Post Job Free
Sign in

Piping Designer Aramco

Location:
Bel-Air, 1227, Philippines
Salary:
USD 2000
Posted:
June 14, 2022

Contact this candidate

Resume:

* ** *

FELICISIMO C. CAPUA Jr.

# *** ***** ******** ******** **** Paz,

Antipolo City.

+63-935*******/917-***-****

*********@*****.***

*********@*****.***

POSITION Piping Supervisor

OBJECTIVE To be able to use my experience, educational background, and skills in an organization that will enhance both the growth of the company and personal career and personal development.

KNOWLEDGE IN MECHANICAL WORKS

Have basic knowledge in MEPF Work specially in Piping job.

Have basic knowledge in NFPA code standard such fire protection

(NFPA 13 up to 14)

Knowledge in SMACNA standard such HVAC

Have a basic understanding of all types of piping component and their function (Including Valve)

Understand to read P&ID, general arrangement and isometric drawing

Understand international code such ASME VIII, ASME IX B31.1, AWS D1.1 and AS2129 Standard

WORK HISTORY

360 GLOBAL INC.

Main Office

LTA BLDG. Perea st. Makati, Philippines

Senior Piping Designer\Checker

LTA Bldg, Makati, Philippines

2018 – September-Present

Duties

Prepare Piping detail model support to all piping area.

Reviews development of specifications of engineering such P&ID, General Arrangement and piping isometrics.

Assist, Remodel and Update the model based on the Internal, Client reviews, latest Supplier information and Isometric checking comments and maintain the clash free model.

Check all types of piping systems, design and construction standards, and working knowledge of material selection, non-metallic piping specification, full appreciation of international codes. All Project

Gekko = May..2021 to Present. 2021 (King Island Scheelite Tungsten Project, Australia) Como = Apr. 2021 to Present (Poboya, Citra Palu Mineral Project, Australia) Onslow = Feb..2021 to Mar. 2021 (Khundi Upgrade Salt Project, Australia) Khundi = Jun.2020 toDec. 2020 (Khundi Gold Project, Philippines) Primero = Mar.2020 to Jun. 2020 (20MW Thermal Power, Australia) RoyHill = Feb.2020 to March. 2020 (As-Built P&ID and Elec. Diagram, Australia) TVI = Mar.2019 to Dec. 2019 (Khundi Gold Project, Philippines) 2 of 7

FYFE = Jan. 2019 to Mar. 2019 (Wolert Scan file develop model, Australia) WalvisBay = Nov. 2018 to Jan. 2019 (WalvisBay Salt Project, Africa) PGHI Hotel.

Main Office

1235 E. Rodriguez Sr. Ave. corner Alabama St.

New Manila Quezon City, Philippines

Piping Supervisor

New Manila QC., Philippines

Aug. 2017 – Nov. 2018

Duties

Achieved the work as maintenance head in team and manage supervisory task to ensure project success with respect to quality control, safety and schedule of staff.

Utilized troubleshooting maintenance issue concern, interpret blueprint, schematic, manulas and requirements for various MEPF processes.

Accomplished, all maintenance staff on a diverse work front. Contribute in assiting the management team with implement awareness on safety specially fire and weekly reporting requirement to HR

Prepared detail and plan of room renovation, arrange bill of quantity that provides a fair and accurate system for tendering.

Assist project contractor in proper schedule where time is much an issue and better cost certainty from inception to completion. Nasser S. Al Hajri corporation

SADARA Project

ISOCYANATES Plant Chem 2 facilities of 5 Units such Di-Nitro Toluene, Nitric Acid, Mono Nitro benzene, Aniline and Formalin.

New Industrial Jubail, K.S.A.

Piping Superintendent

Industrial 2 Jubail K.S.A.

April. 2014 – May. 2016

Duties

Work alongside the project management and supervisory team to ensure project success with respect to quality control, safety, schedule and manpower.

Manage all sub trade on diverse work front.

Assisting The management team with daily, weekly and monthly reporting requirement to the client.

Handle Pre-commissioning and reinstatement work.

Train The supervisor, foremen to the use of schedule and ensure crew are working to the schedule utilizing the work package.

Staff Has all the appropriate personal protective equipment for job safety to complete Pre-commissioning work.

Ensure Quality assurance is aware of any work related to the work package and reinstatement work.

