Post Job Free
Sign in

Power Plant Construction Superintendent

Location:
Aiken, SC, 29801
Posted:
June 16, 2022

Contact this candidate

Resume:

STEVEN CARPENTER

706-***-**** ******************@*****.***

MECHANICAL I CONSTRUCTION SUPERINTENDANT I FIELD ENGINEER SPECIALIST 4 / CAPITOL PROJECTS / ENGINEER SPECIALISTS. “SAFETY ALWAYS FIRST”.

36 years in the Mechanical Process Piping, Equipment, Construction and the Engineering Industry. Including Design and Field Experience. Skilled in Maintenance aspects and New Construction with expertise in handling Projects in multiple areas in the Nuclear Industry and the knowledge of Nuclear Specifications and Procedures. Installation of all piping, supports and Systems including Glove Boxes and Radio Hoods. Results oriented leader, well able to direct and coordinate the professional success of others and manage time and people according to project and budget constraints. Facilitate between Engineering, Design, Management and Field Personnel in the implementation and successful completion of projects, project management functions including estimating project costs, ordering and receiving, material placement, handling and billing, resolving quality control issues, manpower placement skills, and basic weld inspection, also including all duties of Construction I Field Engineering. Work Package Building and Closure. I have been in the Mechanical Process field for 36 years. Perform to the highest level of Achievement for all Projects. Always keeping Safety first.

Management I Process, Mechanical Engineering, Field and Design /Safety Training I Construction I Policies and Procedures, Nuclear/ DOE/ SWPF and MOX PROJECT. Entrepreneurial Spirit I Professional Development &Training I Pipefitting I Maintenance Management / Capitol Project Management Specialist / Process Pipping Specialist / Support Placement Specialist.

EDUCATION --

-Construction Supervisor Courses completed: Production, Quality, Scheduling, Tracking, Rigging Safety, and First Aid/ -CPR,

- Engineering, Computer Training Microsoft Word I Microsoft Excel/ Very Knowledge in most all programs

- 35 years in the Mechanical and Process Piping and Equipment Engineering and Supervision Profession.

- OSHA 10 Certification #36-003******

-NCCER Certification #5995408 (PIPE)

-Local 150 Apprenticeship Program 5 Years Mechanical and Process Piping.

-GED.

- Knowledge in Microsoft Excel, Can Make and generate any kind of Spread Sheet for systems ECT.

-Knowledge in Microsoft Word Can produces any kind of document pertaining to scope of work ECT.

-Knowledge with the Adobe Pro program also, Program handy with generating symbols and ECT, when producing weld maps and ISO Maps.

-Generating Punch List for systems and walking down same and marking up percentage of completion also.

-Overseen production coming out of the Fab Shop to assure the proper Dimensions and Configurations.

- Knowledge in CAD 3-D Construction Program's.

-3 years Trained Experience with Flowserve valves assembly and disassembly, All Types Plug, 3-Way, Control, Air Actuated. Also wrote OJT-Training coarse for Craft and Taught the same coarse at SWPF for 3 years.

- DOE- on site Training, ITAR, FCPA, Confine Entry Space, and DCN, FCN, FCR, and CRFI Engineering Classes.

- Engineering, Mechanical, Nuclear and Construction Training in the workforce to Achieve Excellence for a combination of 36 years.

PROFESSIONAL EXPERIENCE -

August 2020 to Present - Actively looking for placement to utilize my skill set to the fullest in the Piping, Mechanical, Construction, Management, Coordination aspect of any Project. Putting Safety first always.

Brewer Engineering-Jan. 2019 to August 2020 Mechanical and Engineering. The inspecting and overseeing of all Mechanical process piping, supports, all fabrications, equipment, installations per design and specifications. With a Safety Core.

(NUCLEAR)-DOE-MOX PROJECT Mechanical Construction Field Engineer/Specialist Level 4, CBI Oct-1st 2018 to January 7th 2019 –(WP Closure). The assuring of all Mechanical process piping, supports, and equipment are installed according to design and specification. All in Work Package Closure.

(NUCLEAR) Vogtle Power Plant Senior Construction Mechanical Field Engineer/Specialist, Bechtel Oct-23rd 2017-to- August 1st 2018 (Bechtel won bid on job from Fluor). - With a Safety Core. I inspected all Mechanical process piping, supports, and equipment to make sure all are installed according to design and specification. Also Inspected all fabrications for assigned areas.

(NUCLEAR) Vogtle Power Plant Senior Construction Mechanical Field Engineer/Specialist Fluor Aug -21-2017-to- Oct-23rd-2017- The assuring of all Mechanical process piping, supports, and equipment are installed according to design and specification. Also Inspected all fabrications for assigned areas.

(NUCLEAR)-DOE-MOX PROJECT Mechanical Construction Field Engineer/ Specialist Level 4, CBI-FEB.-2016-Aug-2017 - The assuring of all Mechanical process piping, supports, and equipment are installed according to design and specification. Also Inspected all fabrications for assigned areas.

Mechanical Construction Field Engineer/Specialist Level 3 Parsons, April-2012- FEB.2016 (NUCLEAR)-DOE- The assuring of all Mechanical process piping, supports, and equipment are installed according to design and specification. Also Inspected all fabrications for assigned areas.

