LEO J. GARDOSE
Personal Data
Date of Birth : August 21, 1984
Age : 37
Gender : Male
Nationality : Filipino
Marital Status : Married
Current Location
Doha, Qatar
Contact No:
Email Address:
***********@*****.***
Languages:
English
Courses & Certificates:
1. ISO 9001:2015 Lead Auditor (CQI-IRCA Unique
Identification Number: 126125)
2. QEHS Internal Auditor – ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007
3. Quality Mark Manager (BCA Singapore)
4. Construction Quality Assessment Score- Manager (BCA Singapore)
5. Green Mark Manager (BCA Singapore)
6. BCSS (Building Construction Safety Supervisor)
7. WAH (Working at Height) for Supervisors
8. WAH (Working at Height) for Assessors
9. OPSOC (Oil/Petrochemical Safety Orientation Course) 10. Good Industry Practices – Aluminum Window
11. Good Industry Practices – Timber Doors, Wardrobe & Kitchen Cabinets
12. Good Industry Practices – Waterproofing for Internal Wet Areas
13. CONQUAS for Builders
14. Jotun Paint Training Course (Corrosion, Paints Technology, Surface Preparation, Application, Health and Safety, Calculation)
Software & Survey Equipment Skills:
1. Microsoft (Office, Excel, Project, Powerpoint)
2. Autodesk (Autocad, Land Desktop, Civil 3D)
3. Furuno Eco Sounder
4. Leica TC1250 & Nikon Total Station
5. Cal. Computer Digitizer
6. Surper (Surface Mapping System)
7. GUSlope (Saturated and Non-Saturated Seepage Flow and Slope Stability Analysis)
8. Surpac (Mining Software)
9. Primavera P6
Curriculum Vitae:
Professional Interests:
QA/QC Manager
Career Objective:
To associate with an industry that is rapidly expanding and support it with all my professional skills & knowledge, thereby become partners of success and to play the assigned role with an aim to go further professionally. Professional Summary
A positive and conscientious, highly motivated
professional, capable of working as a supportive team member or independently adopting a practical
approach using own initiative. Trustworthy, hardworking and reliable combined with highly developed
organizational skills and the ability to prioritize a substantial workloads with 16 years of formal experience as QA/QC Manager, QA/QC Engineer, Project Engineer spanning from building construction works, civil
engineering works, marine engineering works, enabling and shoring works, ground improvement works, dredging and reclamation works, railways, roads, bridges to mining industry and both qualified in technical and execution stages.
Education Profile
• TERTIARY
Bachelor of Science in Civil Engineering
University of Southern Mindanao
Kabacan, North Cotabato
June 2001-April 2006
1st Placer, Regional Philippine
Institute of Civil Engineers Quiz
• SECONDARY
University Laboratory School
Kabacan, North Cotabato
June 1997-March 2001
3rd Honorable Mention
• PRIMARY
Kayaga Elementary School
Kabacan, North Cotabato
June 1991-March 1997
1st Honorable Mention
Achievements
1. BOARD PASSER – Licensure Exam for Civil Engineer on November 19-20, 2006 at Cebu City given by the
Professional Regulation Commission, Republic of the Philippines.
Licensed Civil Engineer
Reg. No. – 0108515
www.prc.gov.ph
2. Initiate 3 companies such as Ammico Contracting Co. WLL, Penta-Ocean Construction Co., Ltd. – Myanmar
Branch, Planar One & Associates Pte Ltd (Singapore) to be certified as ISO 9001:2015 quality management
system.
3. Initiate 1 company such as Planar One & Associates Pte Ltd to be certified and awarded as BCA Green and Gracious Builders.
4. Certified IRCA ISO 9001:2015 Lead Auditor
CQI-IRCA Reg. No. - 126125
5. Certified Quality Mark Manager (Building and
Construction Authority of Singapore)
6. Certified Green Mark Manager (Building and
Construction Authority of Singapore)
7. Certified CONQUAS Manager (Building and
Construction Authority of Singapore)
8. MMUP UPDA Registered Engineer (Engineering and
Consulting Offices Accrediting Committee/Urban
Planning and Development Authority of Qatar)
Reg. No. – 26847
www.baladiya.gov.qa
WORK HISTORY
NO. COMPANY DUTIES AND RESPOSIBILITIES
1 Al Madar Contracting W.L.L. (QATAR)
Position : QA/QC Manager
Period : From Apr 2020 to Present
Address : P.O. Box: 2329, Doha - Qatar
Project : Construction of Site 04 Al Gharrafa Bus
Station (E-Charger Bus Station) (ASHGHAL
PROJECT).