Communicate regular to work progress schedule variance, crew and safety performance to the project management meeting. 3 of 7

360 GLOBAL INC.

Main Office

Gil Puyat Avenue, Makati, Philippines

Senior Piping Designer\Checker

Gil Puyat Avenue, Makati, Philippines

September 2011 – February 2013

Duties

Leads the design and supervision of piping designers, supports schedule development, manpower forecasting and supports preparation of material take off.

Reviews development of specifications of engineering such P&ID, General Arrangement and piping isometrics.

Assist, Remodel and Update the model based on the Internal, Client reviews, latest Supplier information and Isometric checking comments and maintain the clash free model.

Check all types of piping systems, design and construction standards, and working knowledge of material selection, non-metallic piping specification, full appreciation of international codes. All Project

Apex minning Feb 2013 Present(Apex Expansion Project, Davao, Philippines) Pacific Industries Sep.2012 to Feb 2013 (TROPICANA Gold Project, Perth, Australia) Monadelphous May. 2012 to Sep. 2012 (Port A Gold Project, Africa) Lycopodium, Sep.2011 to April. 2012 (AKYEM Gold Project, Ghana, Africa) ADVANCE VISION

Princess Noura University Project

Large area of college compound for woman

Including electrical operated train (LRT) with

14 station surrounding the whole perimeter area

Cad Technical Engineer

Riyadh, K.S.A

May 2010 – July 2011

This position provides the coordinating function in the office and at the project site in the fields of Mechanical, Fire Protection, Plumbing and Electrical for the proper and timely completion of the project.

Responsible and focused on the technical details of mechanical, fire protection, hvac, plumbing and electrical works of the project.

Witnesses the start-up, testing, commissioning, turnover and acceptance of contractors’ and suppliers’ works or products.

Reviews and interprets mechanical, fire protection, plumbing and electrical contract documents, drawings and specifications;

Handles contractors submittals, i.e. shop drawings, samples and ensures timely approval;

Handles the evaluation of work accomplished by contractors

Updates Monthly monitoring of punch-lists and the Final Inspection and Acceptance Certificate;

ADVANCE VISION

4 of 7

Al Hassa Project, Main Office

Mechanical Draftsman

Jeddah, K.S.A.

March 2010 – May 2010

Duties

Responsible and focused on the technical details of mechanical, fire protection, hvac, plumbing and electrical works of the project;

Prepare shop drawing of mechanical included bill of material such fire protection, hvac and plumbing.

Prepare detail drawing for electrical emergency and external lighting.

Monitor drawing involve in site for some discrepancy to prepare and revised drawing according to site condition;

STRUCTURETONE ASIA

Imasen India Project

Cad Engineer (MEP)

Rajasthan, Neemrana India

Nov. 2008 – Aug. 2009

Duties

Prepare and design for Mechanical, HVAC, plumbing & electrical, fire protection (piping) sanitary sewage, water supply, fire alarm system and electrical schematic, layout, lighting, and low voltage.

Check drawing and MTO for purchase request

Check site work according to design drawing

Prepare as built drawing as per site actual field condition after the completion of construction.

Prepare commissioning, handover and take over to the project

Prepares budgetary estimates for bid proposals;

MALAYSIA MARINE & HEAVY ENGINEERING SDN. BHD.(MMHE) Tanker convert to FSO Orkid Project, Shipyard

Senior draftsman

Johor, Malaysia

July 2008 – Oct. 2008

Duties

Prepare and design drawing for hull fitting drawing under the classification with bereau veritas and JIS standard and offshore construction

Check drawing and MTO for purchase request

Prepare as built drawing as per site/board actual field condition after the completion of construction.

Witness and assist to weight survey on board for preparation of inclining test

CONSOLIDATED CONTRACTORS COMPANY (CCC)

Khursaniyah Gas Plant

Autocad operator (PIPING)

5 of 7

Khursaniyah, K. S. A

Mar. 2006 – Mar. 2008

Duties

Prepare material take off for underground pipeline such oily water sewer, caustic sewer and fire water

Perform mark up from isometric for fabrication drawing use CCC originated software for isometric drawing

Fill appropriated paint system for every line as per BTJV data for mechanical line list

Selection the number of weld for support such dummy leg, pipe shoe and sim plate as per BTJV and ARAMCO design standard support

Prepare piping as built drawing as per site actual field condition after the completion of construction.

