Post Job Free
Sign in

Geothermal Power Plant

Location:
Huntsville, AL, 35801
Salary:
Company Salary
Posted:
June 30, 2022

Contact this candidate

Resume:

ARISMAN SIHITE

Jl.Danau Laut Tawar I Perum II Tangerang selatan Indonesia

Phone +622******** Mobile +628**********

*******.******@*****.**.** / *************@*****.***

IDCard No.3603282306670002

Pasport No.C6952748 - Date of expiry :21 SEP 2025

BACKGROUND ACADEMIC

NO

NAME

MAJOR

YEARS

1

University of Sumatera Utara U.S.U BSE

Mechanical Engineering

1983-1987

2

Technical High School Negeri III Medan

Mechanical

1981-1983

3

Junior High School Negeri III Medan

Mechanical

1978-1981

WORK EXPERIENCES

NO

Company

JOB DESC

1

NIPPON KOEI CO .LTD

as

ELECTRO MECHANICAL ENGINEER 1

(February 2020 – March 2022 )

Project for PLTA (Hydro Power) Peusangan 1&2 4x22,5 MW Aceh Tengah

Client: PT. PLN PERSERO

Location: Takeon Aceh

Responsible for all construction management activities such as daily supervision, coordination, check point inspection, etc.for Contractor PT .Andritz Hydro .P.P . Nyunday Costruction Corp

Establish regular coordination meeting among Subcontractors and related disciplines Supervise Equipment and Organize Manpower According Schedule.Maintenance Rotating Equipment

Study and Inspect for the correct Installation of Mechanical Equipment and pipe lines as drawing .Perform final leveling /alignment of Equipment Flushing pipe line.

Work for PLN .with NIPPON KOEI CO LTD (KOARSA CONSULTANT ) Takengon ACEH Selatan

2

TRACTEBEL ENGIE INDONESIA CONSULTANT

as

DEPUTY SITE MANAGER (September 2017 – September 2019)

Project for Gas Turbine Generator

Combined Cycle Power Plant 800 MW Tambak Lorok

Client: PT. Indonesia Power

Location: Semarang

Prepared detail of Construction Procedure, Erection, Rotating .Static Equipment and Manpower Schedule for Mechanical Work.Paping Work MaintenanceWork for Rotating and Static

Provide Construction drawings to selected Subcontractors a

Provide CONTRACTOR’s HSSE Plan to Subcontractors and request them to make HSSE program related to their scope of construction work

Provide the QA/QC Plan to Subcontractors and request them to prepare the QA/QC Program

Review all of Subcontractors deliverables, including proposed personnel, materials and equipment

Responsible for all construction management activities such as daily supervision, coordination, check point inspection, etc.

Establish regular coordination meeting among Subcontractors and related disciplines Supervise Equipment and Organize Manpower According Schedule.Maintenance Rotating Equipment

Study and Inspect for the correct Installation of Mechanical Equipment and pipe lines as drawing .Perform final leveling /alignment of Equipment Flushing pipe line.

Work for Indonesian Power company subsidiary P.L.N to supervise the installation of 800 MW Combined Cycle, Power Plant in Tambak Lorok Semarang Java Center

3

KETIRA ENGINEERING CONSULTANT

as

SITE MANAGER

(March 2016 – March 2017)

Client: PT. Indofood Company

Location: Palembang

Participate in contractor events, i.e. Pre-Construction meeting, Mid-Term Inspection, Closed-out Inspection and meeting

Conduct site patrol to ensure site physical work and documentation

Providing technical support

Participate in handing-over and maintenance

4

KETIRA ENGINEERING CONSULTANT

as

SITE MANAGER

(March 2014 – March 2016)

Client: PT. Plant Sugar Angels Production

Location: Bojonegara - Banten

Participate in contractor events, i.e. Pre-Construction meeting, Mid-Term Inspection, Closed-out Inspection and meeting

Conduct site patrol to ensure site physical work and documentation

Providing technical support

Participate in handing-over and maintenance

Make report daily and weekly Monthly report

5

KETIRA ENGINEERING CONSULTANT

as

DEPUTY PROJECT MANAGER (April 2012 – March 2014)

Client: PT. Astra Honda Motor

Location: Cikampek

Conduct contractor training to all new project review line clearing. Filing structural mechanical electrical instrument method statement, technical documents produced by site/sub-contractor to ensure compliance with contractor or consultant’s requirements

6

GAKA ENGINEERING

as

CONSTRUCTION MANAGER

(March 2011 – March 2012)

Project for PT. KDL Gas Turbine Generator Combine Cycle Power Plant 120 MW

Client: PT. Krakatau Daya Listrik

Location: Cilegon – Banten

Manage overall construction

Review, analyzes and report monthly

Leads the site management team.

Direct change order management for subcontracts.

Coordinates with project manager to identify and execute change order to sub check, install

Initial alignment GT to ACC gear, install alignment facture on LG coupling.