: New Morning Studio at QMC TV 37
Project (ASHGHAL PROJECT).
: Construction of Health Center at Al
Sadd (Package 10) (ASHGHAL PROJECT).
: Construction, Completion and
Maintenance of Qatar Media Studio and
Admin Offices at 37 TV (ASHGHAL
PROJECT).
1. Preparation and submission of project site specific Project Quality Plan.
2. Responsible for overseeing the implementation and operation of the Project Quality Plan.
3. Responsible for supervision of the construction quality control management activities and ensuring compliance with the approved Inspection and Test Plans and
associated specification and contract documentation. 4. Responsible for preparation and submission of method statement, inspection and test plan, material submittal, pre-qualification documents of supplier and
subcontractors, material inspection request (MIR), work inspection request (WIR), proposed corrective action and closed out of NCR and SOR.
5. Carry out material inspection to ensure that materials are approved and they met the desired quality standard upon receipt, as well as with the sub-contractors. 6. Ensuring that the project Inspection and Test Plan (ITP) is briefed to and are being followed by the construction team.
7. Ensures required quality documentation is fulfilled and approved.
8. Initiating and maintaining check sheets / records for works.
9. Liaising with Site Engineer regarding work progress and hold point inspection.
10. Performing hold point inspection of finished parts. 11. Real time monitoring of on-going work activities. 12. Status reporting of work progress and readiness for inspection.
13. Submission of monthly QA/QC reports.
14. Submission of site QA/QC questionnaire.
15. Ensure all test reports are uploaded in LDTS.
16. Responsible for submission of handover deliverables through PDLM.
17. Responsible for the complete submission of project dossier during HANDOVER period.
2 Ammico Contracting Co. WLL (QATAR)
Position : QA/QC Manager
Period : From Apr 2018 to Apr 2020
Address : P.O. Box: 14330, Doha - Qatar
Project : Qeitaifan Island North Development
1. Head of QA/QC Dept. and assigned by Deputy CEO
to be QA/QC Manager for each project site.
2. Implement and ensure the continual improvement and effectiveness of company’s ISO 9001:2015, ISO
Project, The Marine Package 2A –Ground
Improvement Works
: Alar Hotel Development – Marine Works
:Katara Hills at Katara Project – Marine
Works
:Early Works Package (EWP) for Lusail
Plaza Tower (BP12) – Tower Plot A & C
:BP18A – Enabling Works for Mixed Use
Buildings, Commercial Boulevard
:Doha Port Redevelopment – Garden
District Package
:Doha Port Redevelopment – Mina Basin
Cut Package
: Doha Port Redevelopment – Sports
Marina & Container Park Package
: Doha Port Redevelopment Marine
Works (MTTAGN-2017-16) Dredging and
Aids to Navigation
: Mercedes Flagship Building Commercial
Complex (Square 1 & 2)
: QEWC Commercial Development at the
Marina District Lusail – Com53 Enabling
Works Package QEWC-KAHRAB Tower-
CP01
14001:2015, ISO 18001:2007.
3. Preparation of company’s QMS quality manual, quality procedures, project quality plan, checklists, etc. 4. Preparation of yearly ISO QMS internal audit plan and schedule.
5. Trained staff to be ISO internal auditors and ensure staff awareness on company’s quality management system.
6. Preparation of ISO internal auditor’s checklist based on company’s quality manual and quality procedure.
7. Conduct internal audit and management review for continual improvement and effectiveness of company’s quality management system.
8. Preparation and submission of respective project site Project Quality Plan.
9. Responsible for overseeing the implementation and operation of the Project Quality Plan at all levels. 10. Responsible for supervision of the construction quality control management activities and ensuring compliance with the approved Inspection and Test Plans and
associated specification and contract documentation. 11. Responsible for preparation and submission of
method statement, inspection and test plan, material submittal, pre-qualification documents of supplier and subcontractors, MIR, WIR, proposed corrective action and closed out of NCR and SOR.
12. Carry out material inspection to ensure that materials are approved and they met the desired quality standard upon receipt, as well as with the sub-contractors. 13. Ensuring that the project Inspection and Test Plan (ITP) is briefed to and are being followed by the construction team.
14. Ensures required quality documentation is fulfilled and approved.
15. Initiating and maintaining check sheets / records for works.
16. Liaising with Site Engineer regarding work progress and hold point inspection.
17. Performing hold point inspection of finished parts. 18. Real time monitoring of on-going work activities. 19. Status reporting of work progress and readiness for inspection.
