Post Job Free

Resume

Sign in

Aviation Structural Power Authority

Location:
Longview, TX, 75604
Salary:
Open
Posted:
July 13, 2022

Contact this candidate

Resume:

Greetings,

My name Is Michael A. Lloyd, I’m a Project Controls Specialist with over 20 year’s experience, and a Bachelors in Project Management from Redding University. I specialize in the planning, scheduling, estimating, cost control, resource loading, critical path management, earned value management, claims, claims analysis, tracking, reporting of projects as well as contract management and document control. With a comprehensive background in all areas of quantitative and qualitative analysis, I am highly skilled in identifying and reducing areas of risk exposure and risk management.

By employing the highest levels of service and quality controls in daily management practices, while demonstrating exceptional creativity, leadership and visionary focus. I am committed to achieving outstanding results to ensure my clients satisfaction.

Having real world experience in such foreign countries and cultures as; Qatar, Saudi Arabia, Bahrain, Aruba, Puerto Rico, Colombia, Canada and numerous locations in the U.S. the types projects worked includes; EPC, Grass Roots New Construction Projects, Turnarounds, Outages, Maintenance, Sewage / Storm Water System Upgrades, Tank Farms, as well as few Decommissioning and Dismantlement Projects.

While working in such industries as; Oil Refining, Biodiesel Refining, Cat Cracker project, Petrochemicals, Waste Water Treatment Plants, Mining Projects, Paper Mills, Aerospace, Power Generation / Distribution, Computer Chip Manufacturing Plants, Liquid Natural Gas Plants, and Pharmaceuticals. By employing the highest levels of best practices, and being proficient in the latest versions of; Primavera Project Planner/Manager, MS Project, and all MS Office products including Share Point, also familiarity with Maximo, SAP, and Citrix to provide the highest quality service.

Some companies that have been the recipient of my services include; Conoco Phillips, Coastal Refining, Koch Refining, Boeing Aerospace, Northrop Grumman Aerospace, Lockheed Martin Aerospace, Flour LTD, Kellogg Brown & Root, American Electric Power, Glaxo Smith Kline, Pacific Gas & Electric, Long Island Power Authority, Serve-tech EPC, Belmont Constructors EPC, Texas Utilities Co, Shell Oil, Cargill Foods, Drummond LTD, Pro-Quip, Sunoco Oil, and Mohammad Al Mojil Group.

Regards,

Michael A. Lloyd

Project Controls Specialist BSPM

Ph: 903-***-****

adrp02@r.postjobfree.com

EDUCATION

Longview High School Diploma

201 E. Tomlinson Pkwy.

Longview, TX 75605

Graduated 1980

Kilgore College: Business Management, Computer Science

1100 Broadway

Kilgore, TX 75662

1980 - 1984

Redding University: Project Management

Online Courses

2004 – 2012 Earning a Bachelors Degree

Specialized Training

1979-1980 Emergency Medical Technology

Kilgore College

Certified by: State of Texas 1980-1981 and the State of Louisiana 1980-1981

1985-1986 Aviation Training and Aviation Structural Repair

Naval Air Technical Training Center

Memphis, TN: Graduated in Top 5% of Class with a GPA of 3.7 on 4.0 Scale.

Computer Classes

2005 Evans Technology

Atlanta Georgia Primavera P3e/c 4.1 & 5.0 and Expedition 10.0

1993 The Network Center

Fargo, ND MS Access, levels 1, 2, and 3

WORK HISTORY

Jan 2015 – Aug 2015

KBR International

1080 Eldridge Parkway

Houston, TX. 77584

Turnaround Scheduler at the Majnoon Facility in IRAQ

I was on a team that put together work packages from SAP and then built the Turnaround Schedule for the degasification of both sweet and sour crude oil. The T/A schedule were resource loaded and Critical path was established and managed. Earned value procedures were implemented for track progress reporting and cost control. We used Primavera v 8.3 server base software and MS Office suit. It was a high priority project, reporting progress on a daily bases. There were several contractors and Sub contractors that I had to interface with from several different countries as well as interfacing with IRAQIE nationals that worked in the facility. I was quite an experience. I know I won’t forget it anytime soon. And I would return there again, if called upon. __

Sep 2014 – Dec 2014

Insperity Inc

19001 Crescent Springs Drive

Kingwood, TX. 77339

Project Controls Specialist

Built and maintained the project schedule for the pre-turnaround portion on the expansion project at the Delek refinery. The schedule were resource loaded and Critical path was established and managed. Earned value procedures were implemented for track progress reporting and cost control, reporting and maintenance of the schedule requiring workarounds and what if scenarios using Primavera P6 vr 8.3 and MS Excel. Writing, estimating and tracking RFI’s and capturing cost and schedule impact of extra work issues using P6, Excel, MS Word, MS Access, MS PowerPoint, and Adobe Acrobat. As well as continually monitoring delivery dates of equipment and conducting coordination meeting, weekly meeting, and preparing agendas.

