Post Job Free

Resume

Sign in

Industrial Training Model City

Location:
Lagos, Nigeria
Posted:
July 11, 2022

Contact this candidate

Resume:

Engr. OJO, OLANIRAN FOLUSO Mnse, Coren.

B. Eng (Hons) Civil Engineering: 2

nd

Class Upper Division.

** ******** ***., *** *** IJEBU, BEHIND

ADEGBEMILE CULTURAL CENTRE, AKURE, ONDO STATE

Phone No: +234 (0-806*******

E-mail: adrpap@r.postjobfree.com

PERSONAL SUMMARY:

A competent Engineer possessing a proven track record of preparing and executing project plans; ensure that work is carried out in accordance with the companies’ procedures and client’s satisfaction. Able to ensure timely, safe and cost-effective design and implementation during the life cycle of projects from conception till client’s satisfaction.

PERSONAL SKILLS:

Excellent analytical, interpersonal, communication, organisation and co- ordination skills.

Excellent Team Spirit.

Ability to work independently and as part of a team with extreme workloads.

Basic IT skills in Microsoft Office Suites, AutoCAD, ProtaStructure, RCD2000, Highway Design Program (HDP), CivilCad etc. ACADEMIC QUALIFICATIONS:

2001 – 2007: University of Ado Ekiti, Ekiti State.

(B. Eng Civil Engineering)

(Second Class Honours, Upper Division)

2000: Comprehensive High School, Ayede Ogbose

Akure.

1997 – 2000: Idris Premier College Ilesha Motor Park Awule Road, Akure.

1993 – 1997: Unity Secondary School, Ikere Ekiti, Ekiti State.

(S.S.C.E)

1991 – 1993: Adetola International Nursery & Primary School, Oshile Quarters, Akure.

(First School Leaving)

1986 – 1991: St. Paul Anglican School, Idiaagba Tutun Akure

OTHER WORK EXPERIENCE (CONTRACT):

May 31

st

2019 – June 26

th

2019:

Railnet International Company.

(Designing, Building, Operation & Maintenance of Railroad Systems) West Palm Beach Gardens, 33415 Florida,

United States.

Post held: Civil/Earthwork Engineer.

Project: Site Inspection on Koulikoro – Bamako – Dakar Railroad Corridor Duties:

To conduct a preliminary assessment/inspection of the current line in terms of the structure, track formation, culvert and bridges structures respectively, undertook a close inspection of the line between Bamako to Koulikoro in Mali which was our first inspection and was carried out on 5

th

June, 2019. Also, the second inspection took places from 10 th

June, 2019 – 21

st

June, 2019 between Bamako to Senegal in the

Company of Railroad Engineers.

Ensuring that all HSE procedures are met and maintained. September 31

st

2015 – April 12

th

2016

Project: Construction of Dunamis Church, Abuja, using H - Steel Stanchion Client: Dunamis International Gospel Centre Dawaki Abuja.

(Designed & Supervised) – Completed

May 2016

Project: Proposed Residential Hostel Development

Location: Omostosho family land Aule Road behind FUTA, Akure, Ondo State Client: Mr Esan Olusola Samuel

(Designed only)

December 2019

Project: Proposed residential Hostel & Shop Development Location: Behind Osun State University, Oke Baale Osogbo, Osun State. Client: Prince & Mrs Surajudeen Adebayo

(Designed & Supervised) – Ongoing

July 2017

Project: Proposed Residential Duplex

Location: Benin City, Edo State.

Client: Engr. Bright Ogbeiwi

(Designed & Supervised) - Completed

WORK EXPERIENCE:

Jan. 2012 – June 2019:

S & M Nigeria Ltd.

(Building & Civil Engineering Construction)

Plot 292 Opposite Abuja Model City, M M,

Highway Kubwa Express Abuja.

Post held: Project Engineer/Manager.

Duties:

Handle tasks of providing design and drafting services for detail road design phase of the project.

Responsible for interpreting survey results into technical drawings. Perform responsibilities of preparing drawings by using Software. Responsible for assisting project manager on all phase of the project. Earthwork volume Calculation of project. Familiar with AASHTO road design and building specification.

Supervision of Construction to Commissioning in the following fields of operations: Civil Engineering, Road Construction, Building Construction, Foundation/Shore Protection Works, Earthworks and drainage works, Infrastructure provision and urban transport system. Ensures all operations are undertaken in a safe manner in accordance with company’s HSE policy in every project.

Preparation of progress report at different stages of a project. Ensure and monitor timely delivery of materials, proper security at site, safety assurance and approval of all works order on site. Supervision and co-ordination of multiple contractors. Supervision of staff to ensure project quality objectives are attained. Meet with the project managers, architects, electrical, mechanical engineers and other involved in the project to discuss plans. Monitor quality of services and materials provided by various service contractors.

Procedure review and revision if required, in conjunction with the Project Engineer.

Projects Handle:

Rehabilitation & Construction of Temporary Access Road from Gosa Landfill to Airport Expressway Abuja.

Client - Federal Capital Development Authority, Abuja. (FCDA).