20. Responsible for the complete submission of project document dossier during HANDOVER period.
3 Penta-Ocean Construction Co., Ltd. – International Civil Engineering & Building Construction Division Group (MYANMAR)
Position : QA/QC Manager
Period : From Mar 2017 to April 2018
Address : SEZ Thilawa Yangon, Myanmar
Project : Yusen Logistics Thilawa Project
: Myanmar Ajinomoto Foods Factory 1
Project
: Fujifilm Thilawa Warehouse Project
: Foster Electric Factory Project (Phase II)
: Myanmar Ajinomoto Foods Factory 2
Project
: NS Bluescope Lysaght Myanmar Plant
Project
: Construction of Flour Mill Complex at the
Thilawa Plot
1. Head of QA/QC Dept.
2. Implement and ensure the continual improvement and effectiveness of company’s ISO 9001:2015, ISO
14001:2015, ISO 18001:2007.
3. Responsible for quality assurance and quality control of the project.
4. Responsible for assisting the Senior Project Manager / Project Manager in setting up and implementation of the Company Quality Management System.
5. Assist Senior Project Manager / Project Manager in the preparation and implementation of the Project Quality Plan.
6. Overall in-charge in implementing and ensuring the company’s quality system and objectives are met in the Project.
7. Prepares and up keep Project Quality Plan updates. 8. Prepares new work instructions and procedures to suit the Project requirements and practice.
9. Maintains the Correspondence Register between POC
& SO and records action & status of letters to be replied. 10. Conducts training programmes to the Project Team
: Aktio Myanmar Co., Ltd.
Thilawa Branch & Factory
: Myarnak Factory II Project
: Wilmar CPP & TFS Project
: JFE Meranti Project Ruby
: Wilmar CPP & TFS Project
: Myanmar Thilawa Super
Hotel Project
: RK Steel Factory 2 Project
: GS Siam Project
: I&H Factory 1 & 2 Project
: Wilmar Jetty Project
on the Company’s Quality Management System.
11. Responsible for Quality Management System Audit. 12. Monitors and Records the Concrete Summary and
Cube Test Results.
13. Assists the Construction Manager in preparing the Master Construction Schedules and Updates status of work on these Schedules for Fortnightly and Monthly Reports.
14. Maintains the register of SOI and Site Instructions. 15. Maintains records of Man-Year Entitlement matters. 16. Monitors the Monthly Rainfall Data from
Meteorological Department.
17. Prepares the Site Progress and Status Summary for Monthly Site Progress Meeting with the Consultants. 18. Reviews the Daily & Fortnightly Report and Concrete Records during Construction Manager’s absence.
19. Responsible for supervision of the construction quality control management activities and ensuring compliance with the approved Inspection and Test Plans and
associated specification and contract documentation. 20. Responsible for preparation and submission of
method statement, inspection and test plan, material submittal and pre-qualification documents of supplier and subcontractors.
4 Planar One & Associates Pte Ltd (SINGAPORE)
Position : QA/QC Manager
: Management Representative
Period : From May 2014 to Mar 2017
Address : No. 9 Senoko Loop, Singapore 758172
Project : GC1 Guillemard HDB Project
: D2012 00282 Multi-Storey Vehicle
Storage @ Kranji DSTA Project
: BBN3C13 Bukit Batok HDB Project
: JWN7C15 Jurong West HDB Project
: LTA ER441 Project
: Singapore Power Project @ Jalan Besut
: Sengkang N3C28 HDB Project
1. Head of QA/QC Dept.
2. Responsible for BCA CONQUAS (Construction Quality Assessment Score).
3. Responsible for BCA Green Mark for Residential
Buildings and Non-Residential Buildings
4. Responsible for BCA Green and Gracious for Builders Scheme
5. Implement and ensure the continual improvement and effectiveness of company’s ISO 9001:2015, ISO
14001:2015, ISO 18001:2007.
6. Responsible for BCA Quality Mark
7. Responsible for assisting the Senior Project Manager / Project Manager in setting up and implementation of the Company Quality Management System.
8. Assist Senior Project Manager / Project Manager in the preparation and implementation of the Project Quality Plan.
9. Carry out regular briefings to POA Staff and new recruits on the Company & Project Quality Management System.
10. Carry out regular briefings to key sub-contractors and suppliers on the Company and Project Quality
requirements.
11. Conduct quality audits on sub-contractors and
suppliers as applicable.
12. Coordinate Internal Quality Audit and External Quality Audit activities at the Project.
13. Advise and assist all project departments to function in compliance with the Quality Management System and to the Client’s Requirements.
14. Ensuring that all QC activities are carried out by the designated staff as per work quality plan and ITP. 15. Conduct weekly Quality Meeting with POA and sub contractor’s staff.
