Post Job Free

Resume

Sign in

Mechanical Engineer Power Plant

Location:
Erbil, Iraq
Posted:
June 21, 2022

Contact this candidate

Resume:

C.V

ABDULKAREM SABIR AHMED

Rasty, St***, Erbil,

adrhd1@r.postjobfree.com. +964 075********

CORE COMPETENCIES

Engineering background (mechanical, electrical, industrial)

Management skills

PMC and EPC overall evaluation and control

Project Mechanical Completion follow up

Quality Management, (QA/QC) documentation

Contract documentation and Delegation

Construction team leadership

Maintenance scheduling

Engineering training and capacity building

Material control

EDUCATION PROFESSIONAL EXPERIENCE

BSc. in Mechanical Engineering, University of Technology, Baghdad, Iraq. 1979-1983

PMP Training Course –Erbil C.N, N0. 62 Samalfager Institute. ADDITIONAL SKILLS

AutoCAD, MS Project, and Office MS (Word, Excel, PPT)

Languages;

1. Kurdish; Mother tongue,

2. English; Speaking, understanding, reading, and writing, 3. Arabic; Speaking, understanding, reading, and writing, 4. Turkish; Speaking and understanding.

Engineering programs

1. Firefighting systems

2. HAVC systems

3. WS and WD1 systems(Epanet)

1 Water supply and distribution systems

PROFESSIONAL PROFILE

Training & Capacity building

1) O&M (Operation and maintenance).Training and capacity building and course material preparation Mosul WD and DRC2 (Theory and Practice). Attendants; - engineering staff.

2) O&M (Operation and maintenance) capacity building.

Fundamentals of hydraulics,

pump selection for piping systems,

Hydraulic design of WTP3.

3) O&M (Operation and maintenance). Capacity building, operation of Pump Stations operation and Maintenance

Mosul WD and DRC (Theory and Practice)/ maintenance department. Attendants; - operation and maintenance staff.

The training courses covered the followings as well;

Operation of WTP facilities

Maintenance types

HSE requirements.

4) The training courses to the MOE staff at Khabat Thermal power plant. The course covered; -

Steam Boilers,

Steam turbines,

Water cycle,

Balance of plan in the project,

HVAC and firefighting.

5) Lecturer Kirkuk Technical Institute, Mechanical Department. 1993-1995

Maintenance material for both of the first and second stages

Theoretical and Practical

AS LEAD AND CONSULTANT MECHANICAL ENGINEER IN PROJECTS A. Khabat/ Erbil/Iraq. Thermal power Plant unit 1&2, 300 M.W. Mechanical department manager, as consultant;

1Apr2015 – 31Aug2018, ILF company (Consulting Engineers).

Construction Documents review, the position covering, but not limited to; 6) specifications,

7) drawings (PID, ISO), and

8) bill of materials.

2 Danish Refugee Council

3 Water Treatment Plant

Construction Site activities.

Boilers & Fuel system supply (diesel & HFO)

Fuel Tank farm

HP turbine and IP turbine,

ESP4 and Ash handling unit,

FGD5 and facilities,

Cooling tower and facilities,

Closed cooling system,

Intake and water supply system,

(W & WWTP), Including tanks, piping and pumping system,

BOP6 system including,

a) HVAC (AHU & VRF),

b) Firefighting system,

c) Hydrotest for high & low pressure installed pipes, d) H.O7 package review & control, (P&ID and ISO drawings) for above disciplines

e) Cranes and hoists (temporary and permanent)

Q.C discipline as a part of Precommissioning documentation

TOP8 dossiers review & control, (P&ID and ISO drawings)

Construction Punch classification and closing,

RCA9,

MoS10,

ITP11,

Review of As-built drawings,

(FAT) and (SAT)12

Preservation planning as per vendor manuals and site condition for both installed and stored equipment.

B. Overlooking and directing Al-Haweja water supply project. (Kirkuk). Al-Qabas Company 15Aug 2007 – 9Fe2008

Establishing water supply system as capacity of 1600 QM/hr.

Construction schedule follow-up,

Material control

C. Project manager, water supply project (Dokan-Sulaimany), Al-Qabas Company 20Feb2007 – 1Aug2007

4 Electrostatic precipitators

5 Flue-gas desulfurization

6 Balance of plant

7 Handover

8 Turnover packages

9 Root cause analysis

10 Method of statements

11 Inspection and test plan

12 Factory and site acceptance tests

Augmentation of water supply system from 1800 QM/hr to 3600 QM/hr.

Feasibility study

Design

Bill of quantity

Vendors and suppliers offers and proposals

D. Project manager, establishing sub power station in Kirkuk, Rony bureau, to ECCI 10May2006 – 10Sep. 2006

Installation of diesel generators 2.5 MW each

E. Mechanical engineer, (A.G.S. Company, the contractor) Sulaimany international Airport. 10Aug 2004 - Jan 2006

Site engineer, executing of HVAC, plumbing and elevators works F. Planning department manager, Kirkuk Factory for CM13. July 1989 – Aug 1994 (part Time)

G. Different durations;

2008 to 2015

Execution a lot of projects, as contractor, in N.O.C14, and N.G.C15 in Kirkuk as rehabilitation of mechanical & electrical departments. Deedan Company.

Execution of mechanical and electrical projects, as contractor, in Northern Directorate of Electricity Distribution and Control, Kirkuk, Deedan Company.

References

As per request

13 Construction Materials

14 North oil company

15 North gas company



Contact this candidate