CURRICULAM VITAE
E-mail: *************@*****.**.**
Mobile : +91-989******* (whatsup), +964 780-***-****
Reference : Mr.Vincenzo Cascino, (********.*******@***.***)
Electrical Supervisor,ENI, IPF – ZUBAIR, RAFIDIYA
SANTHANA GOPALAN.K
OBJECTIVE
An enthusiastic and highly motivated individual of a hard working nature and technical orientation wishing to pursuer a challenging career in OIL & GAS FACILITIES Construction, Installations, Pre-Commissioning, Testing & Commissioning of Electrical Equipments, Switchgears, Diesel / Gas Gensets Power Plant, Plant Auxiliaries and HT/LT Power Distribution, Automation and pneumatic systems
TECHNICAL QUALIFICATION
Bachelor of Engineering in Electrical and Electronics Engineering Discipline from 1995-’99, Manonmaniam Sundaranar University, Tirunelveli, Tamil Nadu, India.
ACADEMIC QUALIFICATION
HSC on March-’95 from S.M.S.M Hr.Sec.School, Suchindrum, Kanyakumari Dist Tamil Nadu, India with 78.16% of marks.
SSLC on April-’93 from Govt. High School Ezhakaram, Nagercoil, Kanyakumari Dist. Tamil Nadu, India with 85.2% of marks.
AUTOMATION KNOWLEDGE
PLC – KEYENCE, OMRAN, AB, ABB, SIEMENS, GE FANUC
SCADA – INTOUCH, ABB, WINCC (SIEMENS)
HMI – ABB, SIEMENS
VFD – ABB, SIEMENS
DCS – ABB, SIEMENS, HONEYWEL
OVERSEAS TRAINING
CUMMINS CERTIFIED TRAINING COURSE AT CUMMINS INC, DAVENTRY, UNITED KINGDOM FOR
1.QSV81/91 (14/15 Bar) GAS ENGINE GENSET – QUALIFICATION
2.HHP LEAN BURN ‘V’ ENGINE GAS CONTROLS STELLAR – QUALIFICATION
SAFETY TRAINING FROM QATAR INTERNATIONAL SAFETY CENTRE, QATAR
1.HYDROZEN SULPHIDE (H2S) / BREATHING APPARATUS (BA) CERTIFICATE
2.CONFINED SPACE ENTRY AWARNESS
KEY SKILLS
●Installations & Constructions, Pre – Commissioning, Testing & Commissioning of Electrical Equipments, Switchgears, Power plants and power Distribution in Oil & Gas Facilities with all required HSE requirements, as per approved technical drawings and specifications and project schedule and budget.
●Handling of equipments like Natural Gas Compressors & Dispensers, Bio-Gas Gasifiers, Diesel / Gas generators, Power & Distribution Transformers, HT/LT Switchgears, MCCs, Power & Control cabling, Cable trays, cable laying, terminations, DC Systems, ( BOP) Balance of plant equipments.
●Make sure that the installed all materials are certified as per the project specifications and standards
●Identifying the deviation of work from specification and punch lists generation.
●Coordination and handling of contractors.
●Manpower handling
●Good command and communication over English in both verbal and writing.
●Good team leader and team player with international suppliers/ contractors/consultants/clients.
●Manpower planning and resource allocations..
●Task completion within given time.
●Work schedule planning and target achiever.
PROFESSIONAL CAREER EXPERIENCE
Total No. Of Years: 21 Years.
From Oct’ 2020 To Till Now
SPM OIL & GAS (A CATERPILLAR GROUP), BASRA, IRAQ
GAS TURBINE POWER PLANT PROJECT :
ELECTRICAL SUPERVISOR – Gas Turbine power Plant Operation & Maintenance
Project – 750MW Gas Turbine Power Plant and 132KV Substation Operation & Maintenance
Client – ENI, ITLY
Owner - Zubair Field Oil Development (ZFOD) IRAQ
Site - Zubair Oil Field Permanent Power Generation.
Role & Responsibilities
Operation and Maintenance & troubleshooting of ALSTOM 4 X 189MW GT1382 Gas Turbine Power Plant and its auxiliaries like lube oil system, ventilation system, fuel oil system, WTP, cooling towers, etc.
Operation and Maintenance & troubleshooting and switching operation of MV/LV switchgears and AC ( 230VAC) & DC ( 110VDC) UPS
Operation and Maintenance of 4 X 2000KVA, 6KV CAT Black Start DGs
Operation of control and relay panel and switching operation of 132 KV HV switch yard having Overhead transmission lines exporting power to Grid and 4 X DGS Substations.
Spare parts planning and maintaining inventory
Handling of 4 No DGS HV subtations.
