetings and liaising with stakeholders on commercial matters.

- Monitoring the cost of site resources.

- Inspecting and then valuing completed work.

- Produce monthly cost & value reports, quarterly reports & cash flow information.

- Preparing tender and contract documents.

- Developing strong relationships with the clients and subcontractors.

- Providing advice and guidance to staff in the preparation and presentation of works proposals, reviews and updates.

Date: October 2013-December 2014

Company: Blue Projects

Project: Pringles Carolus Project, KELLOGG’S, Kutno - Poland

Position: Construction Superintendent

Duties:

- Coordinates all electrical works handled by aprox.40 contractors and ensures that quality standards set by the company are adhered to, and that work is conducted safely and efficiently.

- In charge with maintenance, repairing and spare parts inventory for electrical systems

- Supervise and manage vendor engineering and equipment deliverable to ensure compliance with project standards and specifications

- Planning for resources and manpower for planned shutdown of the plant and execution including start-up

- Ensure that all contractors have power and lights in their office containers, storage containers/areas and working areas.

- Provide Electrical Input to detailed design / construction contractor if required

- Assist with the operations/maintenance team to optimize commissioning and acceptance of facilities from the project team.

- Provide onsite leadership in ensuring safe execution of commissioning scope of work

- Maintain documentation: as build drawings, vendor manuals, etc. in respect of disciplines

- Involved in all phases of the project (including feasibility phase) and ensuring that IEE regulation standard is strictly adhered to.

- Supervising and clearing Commissioning related punch lists and outstanding works

- Attend site and progress meetings / site inspections and handover boards.

- Advise and liaise with project client, stakeholder and end user. Resolve site issues and conflicts.

- Take care and have an updated list with electrical spare parts and tools; monitoring material deliveries and anticipate requirements.

Date: June 2012 - October2013

Company: RINA – ENI CONGO

Project: Independent Power Plant, Mboundi Gas Vaporization, Mboundi field Development, Djeno Re-powering, Offshore new projects

Position: QA/QC E&I

Duties:

- Member of the quality control and quality assurance team based in Pointe Noire. The aim of this team is supervising all the activities carried out by the contractors to assure the quality of the projects in accordance to project specification, ENI company standards and international standards.

- Ensure HSE systems are in place before starting a job, ensure proper use of tools and PPE, conduct regular site visits, ensure competence of workers and awareness of relevant operational / HSE procedures (e.g. road safety rules, waste management, etc), advise workers on potential hazards, check safety equipment, notify management of unsafe working conditions, report and investigate HSE incidents, participate in facility inspections and HSE meetings. Develop, if required, additional HSE strategies.

- Provide HSE compliance onshore and offshore and perform regular HSE audits

- QA/QC documentation and review Contractor construction electrical procedures

- Support and interface with the operations group during initial start-up.

- Ensure all worksites are HSE compliant with Company policies and safety standards

- Carry out inspections on site on the daily basis reporting to the QAQC manager

- Control the activities of specialist vendor personnel as required

- Assist with developing HSE plans that comply with Company policies and procedures

Date: October 2011 – May 2012

Company: London Mining

Project: Marampa Iron Ore Mine-Phase 2(Sierra Leone).

Position: Lead Infrastructure Engineer

Duties:

- Supervise infrastructure team (apox.300 people) to work in conformity with approve for construction drawings

- QA/QC documentation and review Contractor construction electrical procedures

- Assist in identification of equipment spares.

- Provide onsite leadership in ensuring safe execution of commissioning scope of work

- Maintain documentation: as build drawings, vendor manuals, etc in respect of discipline.

- Support and interface with the operations group during initial start-up.

- Supervising and clearing Commissioning related punch lists and outstanding works

- Submit required reports in a timely manner

- Prepare commissioning and start-up plan for electrical infrastructure works

- Control the activities of specialist vendor personnel as required.

- Check and coordinate all electrical works for Infrastructure Projects in Marampa

- Conducting field acceptance test and collation of related documentation

- Modify and approve all electrical drawings for buildings, warehouses, workshops etc

-Together with Infrastructure Project Manager take care of the time schedule and budget of the Infrastructure Projects

Date: May 2011 – August 2011

Company: 4 Atech (CIM Equipment)

Project: Trucks Loading Park revamping project –Morocco (SAMIR refinery)

Position: Project Manager

Duties

- To know and understand our client procedures and standards

- Take care of the time schedule and budget of the project

- Responsible for achieving the objectives of each project

- Coordinate all the factors involved in the project

- Determining the necessary resources required for specific works

- Responsible for achieving objectives in deadlines

- Taking actions to deal with unexpected situations

- Prepare Vendor Document List

- Assure quality assurance during the project

- To read and understand the projects (work packs), especially E & I drawings.