Initial alignment LG to GT, install alignment generator to LG, install L.O pipe.

Direct implementation of project commissioning and testing plan and is responsible for ensuring that the necessary resources are provided to commissioning.

Make report and Progres

7

DONGFANG ELECTRICAL CORPORATION

as

MECHANICAL ENGINEERING

(July 2007 – February 2011)

Client: PT. Pelayanan Listrik Negara

(PLN PERSERO)

Location: Kronjo - Banten

Inspection installation steel structure and record data alignment, dimension, diagonal according spec procedure inspection.

Supervision of foundation and pedestal positioning for installing casing cover.

Supervision Install steam turbine oil circulation, feed water pump H.P / L.P, pump act.

Supervision Install Pipe and lab system and test

8

US DEPARTMENT OF STATE .OBO.

as

MECHANICAL ENGINEERING

(August 2005 – May 2007)

Location: Bagdad - Iraq

Prepared detail of scheduling project

Inspection installation mechanical as Pump, HVAC, plumbing, pipe for Clean Water Dirty Water Pipe line for Fire,

Manage field construction

Act as project-specific interface between OBO USA and construction subcontractor.

Review subcontractor invoice.

Coordinate with construction subcontractor superintendent on baseline issues.

Responsible for initial control of construction work site in the event of an abnormal occurred

Inspection installation mechanical as pump, HVAC, plumbing, piping, fire protection

9

PT FREEPORT INDONESIA.

as

MAINTENANCE GENERAL FOREMAN

(August 2001 – August 2005)

Location: Tembaga Pura – Papua

Manage field construction oversight activity, coordinating the effort of the construction.

Support review and approval of construction changes.

Prepare deviation notices related to construction.

Responsible for subcontract compliance with contract.

Responsible for initial control of construction work site in the event of an abnormal occurrence.

Management field oversight team.

Service / repair all equipment of steam turbine fuji 35 Mw 3 units etc.

10

PT. MANDALA NUSANTARA

as

OPERATION MANAGER - MAINTENANCE SUPERINTENDENT

(September 1999– July 2001)

Project for Geothermal Power Plant Wayang Windu

Location: Bandung – Jawa Barat

Prepared Installation Erection Structural Static and Rotating Equipment

Initial Alignment

Supervision Install for Fabricator Fitting Valve Regulator Gas Box Flange Steam Pipe

Prepared details of Maintenance procedure

Prepare Fuji Spare Parts for a yearly Maintenance Program for all Equipment

Ensure of the Maintenance Team is achieved

Permit to Work

Review and update procedures and work instructions

Participate to review of HSE Procedures

Supervision Pipe Line Steam

11

PT. CHANDRA ASRI PETROCHEMICAL CENTER

as

SUPERINTENDENT MAINTENANCE / CORDINATION

(February 1994– September 1999)

Location: Anyer - Banten

Interprets or clarifies technical aspects of contract documents.

Maintains and prepares a variety of records Static and Rotating Equipment

Ensures that responses to contractors’

Audit inspections for conformity to contract

Highlights any non-conformity to construction/ engineering related issues on site through issuance of NCRs.

Attends progress review meetings and co-ordination meetings

Participates in the coordination and project handover.

Provide support to Resident Engineer

Liaises with the Project Management

Supervision Install Piping. Line Hydro Test Cleaning in Proses Line.Utilities Depart Power Station. Sea Water Pump. Pipe Rack Commissioning and Start Up

12

PT. TOTAL OIL INDONESIA

as

SUPERVISOR MAINTENANCE

(January 1988 – January 1994)

Location: Balikpapan – Kalimantan

Prepared detail of Construction Procedure, Erection, Equipment and Manpower Schedule for Static. Rotating Equipment Mechanical Work Papping Instrument

Provide Construction drawings to selected Subcontractors

Provide CONTRACTOR’s HSSE Plan to Subcontractors and request them to make HSSE program related to their scope of construction work

Provide the QA/QC Plan to Subcontractors

Review all of Subcontractors deliverables,

Responsible for all construction management

Establish regular coordination meeting

Study and Inspect for the correct Installation of Mechanical Equipment and pipe lines as drawing Perform final leveling /alignment of Equipment Flushing pipe line.

Prepare, Preventive Maintenance of all Equipment

Prepared data drawing and inspect spec material

Direct control for Installation procedure

INDIVIDUAL SKILLS

NO

DESCRIPTION

1

Able to operate a computer in windows and Ms. Office well

2

Maintenance with overhaul of almost all rotation Equipment and Machines. Very hard working ambitious and Self motivated

3

General work coordination and Maintenance obtain the highest possible performance. Plus include planning, Methodizing, and Supervision of craftsmen

4

Very experienced with installing of Rotating Equipment and Alignment of Coupling by dial Indicator, Tolerance and Specification.



Contact this candidate