GAS COMPRESSORS PACKAGE PROJECT :
From Aug’ 17 To June 2020
ELECTRICAL ENGINEER – ROTATING MACHINE MAINTENANCE (Rotation : 28 / 28)
Project - Gas Compressor Package Operation & Maintenance at Initial Production Facilities
Client – ENI, ITLY
Owner - Zubair Field Oil Development (ZFOD) IRAQ
Site - IPF-HAMMAR, IPF-ZUBAIR, IPF-RAFIDIYA
Role & Responsibilities:
Operation, Troubleshooting, Preventive, Scheduled & Corrective Maintenance of ARIEL make Reciprocating Gas Compressors driven by Natural Gas fuelled WAUKESHA series Four Natural Gas Engines.
Operation, Preventive, Scheduled & Corrective Maintenance of LT motors
Maintenance and troubleshooting of CENTURIAN PLUS 100 PLC & MURPHY control panel
Apply RCA to avoid frequent failure of equipments
Develop risk control process, Task application for work permits and maintain expertise in equipment maintenance
Implementation of PTW and LOCK OUT/TAG OUT systems.
Prepare Preventive Maintenance Procedures, job plans, method of statements, shutdown / overhaul lists, attends shutdown meetings, monitor progress of shutdown activities and reports daily status.
Following of standard HSE rules and regulations and applicable standards.
Routine condition monitoring of equipments and implementing developments.
Coordinating with other discipline maintenance teams for quality delivery of support.
From Jan’18 To Jun”18 (6 months Turnaround project)
ELECTRICAL ENGINEER – QATAR PETROLEUM - REFINARY TURNAROUND PROJECT
MADINA GROUP LLC, QATAR
Turnaround Activities:
●Worked under Project / Engineering Department
●In association with ABB, Installations and commissioning of ATS (Automatic Transfer) panels in EDG (Emergency Diesel Generators) switchgears by configuring GE SR750 Relays
●Scheme & interlock checking and real testing for ATS systems.
●Installation and commissioning of Desalination plant control panel
●Installations and testing of Earth Leakage Relays and Core Balance CTs (CBCT) in MCCs of Nitrogen plant and other MCC switchgears.
●Testing and calibration of all protective relays in 11KV/3.3KV/415V switchgears.
●Preventive Maintenance of Power / Distribution Transformers, HT/LT switchgears, HT/LT motors
From Feb’ 16 to Nov ‘ 17
PROJECT ELECTRICAL ENGINEER
ALBARAMI GROUP - GLOBAL CHEMICALS & MAINTENANCE SYSTEMS LLC, OMAN. – EPC CONTRACTOR
PROJECT:
WARTSILA DIESEL ENGINE POWERED 48MW POWER PLANT WITH 11/33KV AND 33/11KV SUBSTATION.
EPC CONTRACTOR: Global chemicals & Maintenance Systems LLC, Oman
EPC’s CONSULTANT : Energoprojekt Engineers Entel LLC, Oman
CLIENT : Rural Area Electrification Company (RAECO)
CLIENT’s CONSULTANT : Monenco Consulting Engineers. Oman.
PROJECT COST : 60 Million USD
From July’ 13 to Dec’ 15
SITE ELECTRICAL SUPERVISOR
CUMMINS ESB NIGERIA LTD (GENTEC PLC), UNITED KINGDOM. – EPC CONTRACTOR
PROJECT:
10 MW CUMMINS GAS / DIESEL GENSET POWER PLANT AT WARRI, DELTA STATE,NIGERIA.
MAIN CONTRACTOR : SAIPEM, ITLY
12 MW CUMMINS GAS / DIESEL GENSET POWER PLANTAT PORT HARCOURT, DELTA STATE, NIGERIA
MAIN CONTRACTOR : JAD GROUP CONSTRUCTION LIMITED, NIGERIA
From April’ 10 to April ‘13
PROJECT ELECTRCAL ENGINEER
GREEN GAS LTD, BENIN CITY, NIGERIA – GROUP COMPANY OF NATIONAL INDEPENDENT PETROLEUM COMPANY (NIPCO) PLC, NIGERIA
PROJECT:
NATURAL GAS CITY GATE STATION, DISTRIBUTION, COMPRESSING AND DISPENSING STATIONS.
8 MW PERKING GAS GENSET POWER PLANT
From Jan’08 to Jan’ 10
INSTALLATION & COMMISSIONING ENGINEER – ELECTRIC POWER GENERATION – OIL & GAS
MOHAMMED ABDUL RAHMAN AL-BAHAR, SHARJAH, UNITED ARAB EMIRATES – DEALER FOR CATERPILLAR IN MIDDLE EAST
PROJECTS:
8 MW POWER PLANT AT PETROFAC
14MW POWER PLANT AT Oman
12 MW POWER PLANT AT KNPC
From Mar ’05 to Nov ’07
PROJECT ENGINEER
ALMOAYYED INTERNATIONAL GROUP, BAHRAIN - EPC CONTRACTR
PROJECTS:
6 MW MITSUBISHI GENSET POWER PLANT AT BAHRAIN PETROLEUM COMPANY (BAPCO)
10 MW MITSUBISHI GENSET POWER PLANT AT U.S MILITARY BASE.
15 MW MTU GENSET POWER PLANT AT KING HAMAD HOSPITAL.
From June 1999 – Dec ’04.
