Cell: 928-***-****
Email: ***************@*******.***
Las Vegas, Nevada
PROFILE
Seasoned professional, who is loyal,
honest, passionate and is a life learner
with integrity.
Superintendent and project manager
with 20+ years of experience with:
• Outstanding project completion rate
• Excellent client relationships
• Effective conflict resolution and
team building
• Superior coordination and
negotiation skills
• Contract preparation and
negotiation
• Sub-contracting invoices auditing
and approval
• Coordinating sub-trade efforts
• Implementing quality control and
safety protocols s
• Problem solving construction
challenges
• Administering project-level
operational budgets
• Efficiently consolidating
administration routines
• Keeping all best management
practices (BMPs) in place
• Teaching job specific safety
protocols
AREAS OF EXPERTISE
• Structural concrete
• Structural framing
• Seismic retrofit renovations
• Green projects
• Earth work: grading / all site, dry and
wet utilities
• Post tension parking: multilevel
garages
• Storm Water Pollution Prevention Plan
(SWPPP) / Erosion control
• Personal Protective Equipment (PPE)
Safety Management (OSHA 30 / 300)
• Construction Staging Areas / Layout
Mike N. Zetlmaier
GROUP WORK EXPERIENCE
Pilot Flying J Travel Centers 2019-Present
Construction Manager (CM)
Job Profile:
• Truck and Auto Fueling Station. Ground up construction and all site work utilities-landscaping
• Off-site 12” sewer line, 2 miles on main road
• Fontana 9 Acre 30,000 SF Building and site $8.2M
• Frazier Park 15 Acre 30,000 SF building $24M
Responsibilities involve, (but not limited to):
Estimating award contracts, write complete scope of work for all subcontractors, work closely with Architect, Civil Engineer, City and Deputy Inspectors, set all SWPPP, BMPS and inspect weekly, create schedules and critical means, implement safety program and meetings.
Global Premier Development 2018-2019
Job Cost $15.2M
Oxnard, CA
General Superintendent
Job Profile:
Assistant living 28-unit, story wood framed building, Spanish tile smooth stucco burned finish exterior with tile roofs. All site work Utility’s-landscaping
Responsibilities involve (not limited to):
Facilitation skills to include coordination of efforts of sub-trades, contract preparation and negotiation, conflict resolution, team building, client relations / Auditing and approval of sub- contracting invoices, implementing quality control and safety protocols, administering project-level operation budgets, keeping all BMPs in place and teaching job specific safety program.
Johnson and Jennings Construction 2017-2018
Job Cost: $10.2M
San Diego, CA
Senior Superintendent
Job Profile:
Hillcrest Family Medical Center 5 story Interior/Exterior remodel while building stayed open from 8AM-8PM. Remodel consisted of 2 Labs, 4 Medical offices, 2 Surgery and recover areas, 2 new elevators installed while under construction, 1 chiropractic and therapy area.
SPECIALIZED TRAINING
• Licensed crane operator
• SWPPP Certified – Wal-Mart
• Confined Spaces Certified
• Construction Management Certified
Wal-Mart
• B.L.S. Certified
• A.E.D. Certified
• OSHA 30 HR
• AQMD Certified
• IBC F-12 Contractors Course
• ICC Concrete Certified
• Computer Knowledge: Microsoft
Project/Word/Excel/Sure
Track/Bluebeam/cad
REFERENCES
Proudly provided upon request
Sun Group Development 2013-2016
Job Costs: $8.5 and $2.2M
Superintendent and Assistant Project Manager
Job Profiles:
• Ismael Villages Parks- 12,000 SF building Ground Up, 2 soccer fields 1 Olympic size pool and site work
• Public Works San Canyon Parks. New ground up 2 story steel building and site water features for intermediate children after school programs
Austin Jones Construction 2009-2013
Superintendent
Job Profiles:
• Downey Walmart Store
• Torrance Walmart Supercenter
• Honolulu Walmart Remodel
• Lake Forest Walmart Remodel (Learning Center)
Woodburn Construction 2004-2008
Superintendent
Job Profiles:
• Agribusiness Medical Center. 1 Story 4 buildings, approx. 3,000 SF ground up CMU stucco finishes all site work. Job Cost $4.8M
• LDS Stake House Ground Up 11-acre site all onsite/offsite retention ponds, all utilities 11,000 SF building wood framed with LVL’S 30’-0 Rake walls framed on slab raised with cranes. Job price $9.2M
Dolan Construction 1998-2003
Superintendent
Job Profile:
Retail Supermarkets, Car Dealerships, Westfield Malls, Tilt ups, Hotels
Douglas E Barnhart
Framing Forman
Job Profile:
All layout, Framing, setting all penalized roof structural glulams, microlams forming, finishing concrete.
PROJECTS LIST
• Piper Pre-School
• Regency Palms Assisted Living Facility (California): Assumed from prior Superintendent
• Avalon Bay Fitness Center & 380-unit Apartment complex
(California): Assumed from prior Superintendent
• Hill Crest Family Medical Center, $33M
• LBUSD: School Remodels (Lakewood, CA)
• Old Navy (Washington)
• Ecco Shoe Store (California)
• Express (California)
• Smart & Final (California)
• Ismael Villages (California) / Public Works: Assumed from prior Superintendent
• San Angelo Park (California) / Public Works, $10.5M
• Wal-Mart Super Center Store (Hawaii): Assumed from prior Superintendent
• Wal-Mart Neighborhood Market (Hawthorn, CA), $8.6M
• Wal-Mart Super Center Store (California), $22.5M
• Cascade Plaza Children’s Hospital (Arizona), $10.5M
• Serko Japan (Washington), $500,000
• Home Furnishings (Arizona), $4.3M
• Robinson’s-May (California) Downey, $24M
• Macy’s (California) Glendale Arboretum
• Tustin Vons Grocery Story (California) Remodel
• Lake Isabella Vons Grocery Store (California) Remodel
• Stater Brother’s Grocery Store (California) Remodel
• Styles for Less Retail Store (California) Remodel
• La Palma Restaurant (California): Assumed from prior Superintendent / Remodel
• Valley Dodge Dealership (California)
• Staples Office Supply Retail Store (California)
• Best Western (Oregon) Asst. Super Remodel
• Temecula High School (California)/ On site forming, panelized roof structure
• Mission Viejo Elementary (California) / Concrete framing, roof framing, posttension slab and footings)
Ground up projects
• L.D.S. Stake Center (California), $10.6M
• Washington Federal Savings Bank (Arizona), $1.5M
• L.D.S. Church (Oregon), $8.6M
• Floor & Décor (Arizona), $4.2M
• Agribusiness Center Medical Offices (Arizona), $8M
• Quik Trip Fueling Station (Arizona), $4.4M
• Sportsman Fine Wines Restaurant (Arizona), $1.2M
• Bank One (Arizona), $1.4M
• Wells Fargo Bank / Party City (California), $2.3M
• Chevron Fueling Station (California), $3.8M
• Carwood Shopping Center/ Buildings involved: Vons Grocery Store, Vons Gas Station, Three ten thousand square foot pad buildings, $14.8M
• Hyundai/Toyota Dealership (California), $8.9M
• Lake Parris high School (Assistant)
• Temecula Elementary (Assistant)