16. Ensuring the control of receipt, distribution and maintenance of Project Documents.
17. Ensuring that all the relevant submissions are done in a timely manner.
18. Review 3rd party test reports in compliance to project specifications.
19. Responsible for supervision of the construction quality control management activities and ensuring compliance with the approved Inspection and Test Plans and
associated specification and contract documentation. 20. Responsible for preparation and submission of
method statement, inspection and test plan, material submittal and pre-qualification documents of supplier and subcontractors.
5 Logistics Construction Pte Ltd (SINGAPORE)
Position : Project Engineer Cum QA/QC Engineer
Period : Dec 2012 to May 2014
Address : No. 24 Kranji Road, Singapore 739465
Project : Addition and Alteration to Existing
Lakeside Primary School and Addition of
a 6-Storey Indoor Sports Hall on Lot 03894L
PT MK6 at 161 Corporation Walk (Jurong
West Planning Area)
: Proposed Additions and Alterations to
Existing Bukit Panjang Primary School,
Greenridge Primary School Building
1. Assist the Project Manager in overseeing the
construction activities and progress, planning &
scheduling, implementation, execution and monitoring of work schedule in accordance to the master and
detailed work programs.
2. Responsible for BCA CONQUAS (Construction Quality Assessment Score).
3. Responsible for BCA Green Mark for Residential
Buildings and Non-Residential Buildings
4. Liaise with Clients, Consultants, Sub-Contractor and Material Suppliers.
5. Assists the Project Manager in ensuring that
construction work is carried out according to schedule and to the required quality.
6. Ensures the timely preparation of the Master
Construction Programme & 3-Months Rolling Schedule and Monitors progress of work.
7. Ensures that quality works are being performed to Client’s requirements and specifications and according to Material/Work Quality Plan.
8. Resolves site encountered problems and Provides alternative proposals and solutions.
9. Reviews all third party test reports for compliance with the specifications and standards.
10. Reviews non-conformance reports (NCR) raised by his subordinates, initiate corrective action to the responsible vendor and follow up with the closing out action.
11. Reviews the Calibration Certificates of Inspection/ Measuring/ Test Equipment used during construction. 12. Reviews the Method Statements, prior to submission for Client’s approval.
13. Provides Contracts Dept. with any lost time and abortive works on site, due to Client’s design changes / instructions.
14. Reviews the Daily & Fortnightly Report prior to submission.
15. Develops and Updates the Site Layout Plan allocating material storage area, fabrication yard and other
facilities.
16. Reviews and Approves Day Works carried out by sub- contractors.
6 HSL Constructor Pte Ltd (SINGAPORE)
Position : Project Engineer
Period : May 2012 to Dec 2012
Address : No. 5 Gul Lane, Singapore 629404
Project : Wharf 6 Dolphin Capital Replacement @
Pulau Bukom Island – Shell Eastern
Petroleum Ltd.(Offshore Project including
Piling Works)
1. Assist the Project Manager in overseeing the
construction activities and progress, planning &
scheduling, implementation, execution and monitoring of work schedule in accordance to the master and
detailed work programs.
2. Liaise with Clients, Consultants, Sub-Contractor and Material Suppliers.
3. Responsible for controlling and coordinating sub- contractors’ works on Site, to achieve the targeted schedule and ensures that works are carried out as per Work Quality Plan.
4. Prepares construction schedules for their responsible areas to be observed by Sub-Contractors.
5. Carries out Inspection works and Maintains Joint Inspection Records with comments/approval by
Client/Consultant.
6. Reports non-conformance material/works noted to the Construction Manager for action, using NCR.
7. Studies and Advises on site construction encountered problems on site.
8. Assists in day to day site management co-ordination and liaison with Client and Sub-Contractors.
9. Prepares and submits SFR related to Site Works for the Project.
7 JV Al Omaier Trading and Contracting Company
& China Civil Engineering Construction
Corporation (SAUDI ARABIA)
Position : Project Engineer
Period : Dec 2009 to Jan 2012
Address : Riyadh, Saudi Arabia
Project : Saudi Railway Project from Az Zabirah
Junction to King Khalid Int’l Airport
1. Assist the Project Manager in overseeing the
construction activities and progress, planning &
scheduling, implementation, execution and monitoring of work schedule in accordance to the master and
detailed work programs.
2. Liaise with Clients, Consultants, Sub-Contractor and Material Suppliers.
3. Responsible for organising and co-ordination of all the construction activities in accordance with the
construction schedules while constantly monitoring the status of planning & quality activities.
