CURRICULUM VITAE
Amar Bhaskar Adhav. JN-*, Building No-5, Room No-3, Suyog app.
Sector No-9, Vashi, NaviMumbai, Cell no - 865-***-****
Email ID: *********.**********@*****.*** ****.*********@**********.***
*Post Applied – Document Controller
Personal Information:-
Name : Amar Bhaskar Adhav
Father Name : Bhaskar D. Adhav
Date of Birth : 03 Feb 1977.
Nationality : INDIAN
Marital Status : Married
Language Known : English, Hindi, & Marathi.
Educational Qualification :-
Diploma in Mechanical Passed June 2014, in CIMS,Central India Institute Of Management Studies Institute. (Nagpur University).
Completed NCTVT (20th Oct. 1998 to 19th Oct. 1999) (M/S Pennwalt India Ltd., Nerul, Shiravane MIDC. Navi Mumbai - 400 706)
GOVERNMENT INDUSTRIAL TRAINING INSTITUTE BELAPUR, Trade Passed July 1998 CBD-BELAPUR, Navi Mumbai – 400 703.
S.S.C. Passed (Bombay Divisional Maharashtra State Board March 1995.
Additional Qualification:-
Microsoft Office Word& Excel.
Computer Hardware Engineering course in Govt. Polytechnic collage in Bandra Mumbai
Present Employee:-
M/s.KAL Energy India Pvt Ltd . Navi Mumbai
It is specialized CNG Hydraulic Booster Compressor Packagers.
My Role : Document Controller on CNG Booster Projects. From 1STAugust 2021 to till date (Continue Work )
• Packaging related Engineering approved documents, Drawing, Scanning & Original hard copy arrangement DCI vise into Box file & soft copy upload into Main Server arranged project vise.
• All data is accurate and documents are stored, backup at any retention policies are followed
• Maintain an efficient filling system for easy reference of catalogues, a record of technical data latest revision of drawing received from client.
• Create New Project Related Pre-Award file, Running Project related Correspondence document file, Invoice Copy, Transmittal file proper updating day to day.
• Performing stage wise inspection as per QAP & Preparing Final Inspection reports.
• Job related documents verified by interacting with Third Party Inspector (TPI) and preparing material identifications reports.
• Offer in the stage wise setup to TPI as per their Check Point in QAP and Co-ordinate with them.
• Preparing Final Inspection Dossier and Submitted to client Soft copy with hard copy,
• Coordinating with client for Documentation.
• Achieved Quality target as per QAP and Customer requirement.
ONSHORE & OFFSHORE FIELD.- Air Compressor & Gas Compressor ONGC Projects
Experience In India:
Savair Energy Pvt Ltd. Mahape MIDC. Navi Mumbai
It’s specialized in Mid-size EPC services to major utility for large industries and infrastructure projects & CNG Compressor Packagers.
I joining as a DOCUMENT CONTROLLER (11 May. 2014 to 31st July 2021)
My Role Document Controller on Projects.
• Handling all types of document independently.
• To prepare the project document index as per receipt DCI from client Document
• Review comments and Approvals received from client and distributing respective discipline for updating the drawings.
• To Prepared latest revision Code-1 approved Drawing distribution for drawing / document in factory, offshore Sites, Onshore Site and Head office.
• Maintain an efficient filing system for easy reference of catalogues, a record of technical data latest revision of drawing received from client.
• Forward the drawing query if any to client and keep the track till it get resolve
• Pipe Spool mark-up from the received approved drawing of Piping.
• To maintain a record of fabrication status of both Onshore & Offshore.
• Create New Project Related Pre-Award file, Running Project related Correspondence document file, Invoice Copy, Transmittal file proper updating day to day.
• Packaging related Engineering approved documents; all originals Final Inspection Reports & Material test certificates hard Copy Scanning. Soft copy sends by via mail & Dispatched 3 Sets hard Copy files handover to Client.
• Approved drawing, documents Scanning & Original hard copy arrangement DCI vise into Box file & soft copy upload into Main Server arranged project vise.
• All data is accurate and documents are stored, backup at any retention policies are followed.
OFFSHORE FIELD.- Oil & Gas Division
Experience In India:
Production Supervisor (01st Nov. 2008 to 23rd June 2012)
Das Offshore Engineering Pvt Ltd. C.B. D. Belapur.