SITE ENGINEER – GAS POWER PLANT O & M
GMMCO LTD., CHENNAI, INDIA - C.K BIRLA GROUP OF COMPANY AN AUTHORIZED DEALER FOR CATERPILLAR IN INDIA.
PROJECT :
3MW GAS POWER PLANT
ELECRICAL EQUIPMENTS INSTALLED & COMMISSIONED:
Switchgears :
33KV Siemens GIS, 11KV AIS, 11KV VCB Schneider Incoming Breaker panel With SEPAM Protection Controller (with future expansion), 11KV SF6 outgoing feeder panls, 415V LV Dist. Panels, MCC panels & Frequency converter panel for Radiators, VFD panels, PCC for Black Start Diesel Generators.
Control Panels:
Common & Plant control panels, Engine Auxiliary and local control panels for Wartsila Gensets, 33KV Control & Relay panels, Capacitor bank panels,
Cable Trays:
Fabrication & Installation of Cable trays, ladders and raisers for power & control and instrumentation cables
Cables:
HV (33KV & 11KV) and LV cables pulling, laying and Control & Instrumentation cables laying
Transformers:
11KV/33KV Power Transformers: 20 MVA, 12 MVA
33KV/11KV Power Transformers: 15 MVA
11KV/415V Aux. Transformers : 2 MVA, 1.5 MVA, 1 MVA
Capacitor banks : 5 MVAR
DC System : 30 V & 110V DC systems
Natural Gas City Compressors and Dispensers.
Automation Systems : PLC Panels, RTU Panels, Field Instruments.
Diesel & Gas Generators :
Wartsila : 11KV, 8MW
Cummins : KTA, VTA, QSK60, QSV91G Models.
Caterpilar : 3408, 3412, 3512,3516 Models
Mitsubishi : 1 MW
Plant auxiliaries:
Remote radiators, Air start system, Automatic lube oil system, air Compressors & dryers, RO Plant, Ventilation system, LFO chillers, LFO Transfer system, Charge air filters, Pneumatic panels, Air Receiver,, Blowers, Chillers, Cooling towers, Cooling tower Pumps, Over head crane,, Ventilation system,
Building Electrification & HVAC :
Lighting, small power, Split Air condition Distribution boards, DC distribution boards, Wiring, lights and DC emergency lights, Fire &smoke detectors, CTV, HVAC package units, lightning
Arresters.
Plant Safety Equipments : Gas Leakage, Smoke & Fire Detection system.
RESPONSIBILITIES :
●Installations & Contructions, Pre-Commissioning, Testing & Commissioning of 6 X 8MW (11KV) Wartsila Diesel Genset Power Plant with power plant auxiliaries at RAECO, Oman.
●Entire handling of project site for execution, installation & commissioning of, 10 MW & 12MW Gas/Diesel Genset based power plant with QSV91G (11KV)/ QSK60 Model CUMMINS Gas / Diesel Gensets and power plant auxiliaries at Saipem project, Warry, Delta state, Nigeria and at Chevron Nigeria, port Harcourt, Nigeria.
●Installation, Pre Commissioning, Testing & Commissioning of Natural Gas City gate station, Compressing & Dispensing stations with all auxiliaries.
●Installations, Testing and Commissioning of PLC Automation Panels, Field monitoring & Process Instruments and RTU Panels.
●Installation, Pre Commissioning, Testing & Commissioning of Caterpillar driven Gas Compressors, PERKINS Gas Generators based power plants, Diesel Gensets for Black start, PMRV at distribution site, Flow meters, UPS, Battery Systems, Gas line strainers and filters, Gas Dispensers.
●Handling of Installation and Testing & Commissioning of Caterpillar Diesel Genset packaged Power plants in Oil & Gas companies
●Installation & Testing & Commissioning of 6 MW Mitsubishi Genset power plant at BAHRAIN PETROLEUM COMPANY(BAPCO)
●Installation & Testing & Commissioning of 10 MW Power plant project of 3512 model CATERPILLAR and QSK Model CUMMINS DIESEL GENSETS POWER PLANT. for US MILITARY BASE, Bahrain
●Installation, Testing and Commissioning of 15X1 MW MTU Diesel Generators power plant at KING HAMAD HOSPITAL, Bahrain
●Installation Testing & Commissioning of Natural Gas Based CAT 3512 Model 3MW Power plant and 11KV/415V substation in India.