PTTECHNIC

Pumping Station

Piping Foreman/Supervisor

Sudan, Africa

Mar. 2005 – Dec. 2005

Duties

Perform mark-up for fabrication and installation drawing

Check joint fit-up

Hands on supervisor from fabrication to installation

Material check and issue for fabrication

Fabricated piping support such trunnion and dummy support

Prepare piping as built drawing as per actual field condition after the completion of construction.

Structural erection for smoke stack

Handling testing task such hydro test and pneumatic MAGNACAD TECHNOLOGIES SCHOOL

School and Training

Autocad instructor

Morayta, Manila, Philippines

Sep. 2004 – Feb. 2005

Duties

Teaching autocad from basic, fundamental and intermediate such drawing set up create sample line and geometric shape

Explain drawing annotation, modifying object and efficient construction technique

Teaching the principles of 3D wire frame and solid modeling

Explain the preparing object drawing for rendering TRI TECH GENERAL SERVICES

Meat Processing (Cavite, Philippines)

Piping Foreman/supervisor

Trese martires, Cavite, Philippines

Jan. 2004 – July 2004

Duties

6 of 7

Lay-out drawing for of pipe for fabrication and installation of pipe lines such as steam line, chilled water line, condensate return line

Perform punch list such as line and continue to leak test such as hydro and air test

Fabrication and installation of different piping support/bracket along pipe rack area

Calibration of reducing valve at the pressure reducing valve station

(PRV-S)

KENANA SUGAR COMPANY

Animal Feed Plant

Mechanical Maintenance/Fabricator

Costi, Sudan, Africa

Jul. 2003 – Jan. 2004

Duties

Perform a fabrication/welder job welding of structural steel such column, pipe support

Fabricated of special elbow, square to round and fit-up of fitting of such elbow, flange and tee’s to the pipe

Assembly and installation to cane juice strainer fit-up of pressurized steam piping valve and fitting

Continue work up to hydro-testing and some installation at the site

Perform pre-operation and maintenance work

PLANT ENGINEERING CONSTRUCTION PVT. LTD.

Singapore Chemical Complex

Pipefitter

Jurong Island, Singapore

Mar. 2000 – Mar. 2002

Duties

Fabrication work such piping and steel structure

Preparation of material and tools required

Cutting and grinding preparation fit-up

Installation work laying pipe at their respective elevation

Perform hydro and pneumatic testing

Perform line check

Piping punch list and re-instatement

Perform line check

Pre-commissioning and start-up work

Pre-operation and maintenance work

MAISCOR (PHIL.)

Fabrication

Piping Foreman/Draftsman

Malabon, Metro Manila, Philippines

June 1997 – May 1999

Duties

Prepare fabrication drawing

Material check and issue for fabrication

Fabricated piping such trunnion and dummy support

Prepare piping as built drawing as per site actual field condition after the completion of construction.

Check joint fit-up

Working in japan as leader of company trainee

7 of 7

EDUCATION

1989 TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES

Drafting Technology,Oct.1989.

2003 XAVIER TECHNICAL SCHOOL

Computer Science, May 2003.

TRAININGS AND SEMINARS ATTENDED

March 1998 CERTIFIED WELDING INSPECTOR

Philippine Welding Society

April 1999 PIPEFITTING

Takada Corporation, Japan

September 1999 PIPEFITTER, FABRICATOR

TESDA, Philippines

July 2001 PIPEFITTING

Construction Industry Training Institute, Singapore August 2004 60 hour Modular Certificate in Autocad TESDA, Philippines

September 2004 AUTOCAD FUNDAMENTAL AND INTERMEDIATE Magnacad Technologies School, Inc.

TECHNICAL SKILLS:

Proficient in Microsoft Office (Word, Excel, PowerPoint and Adobe Acrobat 7.0 Professional)

Knowledgeable in AutoCAD

Knowledgeable in AutoCAD Plant 3D

Knowledgeable in SolidWork

NavizWork

Knowledgeable in Photoshop.

Knowledgeable in MEPF Construction.

PERSONAL BACKGROUND

Nickname: : Elly

Date of Birth: : May 15, 1971

Place of Birth: : Binondo Manila

Provincial Address : Sitio Langhaya Antipolo City

Religion : Roman Catholic

Sex : Male

Height : 5’2 & 1/2”

Weight : 135 lbs.

Citizenship : Filipino

Language Spoken : English, Tagalog

Civil Status : Married

REFERENCE

Available upon request.



Contact this candidate