(Designed & supervised respectively) - (Completed) Construction of Suleja-Bakin Iku Road, Niger State. Client-Federal Ministry of Works Abuja.

(Designed & supervised respectively) - (Completed) Provision of Engineering Infrastructure to Hamza Abdullahi Close Asokoro,Abuja.

Client-Federal Capital Development Authority,Abuja. (FCDA).

(Completed)

Rehabilitation of Kabusa Township Road from Peseli-zhimi Client-Abuja Municipal Area Council. (Completed)

Construction of Drainage Line & Asphalt Overlay of Sabon Giri Road Bwari Town.

Client-Bwari Area Council. (Completed)

Rehabilitation Of Roads & Drain at Gwarinpa ll,Abuja. Client-Federal Housing Authority (FHA), (Completed) Construction of Private Hospital at Omuo Ekiti

Client – S & M Medical services Limited, Abuja.

(Designed & Supervised) – (Ongoing)

Construction of Residential Duplex both at Dutse-Alhaji, FCT, Abuja & Omuo Ekiti respectively.

Client – Bldr. Ogunbusola S.A

(Designed & Supervised respectively) - (Completed) Repairs of Abaji – Toto – Nasarawa State Border Road in the Federal Capital Territory (FCT) (CH.36+000-CH.41+000) As Alternative Location to Contract for the Repairs of Madalla-Jabi Road Section ll, Dei-Dei – Karmo Road (CH.6+000 – CH21+000) Client: Federal Ministry of Power, Works & Housing (Completed). Construction of 2 Nos River Crossing in Niger State i.e (10m Bridge Span & 3m x 3m Box Culvert)

Client – Federal Republic of Nigeria, Niger State project Implementation Unit. Niger State Rural Access & Mobility Project (Ramp 2). (Completed)

Construction of Abere, Osogbo sector command office complex Abere, Osun State.

Client – Federal Road Safety, Abuja. (Completed)

Construction of RS8.31 Ilorin sector command office complex Ilorin, Kwara State.

Client – Federal Road Safety, Abuja. (Completed)

Construction of Rigid Pavement in Suleja – Izom Road Client – Niger State Rural Access &Mobility Project (Completed) Construction of the street lighting for the express road Linkage to FHA Site Zuba, Abuja – FCT (Lot 2)

Client – Federal Housing Authority (Completed)

June 2008 – Dec. 2011:

Johacon Associates. (Consulting Civil/Structural & Environmental Engineers)

MM Way,Benin City, Edo State.

Post held: Resident Consultant Engineer.

Duties:

Supervising projects from conception to completion. Ensures all operations are undertaken in a safe manner in accordance with company’s HSE policy in every project.

Providing technical support to the contractor

Responsible for overseeing the review, initiation and execution of contracts.

Checking project budgets and keeping costs down.

Overseeing the maintenance of projects during the defect liability period. Responsible for the completion of all documentation. Evaluating tenders and providing recommendations.

Carrying out effective client liaising for all projects undertaken. Resolving complex technical issues and coming up with fast efficient solutions.

Projects Handle:

Construction of Faculty of Management Science Complex, Delta State, University of Asaba Campus.

Client-The Vice Chancellor, Delta State University. Construction of Igbokoda/Orere, 11km

Client-Niger Delta Development Commissions (Completed) Construction of Amendokhian-Ugboha Road, Esan North East LGA(8.9km)

Client-Edo State Government. (Completed)

Construction of Abehe & Iwebo Streets, Benin City. (365m&280m road Length)

Client-Edo State Government. (Completed)

Construction of the Oleri Brigde & Access Road. 9120m Span Bridge

& 8.5km Road Length)

Client-Delta State Government of Nigeria (Ministry of Works, Asaba)

Rehabilitation/Restoration of Agbedo Market, Benin City. Client-Edo State Government (Completed).

April. 2006 – Nov. 2006:

Internship/Industrial Training

Archimetric Nigeria Limited,

No 9, Agboyin Street Surulere, Lagos State.

Post held: Assistant Site Engineer

Duties:

Renovation of Generator House to Store.

Supervision of the Washing Bay for Beta Glass PLC. Supervision of the Road from Warehouse to the Existing Road. Supervision of drainage & Reconstruction of Some offices. Assisting the Surveyor to take levels for drainage & the Floor of the Warehouse.

Ensuring that all HSE procedures are met and maintained. Project Handle:

Construction of Warehouse at Beta Glass Plc Agbara, Ogun State. PERSONAL DETAILS:

Date of Birth: 14

th

April 1981.

State of Origin: Ondo State.

L.G.A: Akure South.

Home Town: Akure.

Nationality: Nigeria.

Marital Status: Married.

HOBBIES: Reading, Traveling and Listening to good Music. REFEREES:

1. Engr. Olatunji Oladimeji

Federal University of Technology (FUTA)

Department of Mechanical Engineering

080********.

2. Engr. Shina Eleniselu.

Investrite Limited,

Beside GM Pharmacy Upper Uwa,

Off MM Way,

Benin City.

070********.



Contact this candidate