4. Ensures all construction activities are performed in conformance with the requirements of the relevant
inspection and test plans, specifications, codes and standards and timely manner.
5. Provides a lead role in overall safety, planning, and maintenance of quality management system and
progress of the construction.
6. Responsible for planning, execution and monitoring of day to day activities with the subordinate staff.
7. Responsible for the execution and completion of all mobilisation activities on time.
8. Co-ordinate work activities with sub-contractors, suppliers and Govt. Agencies as required.
9. Monitoring of progress on a short term basis (weekly) and take actions to eliminate causes of delays.
10. Review daily and weekly reports and weekly and monthly schedules.
11. Ensuring that preparation, maintenance and
monitoring of Preventive Maintenance Schedules and Preventive Maintenance Records of the Construction Plant and Equipment at site.
12. Ensuring that proper disposition of non-conforming products and works.
13. Review of Calibration Certificates of the IMT
Equipment to verify for the suitability of them for the intended work.
14. Issuing Corrective Action Requests to the Sub
Contractors and Suppliers due to repeated non-
conformances.
15. Ensuring that necessary temporary infrastructure facilities are in place and are maintained.
16. Conduct meetings as per the meeting schedules and maintain their records.
17. Review Method Statements submitted by sub-
contractors.
18. Co-ordinate and execute statutory inspections and final hand over inspections.
19. Assist Project Manager in evaluating Vendor
Performance.
20. Assist Project Manager in ensuring handing over of all relevant documents and quality records for long term storage.
8 CM Pancho Construction Incorporated
(PHILIPPINES)
Position : Project Engineer
Period : Oct 2009 to Dec 2009
Address : Quezon City, Philippines
Project: Hotel Masfino (Luxury Hotel)
1. Assist the Project Director in overseeing the
construction activities and progress, planning &
scheduling, implementation, execution and monitoring of work schedule in accordance to the master and
detailed work programs.
2. Liaise with Clients, Consultants, Sub-Contractor and Material Suppliers.
9 David M. Consunji - Construction Equipment
Incorporated (PHILIPPINES)
Position : Mine Planning Engineer
Period : Apr 2009 to Oct 2009
Address : Semirara Is., Philippines
Project : Panian Mine – The largest open cut coal
mine in Southeast Asia
Position : Mine Surveyor/ Cadet Engineer
Period : Jan 2007 to Apr 2009
Address : Semirara Is., Philippines
Project : Panian Mine – The largest open cut coal
mine in Southeast Asia
1. Prepares long term, medium term and short term
mining plans and mining schedule for the full time utilization of the truck and shovel fleet of Panian Mine-the largest open-cut coal mine in the Philippines.
2. Liaise with Clients, Consultants, Sub-Contractor and Material Suppliers.
1. Conduct terrestrial and hydrographic survey.
10 Department of Public Works and Highways –
Region XII
Position : Student Trainee
Period : Apr 2004 to May 2004
Address : Kidapawan City, Philippines
Project : Makilla Link Road
1. Trained in designing of Roads and Highway.
2. Trained in Roads and Highway Survey.
3. Trained in designing of Bridges.
CHARACTER REFERENCE
NO. NAME & POSITION COMPANY & CONTACT
1 Mr. Muzaffar Anjum
Deputy General Manager
Ammico Contracting Co. WLL
Email: ********.*****@******.***
HP No. +974-****-****
2 Mr. Takehiko S. Hirai
General Manager
Penta-Ocean Construction Co. Ltd – International Civil Engineering & Building Construction Division Group. Email: *********.*****@*****-*****.***.**
3 Mr. Lai Yoong Heng
Deputy Managing Director
Planar One & Associates Pte Ltd
Email: ************@*********.***.**
HP No. +65 86886887
4 Mr. Dimson Batanan
Project Commercial Manager
Bombardier Transporation
Email: ******.*******@****.**********.***
HP No. +65 87883074
5 Mr. Quek Bak Hong
Managing Director
Mr. Daniel Chong
Senior Project Manager
Logistics Construction Pte Ltd
Email: ***********@****.***.**
Email: ***********@****.***.**
6 Mr. Derian Peter Quek
Project Manager
HSL Constructor Pte Ltd
Email: ******@***.***.**
7 Mr. Saleh Al Olaiyan
Project Director
JV Al Omaier Trading and Contracting Co., and China Civil Engineering Construction Corporation
8 Mr. Manuel L. Vardeleon
Department Head
CM Pancho Construction Incorporated
9 Mr. George G. San Pedro
Resident Manager
David M. Consunji - Construction Equipment Incorporated
(Semirara Mining Corporation)