__

Mar 2014 – Apr 2014

KBR

601 Jefferson St.

Houston, TX. 77002

Project Controls Specialist

Built maintain and analyze the project schedule for a Rayonier boiler outage project in Jessup, GA. Utilizing MS Project 2010 schedule were resource loaded and Critical path was established and managed. Earned value procedures were implemented for track progress reporting and cost control. Change order, risk management were important portions of this project as well as cost control.

__

Jul 2013 – Feb 2014

Partners Alliance.

P.O. Box 1936

Cranberry Township, PA, 16066

Project Controls Annalist at American Electric Power (AEP) Tulsa, OK

Create, maintain and analyze the project schedule for a seven hundred fifty million dollar transmission line project in South Texas. Utilizing P6 we integrated a large number of detailed subprojects into one master schedule with links between the subprojects to drive the appropriate items. Manpower and cost loading / Tracking / forecasting are also required along with risk analysis and mitigation for the timely completion of this project

__

Nov 2012 – Apr 2013

Willis Scheduling Group.

172 Lackine Drive

Rochester, NY 14618

Program Master Planner/Scheduler : Lockheed Martin for the creation of SERVCO

Create, maintain and analyze the Program Master Scheduler for Lockheed Martin. Utilizing MS Project we integrated 10 detailed subprojects into one master schedule with links between the subprojects to drive the appropriate items. Manpower loading was necessary for the timely completion of this project. Est. Project cost 40 million. Successfully Completed my assignment and Lockheed replaced me with some one less expensive, which I was about half expecting. __

Jun 2011 – Mar 2012

Jedson Engineering Inc.

Park 50 Technecenter

5300 DuPont Circle

Milford, OH 45150

Project Controls Manager

Assigned to the Yanbu Export Refinery Project, located in Yanbu Saudi Arabia. Where I assisted the core contractor in implementing, using, and reporting out of P6.7 as per there contract specs. I am also the assistant interface manager for the SP-6 project, assisting in project interfacing between the SP-6 interconnecting pipe rack project and all of the other project on this build. I am currently PCD manager on the EPC-3A project and am creating a level 4 resource loaded detailed schedule for the construction of the Gasoline and Sulfur Unit. Est. project cost 4 billion. The Prim Contractor (MMG) had some serious financial problems and decided to cut Jedson’s contract short, in total five Jedson expats were laid off

.

Jan 2009 – Aug 2010

MTR Inc.

743 Horizon Ct. Suite 118

Grand Junction, CO 81506

Primavera Scheduler : Drummond LTD

Planning and scheduling manpower, materials, equipment, and task sequence on the projects using Primavera Project Manager ver.3.1 then changed to 6.0 Responsible for developing and marinating the integrated master schedule thru the use of subprojects from the subcontractors selected to reassemble a Bucyrus drag line in Colombia South America. Est. project cost 20 million. Successfully Completed the Project.

__

Mar 2008 – Dec 2009

TOTAL TECHNICAL SERVICES INC.

411 WAVERLEY OAKS ROAD, SUITE 302

WALTHAM, MA 02154

Program Master Planner/Scheduler : Lockheed Martin at Mischoud Space Center New Orleans, LA.

Create, maintain and analyze the Program Master Scheduler for The ORION Project. Utilizing MS Project we integrated 11 detailed subprojects into one master project with links between the subprojects to drive the appropriate items. Manpower loading and some tooling and equipment loading was necessary for the timely completion of this project. Est. project cost unknown. Laid off due to government cut backs on this particular project.

__

Feb 2007 – Feb 2008

MTR Inc.

743 Horizon Ct. Suite 118

Grand Junction, CO 81506

Primavera Project Scheduler : Process Systems Inc. (PSICC)

Planning and scheduling manpower, materials, equipment, and task sequence on the projects using Primavera Project Manager ver.3.1. Responsible for developing and marinating the integrated master schedule thru the use of subprojects from the subcontractors selected to build the Bio-Diesel plant for Cargill in Kansas City MO. Est project cost 2 billion. Successfully Completed the Project.

Aug 2006 – Jan 2007

Fluor Mideast LTD

Raslafan Industrial City

Qatar

Primavera Scheduler : Raslafan LNG Off Plots Project

Maintained the master schedule and evaluated subproject from our subcontractors assisting them where needed utilizing Primavera 3.1 and MS Office products.