- To collaborate with client regarding all aspects of company works (field work or paper work).

- To conform himself to all company requirements, especially regarding safety procedures.

-Take care to have latest drawing or P&ID

Date: October 2002 – May 2007; July 2008-November 2010

Company: PETROM OMV–Project Execution Department

Project: Revamping railway stations for oil products, Revamping horizontal tanks T554 A, B, C, Tank Farm Optimization, Construction of new tank R7 (40000m3),Revamping Catalyst Cracking-revamping Control Room and more than 80% from field equipment

Position: Site Manager

Duties

-Good experience reading P&I diagrams, instrument documentation and other wiring diagrams

- To inspect in field the works performed by company E&I Construction Team (or subcontractors): to verify what works has been done and to check the quality of this works (to check all the details, if they comply with our client requirements).

- Prepare Punch Lists and submit to construction team

- Together with project team approve and make internal inspections, preparation and performing inspection, preparation and approval of acts and reports

- Electrical supervision of major shut-down works

- Verify Installation of electrical and instrumentation cables in field auxiliary rooms

- Participate at commissioning of all electrical systems and prepare final electrical hand-over

- Organize receptions and put in function all investment objectives and projects developed by the Investment Department

- Create, verify and maintain of fixed assets documents involved in all objectives and projects developed by the Investment Department

- Create Purchase Requisition in SAP for Goods and Services

- Create and verify Service Entry sheets in SAP

- Create and verify Goods Reception Notes and other documents related to goods movement (in SAP) between two or more parallel objectives and projects developed by the Investment Department

- Maintaining a close liaison with other discipline supervisors working in the area in order to coordinate all types of works in the area.

- Monitoring daily progress within the area of assignment and keeping records of quantities installed.

- Inspecting the quality of work on a day-to-day basis and ensuring that drawing data and specifications are adhered to.

-Ensure materials are at work location and/or in transit

-Ensure scaffold requests are being addressed

-Coordinate work safely and methodically to maximize productivity

-To check all workers, have assignments and working safely

-Monitoring work force and anticipate potential security issues-know what is going on in area and take

Date: May 2007 – July 2008

Company: PETROM OMV–Project Execution Department

Project: Online analyzers (Siemens Gas Chromatographs, Bartek Benke Distillations Analyzers) in Isomerization and AVD Units

Position: Project Manager

Duties

-Coordinate work safely and methodically to maximize productivity

- Take care of the time schedule and budget of the project

- Responsible for achieving the objectives of the project in deadlines

- Coordination of the factors involved in the project

- Determining the necessary resources required for specific work

- Taking actions to deal with unexpected situations

- Preparing the reports and schedule of work, together with project team

- Assure all the support for the work team

- Increasing the operational time

- Achieving results under restrictive and stressful conditions

- Gaining superiors trust by being loyal towards the project objectives

This project was like a revamping for both units because we’ve make tie-ins, mounted online analyzers for oil products and all the dates arrived in Central Control Room, in DCS.

Languages English: very good reading, writing and speaking

French: good reading and speaking

Italian: basic

Courses and Certifications:

Specialty: Project Management

Date: 2007 Project Management Coursed

City Ploiesti, Country ROMANIA

Specialty: Project Management

Date: 2006 Developing abilities to negotiate contracts

City Ploiesti, Country ROMANIA

Specialty: Ex zones

Date: 2005 ex certificate for explosion zones

City Ploiesti, Country ROMANIA

Specialty: Basic training on Hydrogen Sulphide H2S

Date: 2013-Maritime Training Center-Pointe Noire (Congo)

Specialty: Elementary First Aid-Offshore

Date: 2013-Maritime Training Center-Pointe Noire (Congo)

Specialty: Basic Fire Fighting

Date: 2013-Maritime Training Center-Pointe Noire (Congo)

Specialty: Personal Survival Techniques-Offshore

Date: 2013-Maritime Training Center-Pointe Noire (Congo)

Specialty: Induction HSE-Offshore

Date: 2013-Maritime Training Center-Pointe Noire (Congo)

Specialty: VCA Certificate (Basic Elements of Safety SSC)

Date: 2015-Antwerpen (Belgium)



Contact this candidate