ARISMAN SIHITE
Jl.Danau Laut Tawar I Perum II Tangerang selatan Indonesia
Phone +622******** Mobile +628**********
*******.******@*****.**.** / *************@*****.***
IDCard No.3603282306670002
Pasport No.C6952748 - Date of expiry :21 SEP 2025
BACKGROUND ACADEMIC
NO
NAME
MAJOR
YEARS
1
University of Sumatera Utara U.S.U BSE
Mechanical Engineering
1983-1987
2
Technical High School Negeri III Medan
Mechanical
1981-1983
3
Junior High School Negeri III Medan
Mechanical
1978-1981
WORK EXPERIENCES
NO
Company
JOB DESC
1
NIPPON KOEI CO .LTD
as
ELECTRO MECHANICAL ENGINEER 1
(February 2020 – March 2022 )
Project for PLTA (Hydro Power) Peusangan 1&2 4x22,5 MW Aceh Tengah
Client: PT. PLN PERSERO
Location: Takeon Aceh
Responsible for all construction management activities such as daily supervision, coordination, check point inspection, etc.for Contractor PT .Andritz Hydro .P.P . Nyunday Costruction Corp
Establish regular coordination meeting among Subcontractors and related disciplines Supervise Equipment and Organize Manpower According Schedule.Maintenance Rotating Equipment
Study and Inspect for the correct Installation of Mechanical Equipment and pipe lines as drawing .Perform final leveling /alignment of Equipment Flushing pipe line.
Work for PLN .with NIPPON KOEI CO LTD (KOARSA CONSULTANT ) Takengon ACEH Selatan
2
TRACTEBEL ENGIE INDONESIA CONSULTANT
as
DEPUTY SITE MANAGER (September 2017 – September 2019)
Project for Gas Turbine Generator
Combined Cycle Power Plant 800 MW Tambak Lorok
Client: PT. Indonesia Power
Location: Semarang
Prepared detail of Construction Procedure, Erection, Rotating .Static Equipment and Manpower Schedule for Mechanical Work.Paping Work MaintenanceWork for Rotating and Static
Provide Construction drawings to selected Subcontractors a
Provide CONTRACTOR’s HSSE Plan to Subcontractors and request them to make HSSE program related to their scope of construction work
Provide the QA/QC Plan to Subcontractors and request them to prepare the QA/QC Program
Review all of Subcontractors deliverables, including proposed personnel, materials and equipment
Responsible for all construction management activities such as daily supervision, coordination, check point inspection, etc.
Establish regular coordination meeting among Subcontractors and related disciplines Supervise Equipment and Organize Manpower According Schedule.Maintenance Rotating Equipment
Study and Inspect for the correct Installation of Mechanical Equipment and pipe lines as drawing .Perform final leveling /alignment of Equipment Flushing pipe line.
Work for Indonesian Power company subsidiary P.L.N to supervise the installation of 800 MW Combined Cycle, Power Plant in Tambak Lorok Semarang Java Center
3
KETIRA ENGINEERING CONSULTANT
as
SITE MANAGER
(March 2016 – March 2017)
Client: PT. Indofood Company
Location: Palembang
Participate in contractor events, i.e. Pre-Construction meeting, Mid-Term Inspection, Closed-out Inspection and meeting
Conduct site patrol to ensure site physical work and documentation
Providing technical support
Participate in handing-over and maintenance
4
KETIRA ENGINEERING CONSULTANT
as
SITE MANAGER
(March 2014 – March 2016)
Client: PT. Plant Sugar Angels Production
Location: Bojonegara - Banten
Participate in contractor events, i.e. Pre-Construction meeting, Mid-Term Inspection, Closed-out Inspection and meeting
Conduct site patrol to ensure site physical work and documentation
Providing technical support
Participate in handing-over and maintenance
Make report daily and weekly Monthly report
5
KETIRA ENGINEERING CONSULTANT
as
DEPUTY PROJECT MANAGER (April 2012 – March 2014)
Client: PT. Astra Honda Motor
Location: Cikampek
Conduct contractor training to all new project review line clearing. Filing structural mechanical electrical instrument method statement, technical documents produced by site/sub-contractor to ensure compliance with contractor or consultant’s requirements
6
GAKA ENGINEERING
as
CONSTRUCTION MANAGER
(March 2011 – March 2012)
Project for PT. KDL Gas Turbine Generator Combine Cycle Power Plant 120 MW
Client: PT. Krakatau Daya Listrik
Location: Cilegon – Banten
Manage overall construction
Review, analyzes and report monthly
Leads the site management team.
Direct change order management for subcontracts.
Coordinates with project manager to identify and execute change order to sub check, install
Initial alignment GT to ACC gear, install alignment facture on LG coupling.