●Supervise contractors and sub- contractors for proper installation and construction with all required HSE regulations ans as per the project specifications and standards
●Adhere all the required HSE requirements for the project execution.
●Make sure electrical works like cable trays laying,cable pulling, terminations and equipment installation, are carried out in compliance with approved project drawings, specifications and applicable international codes and standards.
●To check installed materials are certified and approved and in compliance with project specifications and applicable standards.
●Highlighting any deviations of work done and reporting if any.
●Assisting for Technical support, troubleshooting and technical solutions during the entire project execution
●Validate the progress of electric works.
●Ensure that electrical works and punch lists are properly detected and integrated within the mechanical completion master punch list.
●Assisting the project as a member of the team for overall electrical installations & Commissioning.
●Coordination with other project departments for safe and effective integration of activities.
●Reviewing and understanding of project documents, specifications and drawings like equipment layouts, cable tray layouts, cable routines, indoor & outdoor lightings, switchgear room layouts, equipment datasheets, power & control cable schedules and terminations, equipments & plant earthing before installation & commissioning execution.
●Preparation of method statements, procedures for jobs executed.
●Carrying out tests like megger, resistance check, hi pot, earthing resistance, CT & PT tests during pre- commissioning for the all electrical equipments installed.
●Installation & Testing & Commissioning of power and distribution transformers, HV / LV switchgears, Bus ducts, PCCs, MCCs, Control panels
●Preventive and corrective maintenance of all associated electrical equipments.
●Ensure quality control check of equipments installed during construction.
●Supervising and issuing approval for jobs done by the sub contractors.
●Planning, scheduling, conducting and coordinating the technical and management aspects of the project
●Planning of work schedule on weekly / daily basis and handling of supervisors, foremen, technicians and labours
●Liaising and coordinating with Vendors / Contractors for installation, erection and Commissioning of all associated equipments within the area of response.
●Witnessing out for FATs & SATs for all the electrical equipments installed prior to commissioning.
●Coordinating with contractors for proper supply of tools & tackles, skilled man powers and labours for site execution work.
●Fabrication & Installation of Cable trays, ladders and raisers for power & control and instrumentation cables as per design with good looking manner.
●HT & LT power cables, control & Instruments cables laying as per approved cable schedules and dressing, tagging as per standard and testing of joining and terminations as per standard.
●Loop & continuity cross checking of control circuits of switchgers.
●Earthing for all plant equipments, buildings, earthing grid and pits for complete plant layout.
●Installation of junction boxes, Fire proof DBs, Lights.
●Installation as per IFC (Approved) drawings.
●Issuing approval for HOT/COLD jobs, equipment LOCK OUT TAG OUT during pre commissioning & commissioning.
●Coordinating with Client’s consultant for smooth site installations and for any modification works as per site conditions.
●Preparing of RFI (Request for Inspection) after each site activity completion and getting approval from the consultant.
●Coordinating with EPC consultant for review and getting approved drawings on time.
●Ensure the Installation & commissioning activities are in line with the project specifications, approved drawings with good engineering and quality & standards.
●Coordinate & conduct meeting with consultant & sub contractors to discuss about project progress and solution for obstacles internally & externally with good technical aspects.
●Preparation of daily/weekly/monthly progress reports
●Monitoring and tracking of materials consumed and planning and placing order for required materials for site execution.
●Ensure the safety of the project in the area of responsibility.
●Entire handling of manpowers, day by day activities for project execution.
●Preparing schedule for each site activity considering available resources and completion within time.
●Load trial for the gensets using Load bank
●Dealing with international suppliers for prompt time delivery of equipments and installation, commissioning.
●Operation & Maintenance of perkins & Cummins diesel gensets utilized for Black start and site power supply.
●Maintaining, filing all the documents with respect to all site activities
SOFTWARE PROFILE
Platform : MS-DOS, WINDOWS 9X, 2000.
Languages : Java,HTML,UML,EJB,JSP.
RDBMS : MS-SQL Server 7.0.
Packages : MS-Office
PERSONAL DETAILS
Father’s Name : Late.Krishnamoorthy.V,Rtd.Teacher.
Sex : Male.
Age & Date of Birth : 42, 25th June 1978.
Marital Status : Married.
Nationality : Indian.
Passport Details : Z5254975, Valid up to 25/06/2029
Religion : Hindu
Spoken & Written Skill : Tamil,English,Malayalam,Hindi
Permanent Address : 51, Vagayadi Neerazhi Street, Kottar, Nagercoil,
Kanyakumari Dist. – 629002, Tamil Nadu, India
e-mail:*************@*****.**.**
Skype : gopal1728
Mobile: +964 780-***-****
+91-989******* (whatsup)
Reference : Mr.Vincenzo Cascino,
Electrical Supervisor,ENI, IRAQ. (********.*******@***.***)
IPF – ZUBAIR, RAFIDIYA