Jul 2005: - Aug 2006

Pathfinder LLC

11 Allison Drive, P.O. Box 5027

Cherry Hill, NJ 08034

Primavera Scheduler : Glaxo Smith Kline (Cidra Puerto Rico)

Planning and scheduling manpower, for a consent decree from the Federal Government to control quality and establish procedures and re-qualify equipment to meet the standards set forth by the FDA. Cost Tracking and forecasting playing a major roll in this project. Utilizing Primavera 4.1 and MS Office products.

__

Mar 2005 - Jul 2005

MTR Inc.

743 Horizon Ct. Suite 118

Grand Junction, CO 81506

Primavera Scheduler : Kinetic Systems Inc.

Planning and scheduling manpower, materials, equipment, and task sequence on the projects using Primavera Project Manager ver.3.1. Also responsible for tracking man hours, materials, equipment, and updating the CPM schedules and Progress Reports. For the new fabrication facility for Texas Instruments Inc. Plano TX.

Jan 2004 – Mar 2005

TOTAL TECHNICAL SERVICES INC.

411 WAVERLEY OAKS ROAD, SUITE 302

WALTHAM, MA 02154

Program Master Planner/Scheduler : Lockheed Martin at Mischoud Space Center New Orleans, LA.

Create, maintain and analyze the Program Master Scheduler for the “Return to Flight External Tank” for the re-implementation of NASA’s space shuttle flight program. Utilizing MS Project we integrated 12 detailed subprojects into one master project with links between the subprojects to drive the appropriate items. Manpower loading and some tooling and equipment loading was necessary for the timely completion of this project.

2003: Collins & Associates Technical Services Inc. (CATSI)

7991 Ohio River Rd.

Wheelersburg, OH 45694

Routine Maintenance Planner Scheduler: Coastal Aruba Refining Company N.V.

Planning and scheduling manpower, materials, equipment, and task sequence of the routine maintenance using Maximo, Primavera Project Manager ver.3.1, and excel. Other duties include estimating extra work, project development, maintaining project files and preparing and issuing reports.

Planed, scheduled and exactitude the turnaround for the sulfur unit. Preparing daily work schedules and updating the schedule and tracking of production and cost.

2002: MTR Inc.

743 Horizon Ct. Suite 118

Grand Junction, CO 81506

Primavera Scheduler: ARB Construction Inc.

Planning and scheduling manpower, materials, equipment, and task sequence on the projects using Primavera Project Manager ver.3.1. Also responsible for tracking man hours, materials, equipment, and up dating the CPM schedules and Progress Reports. Other duties include maintaining the job site computers and network, estimating extra work, project development, maintaining project files and preparing and issuing agendas for meetings with the clients and the home office. Project worked: Elk Hills Power Project. Elk Hills, CA. Kern County.

2001: MTR Inc.

743 Horizon Ct. Suite 118

Grand Junction, CO 81506

Primavera Scheduler : The PRO-QUIP Corporation

Planning and scheduling manpower, materials, equipment, and task sequence on the projects using Primavera Project Manager ver.3.0. Also responsible for tracking man hours, materials, equipment, and up dating the CPM schedules and Progress Reports. Other duties include maintaining the job site computers and network, estimating extra work, project development, maintaining project files and preparing and issuing agendas for meetings with the clients and the home office. Project worked: The TXP-3 grassroots Natural gas refining expansion at Williams Energy, Echo Springs, WY and the CCR Platform at Orion Refining Corp. Norco, LA.

2000: EXECUTIVE EDGE STAFFING SOLUTIONS

44 Medford Av.

Patchogue, NY 11772

Program Master Planner/Scheduler: BOEING Aircraft Co. Philadelphia, PA

Planning and scheduling manpower, materials, equipment,and task sequence on the CH-47F Military Helicopter Program for the U.S Army, using Microsoft Project and Open Plan. Also responsible for tracking man-hours, materials, equipment, and up dating the schedules and pert charts.

1999: H. L. YOH COMPANY, INC.

2626 East 82nd Street

Bloomington, MN 55425-1323

Project Manager : Pioneer Power Inc. St. Paul, MN.

Planning scheduling and tracking manpower, materials, and equipment. Worked on capital work, maintenance work, and three turnarounds at the Koch Refining Company in St. Paul, MN. Using Primavera, Excel, Word and Access. Reported progress to, and worked with the project controls contractor Fluor Daniel.

1998: TOTAL TECHNICAL SERVICES INC.