Initial alignment LG to GT, install alignment generator to LG, install L.O pipe.
Direct implementation of project commissioning and testing plan and is responsible for ensuring that the necessary resources are provided to commissioning.
Make report and Progres
7
DONGFANG ELECTRICAL CORPORATION
as
MECHANICAL ENGINEERING
(July 2007 – February 2011)
Client: PT. Pelayanan Listrik Negara
(PLN PERSERO)
Location: Kronjo - Banten
Inspection installation steel structure and record data alignment, dimension, diagonal according spec procedure inspection.
Supervision of foundation and pedestal positioning for installing casing cover.
Supervision Install steam turbine oil circulation, feed water pump H.P / L.P, pump act.
Supervision Install Pipe and lab system and test
8
US DEPARTMENT OF STATE .OBO.
as
MECHANICAL ENGINEERING
(August 2005 – May 2007)
Location: Bagdad - Iraq
Prepared detail of scheduling project
Inspection installation mechanical as Pump, HVAC, plumbing, pipe for Clean Water Dirty Water Pipe line for Fire,
Manage field construction
Act as project-specific interface between OBO USA and construction subcontractor.
Review subcontractor invoice.
Coordinate with construction subcontractor superintendent on baseline issues.
Responsible for initial control of construction work site in the event of an abnormal occurred
Inspection installation mechanical as pump, HVAC, plumbing, piping, fire protection
9
PT FREEPORT INDONESIA.
as
MAINTENANCE GENERAL FOREMAN
(August 2001 – August 2005)
Location: Tembaga Pura – Papua
Manage field construction oversight activity, coordinating the effort of the construction.
Support review and approval of construction changes.
Prepare deviation notices related to construction.
Responsible for subcontract compliance with contract.
Responsible for initial control of construction work site in the event of an abnormal occurrence.
Management field oversight team.
Service / repair all equipment of steam turbine fuji 35 Mw 3 units etc.
10
PT. MANDALA NUSANTARA
as
OPERATION MANAGER - MAINTENANCE SUPERINTENDENT
(September 1999– July 2001)
Project for Geothermal Power Plant Wayang Windu
Location: Bandung – Jawa Barat
Prepared Installation Erection Structural Static and Rotating Equipment
Initial Alignment
Supervision Install for Fabricator Fitting Valve Regulator Gas Box Flange Steam Pipe
Prepared details of Maintenance procedure
Prepare Fuji Spare Parts for a yearly Maintenance Program for all Equipment
Ensure of the Maintenance Team is achieved
Permit to Work
Review and update procedures and work instructions
Participate to review of HSE Procedures
Supervision Pipe Line Steam
11
PT. CHANDRA ASRI PETROCHEMICAL CENTER
as
SUPERINTENDENT MAINTENANCE / CORDINATION
(February 1994– September 1999)
Location: Anyer - Banten
Interprets or clarifies technical aspects of contract documents.
Maintains and prepares a variety of records Static and Rotating Equipment
Ensures that responses to contractors’
Audit inspections for conformity to contract
Highlights any non-conformity to construction/ engineering related issues on site through issuance of NCRs.
Attends progress review meetings and co-ordination meetings
Participates in the coordination and project handover.
Provide support to Resident Engineer
Liaises with the Project Management
Supervision Install Piping. Line Hydro Test Cleaning in Proses Line.Utilities Depart Power Station. Sea Water Pump. Pipe Rack Commissioning and Start Up
12
PT. TOTAL OIL INDONESIA
as
SUPERVISOR MAINTENANCE
(January 1988 – January 1994)
Location: Balikpapan – Kalimantan
Prepared detail of Construction Procedure, Erection, Equipment and Manpower Schedule for Static. Rotating Equipment Mechanical Work Papping Instrument
Provide Construction drawings to selected Subcontractors
Provide CONTRACTOR’s HSSE Plan to Subcontractors and request them to make HSSE program related to their scope of construction work
Provide the QA/QC Plan to Subcontractors
Review all of Subcontractors deliverables,
Responsible for all construction management
Establish regular coordination meeting
Study and Inspect for the correct Installation of Mechanical Equipment and pipe lines as drawing Perform final leveling /alignment of Equipment Flushing pipe line.
Prepare, Preventive Maintenance of all Equipment
Prepared data drawing and inspect spec material
Direct control for Installation procedure
INDIVIDUAL SKILLS
NO
DESCRIPTION
1
Able to operate a computer in windows and Ms. Office well
2
Maintenance with overhaul of almost all rotation Equipment and Machines. Very hard working ambitious and Self motivated
3
General work coordination and Maintenance obtain the highest possible performance. Plus include planning, Methodizing, and Supervision of craftsmen
4
Very experienced with installing of Rotating Equipment and Alignment of Coupling by dial Indicator, Tolerance and Specification.