Production of Company:-
It’s a contracting company which takes the contract of ONGC work, of offshore piping, Deck Extension & Strengthing work with Execution & Commissioning. The only first Indian company which have built SKY-WALK in Bandra.
I joined as a “Production Supervisor,”
Project completed Pipeline Replacement -2 (PRP-2) Season 1998 to 2011, WIN-Revamp.
*JOB RESPONSIBILITIES:- Production Supervisor*
• Project planning & co-ordination with various department & project execution team.
• In workshop fabrication piping spools, structural deck, Handraillings, & other fabrication work.
• Always try to avoid the rework.
• Attending daily meeting with client, safety personnel to maintain Coordination about site work.
• Coordinate and Expedite project issues between Client, Engineering and Construction Contractor for the assigned project.
• To monitor and supervise the operational activities such as onshore fabrication, offshore installations until commissioning, in co-ordination with contractors and liaison with clients, TPIA.
• To ensure execution of work at site complying with scope of work, keeping schedule and using available manpower & equipment within approved cost estimates.
• Prepare execution plan/strategy, project schedule.
• Carry out Site Survey, and incorporation & generation of necessary feedback for Engineering Team to guide through drawings and design.
• Issue Procedures & Task plans ensuring that all relevant Technical, safety and quality issues are addressed.
• Lead the pre mobilization and mobilization activities.
• Erection of Structural Deck extension Platform for IGF Vessel &, Supports of structures.
• Prepare and making as built drawing as per site condition.
• Hydro testing and Pneumatic testing of the pipe line.
• Inspection of fabrication & erection of different types of pipe. valves, supports Assembly. Erection of structure Deck Extension, Staircase, Handrailling.
ONSHORE PROJECT : Oil & Gas Petrochemical - Refinary.
Employed: Gannon Dunkerley Engineering & Co. Pvt Ltd
I joined as a “Fabrication Supervisor,”
1. JERP Project (Reliance Pvt. Ltd. Jamnagar, Gujarat) From 12.02.2008 to 31.10.2008
2. Green Fuel & Emissions Control Project in HPCL, Mahul Site in Mumbai From 01.09.2006 to 10.02.2008
3. IPA Project, Deepak Fertilizers and Chemical Pvt. Ltd., Navi Mumbai, Taloja From 01.04.2005 to 31.08.2006
*JOB RESPONSIBILITIES:- Site Supervisor*
• Supervision Under execution In Site.
• Manpower handling.
• Daily Planning for the work. Discuss with Client & Consultant.
• Reporting to higher level for daily planning.
• Inspection of fabrication & Erection of different types of pipes.
• Valve Erection & Assemble to Manifold, Shut Down work In tankage Area
• Checking of different type of pipe line Insulation.
• Final Checking of painted Pipe Line & Steel Structure.
• Hydro Testing & Pneumatic testing of Pipeline, Valve
• Reading the Piping Isometric drawing and raising the Material Take off (MTO).
• Spool Mark Up in Isometric drawing for fabrication of piping Preparing.
• To ensure execution of work at site complying with scope of work, keeping schedule and using available manpower.
• Having the responsibility for the erection and installation of various processes piping in the main pipe rack.
• To monitor and supervise the operational activities such as onshore fabrication, installations until commissioning, in co-ordination with contractors with clients, TPIA.
• Inter-connection of various processes piping to Vessel, Columns, Pumps Suction line & Discharge line, Heat Exchangers, & Tankage area.
• Responsible for site supervision and progress assessment for the sub-contractor billing.
Context kindly following details:
Total years of experience in Oil & Gas industry: :- 16 yrs.
Current Organisation & Designation: :- M/S.KAL ENERGY INDIA PVT LTD
Reporting to: :- DGM
Current Location: :- Navi Mumbai.
Family Background :- Wife, 2 Children, FATHER,MOTHER.
Current CTC (Fixed + Variables): :- 3.7 LPA
Expected CTC (Mention if negotiable): :- 3.8 to 4.0
Notice Period: :- 1 Month
Notes:
I hereby declare that the above given details are true and accurate to the best of my knowledge and belief.
If I have been given a chance, I will do my best to satisfy my superiors.
With Warm Regards,
Amar B. Adhav. 865-***-****)
Place: Vashi, Navi Mumbai.