411 WAVERLEY OAKS ROAD, SUITE 302

WALTHAM, MA 02154

Program Master Planner/Scheduler : Lockheed Martin at Mischoud Space Center New Orleans, LA.

Planning and scheduling manpower, materials, equipment,and task sequence on the Kistler reusable Launch Vehicle program, using Microsoft Project and Open Plan. Also responsible for tracking man-hours, materials, equipment, and up dating the schedules and pert charts.

1997: RESOURCE MANAGEMENT INTERNATIONAL.

1393 VETERANS MEMORIAL HWY.

HAUPPAUGE, NY 11788

Planner/Scheduler: Northrop Grumman Lake Charles, LA.

Planning and scheduling manpower, materials, equipment,and task sequence on the Joint Stars Project, using Microsoft Project. Also responsible for tracking man hours, materials, equipment, and up dating the gant chart schedules and pert charts for the Joint Star Program.

1996: MTR Inc.

743 Horizon Ct. Suite 118

Grand Junction, CO 81506

Primavera Scheduler : Freytag Weindhart

Planning and scheduling manpower, materials, equipment,and task sequence on projects using Primavera for windows ver.1.1. Also responsible for tracking man hours, materials, equipment, and up dating the gant chart schedules and pert charts. Other duties include maintaining the job site computers and network, estimating, project development, maintaining project files and preparing and issuing agendas for meetings with the clients. Projects worked include the Pro Gold corn wetting plant in Whapaton, ND.

1994-1996: SERV-TECH EPC, INC.

3838 North Causeway BLVD. Suite 2200

Metairie, LA 70002

Senior Scheduler

Planning and scheduling manpower, materials, equipment,and task sequence on all jobs using Primavera for windows ver.1.1 and Sure Track for windows ver.1.0, and Microsoft Project. Also responsible for tracking man hours, materials, equipment, and up dating the gant chart schedules and pert charts. Other duties include maintaining the job site computers and network, estimating, project development, maintaining project files and preparing and issuing agendas for meetings with the clients. Projects worked include the dismantling and shipping of a fertilizer plant in Iowa, Tank farm addition, waste water treatment facility and part of the lube oil hydrocracker at Conoco in West Lake Louisiana. Worked on a Turnaround at Coastal refinery in Corpus Christi Texas.

1993-1994: Belmont Constructors

3225 Preston Road

Henderson, TX 75652

Planner / Scheduler and System Information Technician

Planning and scheduling manpower, materials, equipment, and task sequence on all jobs using Mac Project Pro, Super Project 2.1 for Windows, Microsoft Project, and Primavera for windows ver.1.0. Also responsible for tracking man hours, materials, equipment, and up dating the gant chart schedules and pert

charts. Other duties include maintaining the offices computers and network, program analysis, estimating, project development, maintaining project files and preparing and issuing agendas for meetings with the

clients. Project assignment the dismantling, shipping and reconstructing a draggling for Texas Utility Mining Company.

1992-1993: Service Painting Company of Texas

At Texas Eastman Co.

Longview, TX

PE-3 Project Coordinator

Track construction and painting progress using isometric drawings and blueprints. Plan manpower and materials for completion by due dates. Kept the foreman up to date on systems detail progress. Inspect completed system details and generate punch-lists. Track all costs related to the project, by work orders. Data entry, implementing revisions, creating reports, conducting meetings, and site safety management. Project assignment polyethylene plant 3 at Texas Eastman Company.

1990-1992: Vertex Communications

Longview St.

Killgore, TX

Production Coordinator

Coordinated information between the different departments to plan and schedule the production of the various satellite ground station for satellite communication, in order to meet customer requested delivery dates. Also tracking of Production, productivity, material inventory, and product inventory.

1986-1990: United States Navy

Aviation Structural Mechanic

Maintained aircraft for (scheduled and unscheduled) maintenance and served as Training Petty Officer (PO), Safety PO, disbursed technical publication PO, corrosion control PO, tool control PO, hazardous waste PO, and as a troubleshooter and final inspection PO.

1981-1986: Design Associates, Inc.

Longview, TX

Project Coordinator

Coordinated the various subcontractors, and assisted in the designed and drafting of projects, doing floor plans, elevations, and renderings. Prepared color boards for colors, fabrics and carpet. Selected style and quantity of furniture, designed and laid out lighting and sound systems. Responsible for purchasing, quality control, installation, and customer satisfaction. Project assignments include Holiday Inn, Ramada Inn, Peoples Restaurant and Bar, and many other night clubs, restaurants, and privately owned hotels.

1980 - 1981: Metro-Medic Ambulance Service

Shreveport, LA

Emergency Medical Technician



Contact this candidate