Post Job Free

Resume

Sign in

Field Operator Process Technician

Location:
Islamabad, Islamabad Capital Territory, Pakistan
Salary:
2500 usd
Posted:
August 02, 2022

Contact this candidate

Resume:

ATTA ULLAH

EDUCATIONAL BACKGROUND:

B. Tech (Chemical) 2015

D.A.E (Chemical) 2012

SSC (Matric) 2005

COMPUTER SKILLS.M.S. Words, M.S. Excel, SAP, Internet surfing etc.

WORK EXPERIENCE: Total 8.0 years in Oil & Gas Production and exploration, Petroleum Processing.

One year Trainee Program at NFC IET Multan (From 2012 to 2013)

Four year as a Field Operator at Byco Oil Pakistan Limited – ORC – II (From March 2012 to December 2016)

PRESSON DESCON INTERNATIONAL (PVT) LTD.

Presson Descon International (PVT) LTD. (PDIL) is an integrated engineering procurement, construction and commissioning (EPCC) company. Providing seamless services for supply of production & processing facilities.

MAJOR PROJECTS

1. PAKISTAN Petroleum limited: (24th December 2016 to 2019)

Presently I am worked with Pakistan leading company in oil and gas sector PAKISTAN PETROLIUM LIMITED. Professional carrier starts in PPL on new 50MMSCFD plant Designed by EXTERRAN in GAMBAT SOUTH Block Joint venturing with ASIA RESOURCES OIL Limited. Worked as Process Technician/Board man, DCS ABB. I have also involved in commissioning and pre-commissioning activities and master startup of the Plant.

• DCS SYSTEM:

The DCS is by ABB and commissioned by Intech engineering.

• WELL HEAD:

• Well testing

• Wellhead gas compression system having 2 large reciprocating compressors.

• Well head Monitoring & control trough control panel system

• ESD panel calibration and operation

• Chokes replacement and change over

• Corrosion Inhibitor & Methanol Injection system

• Casing there sizing and there running procedures

• Oil and water base mud and their properties

• Gas gathering system:

Feed from different wells is collected and routed to 3-phase separators where gas, liquid and water are separated on the basis of specific gravity

• Gas sweetening and Amine re-generation unit:

We have sour gas having 25% CO2 in the Natural gas, we remove it through the UCARSOL 50% solution, our re-generation system having two trains with one contactor, also have 2 anti-foaming skids on it.

• Condensate stabilization unit CSU:

Stabilization of condensate for removing the lighter gases from condensate using rashing type packed column and having a hot oil bottom feed re-boiler.

• MEG/TEG Regeneration Unit:

Mono Ethylene Glycol/Tri Ethylene glycol injected in gas refrigeration circuit as de hydrator and Anti-Freezing Agent

• HCDP UNIT:

HCDP unit use for the controlling of dew point from the residue gas, using the propane chiller and JT-Effect system on it, having the HCDP analyzer and moisture analyzer on the skid.

• Propane refrigeration System.

Propane is used as a refrigerant for the recovery of LPG and other heavy hydrocarbon, also the systems for make up to refrigeration loop. Also have three screw compressors for refrigeration system.

• LPG Unit:

Recovered the LPG from the gas through refrigeration propane system up to 20MTPD.

• Gas Compression:

GAS from the De-Ethanizer o/H gas compressor is compress through reciprocating compressor to compress the gas in gas network.

• SCADA System:

Well head system controlling through SCADA system to shut down any well from CCR.

• Online Moisture& GC Analyzer

On line GC is used to analyze sale gas composition and moisture analyzer for analyzing the water content in sale gas in CCR.

• Sale gas compressor and Metering skid:

For maximum flowrate and pressure installed the sale gas compressor which is centrifugal compressor single stage by SUNDYNE Industries, and having the sale gas metering skid which have different analyzers (HCDP, MOISTURE, H2S, CO2) by EMMERSONS.

• Utilities:

Having the Instrument air package and N2 generation package, Demine/RO water plant, HP and LP Flare system, Acid gas incinator package, Hot oil system, water chilling package, power generation package by 9.9MW, Fire water and fire engines system.

2. ADHI LPG & NGL RECOVERY (PLANT III) CHAKWAL PAKISTAN

An EPCC project for Pakistan Petroleum Limited with design capacity of 30 MMSCFD natural gas Hydrocarbon Dew point control facilities to produce 164 Mtons /day LPG, Stabilization of 5330 BPD Hydrocarbon Condensate Adhi LPG & NGL Recovery Plant III have following major process units.

• Hot Oil System

• Waste Heat Recovery Unit

• Gas Turbines

• Fire Water System

• Nitrogen Generation System

• Propane Refrigeration Unit

• Molecular Sleeve Dehydration Unit

• Turbo Expander / Compressor Unit

• LPG Extraction Unit

• Condensate Stabilization Unit

• Associated Gas Compressor

• LPG Metering System

• Sales Gas Metering System

3. PAPCO WOTS – III, PARCO Refinery, Qasba Gujrat, Mehmoodkot, Pakistan

An EPCC project for Pak-Arab Pipeline Company (PARCO) with design capacity of 3000 Barrel Transmix Processing Facility for the separation of Motor Gasoline (MOGAS) and High Speed Diesel (HSD). WOTS – III has following major process units.

(From 10th March 2019 to continue)

• Dual Fired Furnace

• Fractionation Column

• Fire Water System

• R-134 Refrigeration Unit

• Nitrogen System

• Loading & Gauging System

• Pipeline Pumping Station

• Fogging System

• Foam System

• IFR Tanks

OVERALL OPERATIONAL OBJECTIVES & RESPONSIBILITIES:

• To provide suggestions for better operation of the plant with optimum output.

• High focus in work management processes including permit to work, equipment isolations, temporary control system defeats, etc.

• High focus on process operations optimization and efficiencies including minimizing all flaring

• Monitoring & logging the parameters.

• To handle plant emergencies through DCS.

• Suggest the innovative ideas for alteration / modification in plant.

• Monitoring of all shift’s operational activities.

• To read and well knowledge about PFD’s and P&ID’s.

• To take part in plant shut down and maintenance activities as well as Annual turn around.

• Study equipment and other failures and advise remedial action.

• Prepare for emergency handling and also a member of auxiliary firefighting team.

• Safely handing and taking over of equipment’s for maintenance job.

To inform all pending/in progress jobs to next shift.

HEALTH, SAFETY & ENVIRONMENT RESPONSIBILITIES:

• Safety captain of department emergency response team.

• To implement the SOPs regarding storage, transportation and disposal of waste material pertaining to a better and clean environment.

• To implement emergency and evacuation procedures to minimize the chances of accidents.

• A high level of safety awareness pertaining to safety trainings and safety talks.

• To persist and promote the culture of Personal Protective Equipment’s.

• To promote the conviction that “All accidents can be avoided”.

PROFESSIONAL COURCESS AND SAFETY TRAINING.

• IOSH Certified

• Production operation and maintenance management

• Osha management course/construction

• Ms-Excel intermediate and advance

• Fire fighting

• PTW (Permit to work)

• Problem solving and decision making

• MSDS (Material Safety Data Sheet)

• PPEs (Personal protective equipment’s)

• Fire detection, prevention and control system

• Using of breathing apparatus (SCABA)

• Job Safety Analysis

• Emergency Response Plan

• First Aid

• Environmental Control

PERSONAL INFORMATION:

Father’s Name

Nazir Muhammad

Date of Birth

04th-May-1989

N.I.C No.

36302-8948699-7

Religion

Islam

Marital Status

Married

Passport No:

Ak-1496992 & 2021



Contact this candidate