William Gautani
SAP # ********
Caingin Maragondon Cavite Philippines 4112
********@*****.***
MEP MANAGER
I am a friendly, approachable and hard-working with over 13years’ experience in the industry of Construction and Facility Management therefore have an extensive knowledge of Electrical & Instrument (Oil & Gas) and MEPF services and design. I have a good understanding of the business and the project requirements, starting from the initial ground works right through the construction stage to testing and commissioning, inclusive of providing strategic planning for a project so that it is delivered on time, to the required quality and on budget. I’m skilled in managing the design team and construction works of multimillion dollar projects meeting top and bottom-line objectives. I am a creative leader and team player, who through a collaborative approach creates robust strategies that translates the design vision into reality. I have strong analytical, conceptualisation and decision-making skills in addition to a passion for seeing that work is well done. I strive to build productive partnerships with the contractors and tradesmen on a project using my excellent communication skills while at the same time passing on my knowledge to the local craftsman.
CORE COMPETENCIES & KEY SKILLS
Construction Management & Coordination QA/QC Management MEPF Operational Development Testing and Commissioning Training and Development Project Cost Estimation and Negotiation Interdepartmental Liaison Maintaining, Updating and Implementing Company Standards Project Scheduling and Resource Assignment Quality and Productivity Improvement Performance Evaluation Site Coordination People Management and Team Building Performance Evaluation Quality and Productivity Improvement Communication Skills EMPLOYMENT HISTORY
COMMTECH ASIA PHILIPPINES
Construction Management
MEP Manager (MC Tower Hotel Team Leader) 2016 – July 30, 2021 (OKADA MANILA HOTEL & CASINO) Lead and Communicate with Site Management, Contractors and Vendors to assist them in working to the Project Schedule as it pertains to MEPF, build effective working relationships with clients and the Company project team members. Project Start-Up, Review the general contract. Contract documents and confirm the project milestones in conjunction with Project Lead, attend all schedule and management MEPF meetings (Completion schedule, Drawings, Design aspect and others which affect the Construction schedule) necessary to monitor and manage the project, chairing as appropriate, Review subcontractor references, obtain Subcontractor bonds, and maintain project files ATLANTIC, GULF & PACIFIC COMPANY OF MANILA INC
E&I QA/QC -Supervisor Specialist 2015 - 2016
Ichthys’s Onshore LNG Facilities for Darwin Australia San Roque Bauan Batangas Philippines E&I QA/QC -Supervisor Specialist. Responsible for Daily Monitoring of MEP and Fire Alarm system activities also ITR (Inspection Test Report), Daily coordination with client (JKC) and Construction Department for daily work accomplishment, Preparation for required inspection activities using latest reference documents, Reviewed the completeness of all documentation needed for inspection, Performed joint inspections and witness testing, Pre- commissioning and Commissioning activities with client and vendors as per the Project Standards and Specifications. DYNA-MAC KEPPEL PHIL, INC. SUBIC PHILIPPINES
E & I QA/QC Inspector/ Pre-commissioning Supervisor 2014 - 2015 March 26, 2014 up to January 15, 2015Shell Exploration Malampaya Phase 3 Project Philippines. E & I QA/QC Inspector/ Pre-commissioning Supervisor. Overseeing and reviewing detailed engineering and Construction Design in conformance with the project requirements and assist in resolving engineering and technical site issue. Conduct site surveillance, visual and detailed Inspection of EX equipment, MCC high and low voltage as per ITP and Preparation of documents; such as
(RFI) Request for Inspection, (ITR) Inspection test report, (MIR) Material Inspection report and other related Engineering drawing. Mentoring Construction Personnel towards Quality and Project Flawless delivery and ensuring that (DEP) Design Engineering Practice and Project Specification and HSE requisite meet the minimum requirements, participate tool box talk for every activity.
Br. CAT International Ltd
E & I QA/QC Inspector 2012 - 2013
with SAP # 70015076. Saudi Aramco oil upstream Maintain Potential Project. Daily routine Site Inspection, Surveillance and Preparation of Request for Inspection (RFI) for the prepared daily accomplishment on Construction Site and daily coordination to the construction Department and Saudi Aramco Project Management Team with the Saudi Aramco Project Inspection Division and discussing the governing standard and Policy Implemented on site, deviation on site accomplishment compare to the specific and corresponding document. Target Rotary LLC
Electrical Estimation Engineer (MEP) 2010 - 2011
Preparing bill of quantities, tender estimated for Construction package of New Doha International Airport (NDIA), coordination to material procurement and to the supplier. Close coordination with the client and consultants for any amendments and tender instruction. Responsible for the estimation and interpretations of plan and specification. Preparing materials based on project cost allowance as per specification. YANSAB Olefins
QA/QC Engineer/ Pre-commissioning Engineer 2008 - 2009 1 Project Yanbu, Saudi Arabia Yanbu National Petrochemical Company (Yanbu Sabic) Technip Italy S.p.A / Carlo Gavazzi Arabia Co. Ltd. June 2008 - July 2009QA/QC Engineer/ Pre-commissioning Engineer. Develops and initiates standards and methods for inspection, testing, and evaluation. Plans and conduct the analysis, inspection, design, test, and/or integration to assure the quality of the assigned product or component. Devises sampling procedures and designs and develops forms and instructions for recording, evaluating, and reporting quality and reliability data. Establish program to evaluate precision and accuracy of production equipment and testing, measurement and analytical equipment and facilities. Performs quality engineering reviews of design documentation for compliance with stated requirements, including vendor quality manuals and company quality records. Reviews all purchased products or components and provides input to the decision to accept the product and future purchases from the vendor. Documents data obtained during all quality activities consistent with company policies and procedures. Develop new approaches to solve problems identified during quality activities. Communicates significant issues or developments identified during quality activities and provide recommended process improvements to management. Prepare reports to communicate involvement and results of quality activities. Prepares and presents technical and program information to team members and management. Directs technical and administrative workers engaged in quality activities. Maintain a working knowledge of government and industry quality codes and standards.
Technicas Reunidas S.p.A / Carlo Gavazzi Arabia Co. Ltd Electrical Engineer 2007 - 2008
Preparation of Electrical motor package. Prepare for the electrical motor vendor detail. Prepare for the cable test result done by QA/QC Testing crew. Conduct ocular inspection to the motor and prepare for the clearance needed. Prepare for No Load Run Test. Conduct activities in accordance with the project QA manual and Quality Inspection Plan. Prepare daily QC records and final inspection if required. Documentation and control of inspection reports and test records. Control, maintain, check and monitor calibration status of all measuring and test equipment. Evaluate inspection and test reports. Assist project supervision and implement Quality Control instructions and procedures to meet quality requirements. Interface with Project Management Team, and Client Inspection Unit. Witness /Perform / Inspection / Random surveillance for various electrical work / instrumentation installation activities. Ras Lafan Industrial City
Electrical Engineer 2005 - 2006
Manpower scheduling, manpower distribution/monitoring. Prepare for the approved construction drawing. Ensure the safety and security of the employee. Daily routine site inspection of construction group for electrical and instrumentation works. Sees to it that the works are done according to the Approved for Construction drawings and specifications, and contractual standards. Preparation of RFI when work is ready for final inspection by client. Monitoring of corrective action when there are non-conformities or Punch list. Inspection of incoming electrical and instrument materials and equipment's.
Food Manufacturing Plant
Production Supervisor 2004 - 2005
Manpower scheduling / monitoring, product line monitoring. Ensuring manpower safety and security. Monitoring for the product safety and security.
Meralco
SBU Engineer 2002 - 2003
System analysis, validation of location capacity, connectivity and updates connected services of transformers. Ensure data is updated and reliable at all times. Gathers additional needed for transfer or upgrades distribution transformers. Conduct ocular inspection of deteriorated transformers electrical distribution lines and designed the possible overloaded transformers for spur loading. Training and Seminars• Transmission & Distributions System PERSONAL INFORMATION
Birth Date: December 18, 1976
Status: Married
Education
Polytechnic University of the Philippines,
Bachelor of Science in Electrical Engineering
Graduated - April 2002
Training and Seminars
● Transmission & Distributions System
Polytechnic University of the Philippines
August 22, 2001
● Work Bench
Polytechnic University of the Philippines
September 15, 2001
● Testing and Balancing – Air system
Okada Manila Construction Office.
April 15, 2021
Professional Skills
ENGINEER: Advanced
QA: Advanced
RFI: Advanced
DOCUMENTATION: Advanced
SITE INSPECTION: Advanced
MEP: Advanced