S&T Mechanical Engineering Owner/Operator 2011 - March-2012- Duty’s to include ground up fabrication and installation of (2) interstate digital advertisement signs.

Cytec Specialty Coatings Plant, Construction Mechanical Process Field Engineer, Austin IND. 2010 - 2011- Updated all of the Mechanical process P&ID’s for 2 operating plants to reflect removed and newly installed piping, instruments and equipment.

Assistant Pipe Superintendent, Turner Industries Grayville, LA, 2009- Assisted in supervising 40 to 60 pipe fitters and welders in the installation of the process piping, supports and equipment in the new NHT area. Also held pre job briefings with the General Foremen, Foremen and Craft.

Pipe General Foreman, Beacon, Bedford, KY, 2008-Managing 4 to 5 foremen supporting them in being successful with their everyday tasks installing piping, supports, and equipment. Working through all obstacles keeping Safety first.

Pipe General Foreman, Westcon, Herford, TX, 2007- 2008 Managing 2 to 3 foremen supporting them in being successful with their everyday tasks installing piping, supports, and equipment working through all obstacles keeping Safety first.

Pipe Foreman, TIC, FT. Pierce FL, 2007 Managing 4 to 8 men supporting them in installing piping, supports, and working through all obstacles keeping Safety first.

Pipe Foreman, Titan Contracting, Decatur, Ala, 2006 Managing 4 to 5 foremen supporting them in being successful with their everyday tasks installing piping, supports, and equipment working through all obstacles keeping Safety first.

Pipe General Foreman, Lockwood Greene, West Columbia, SC, 2006 Managing 4 to 5 foremen supporting them in being successful with their everyday tasks installing piping, supports, and equipment working through all obstacles keeping Safety first.

Construction Superintendent, Ram Construction, Augusta, GA, 2003 - 2005 Supervised 3 General Foremen, 6 Foremen and 40 to 70 pipe fitters and welders in the installation of the process piping, supports and equipment. Held pre job briefings with the General Foremen, Foremen and Craft tasks installing piping, supports, and equipment working through all obstacles keeping Safety first.

Pipe Foreman, BE&K, Wansley, GA, 2002 – 2003- Managing 6 to 10 men supporting them in being successful installing piping, supports, and equipment working through all obstacles keeping Safety first.

Assistant Superintendent, Circle "C" Mechanical,

Augusta Ga. 1994 - 2001. Assisted in supervising 40 to 60 pipe fitters and welders in the installation of the process piping, supports and equipment. Also held pre job briefings with the General Foremen, Foremen and Craft.

Piping General Foreman, Waynesboro Ga. Pullman Power, Plant Vogtle 1991 - 1993 Managing 4 to 5 foremen supporting them in being successful with their everyday tasks installing piping, supports, and equipment working through all obstacles keeping Safety first.

Piping Foreman, Waynesboro Ga. Plant Vogtle 1988 - 1990. Lead a crew of pipefitters and welders in installing pipe in the Turbine Building.

Pipefitter/Welder, Waynesboro Ga. Plant Vogtle 1982 - 1987. Fabricated and installed Mechanical piping and supports.

Management

Work Planning and Lead Construction Scheduler.

Construction Coordinator and Cost Analysis.

Enforce policies, Safety always first, manage daily operations, and plan the use of materials, handle functions in multiple areas of management, such as personnel, purchasing, or administrative services.

Establish and implement NUCLEAR and NON-NUCLEAR policies, goals, objectives, and procedures, conferring with staff members in order to properly implement Engineered Projects including Procedures and Specification.

Monitor personnel performance activities to ensure that they follow approved design methods and procedures.

Supervise and communicate to upper management if levels of construction are adequate. Supervise and monitor the project schedule for completion keeping Safety first.

Supervise and maintain communication between construction and the production teams.

Provide HIGH level of Safety and communication aspects of construction activity to project manager and core teams. Written and verbal communication Specialist

Review vendor drawings for conformity to specified equipment.

Review contractor proposals to ensure that they comply with engineering specifications, design engineering drawings and identify potential issues in field.

ENGINEERING/MECHANICAL

- Perform all Mechanical, Process, and Nuclear Duties with Professionalism keeping Safety First.

-Inspected, examined, installed systems, observed, assuring all installations meet Engineering Design requirements keeping Safety First. Generated punch list, to include walking all systems down for commissioning.

- Inspected all installed, and maintained pipe systems, pipe supports, and related hydraulic and pneumatic equipment for steam, hot water, heating, cooling, lubricating, sprinkling, and industrial production and processing systems. Always keeping Safety first.

-As built Drawings of all corrections to full scale drawings of pipe systems, supports, and related equipment, following blueprints, Procedures and Specification.

-Selected sizes and types of related materials, such as supports, Piping and Equipment according to Engineering Specifications and insured installation of all.

- B31.3, and 1, also ASME, and NQA and NQA-1 Specialist.

- P&ID, Schematics and Isometrics Specialist.

•Generated work packages, Engineering, Worked hand and hand with the craft to resolve any issues in the field.

•Maintained All Data sheets for the assembly/disassembly of All Valves.

•Generated Design changes, including FCR’S, FCN’S, CRFI’S, NCR’S AND CR’S.

•Maintained current revisions in packages, and in the field document stations,

- Perform Nitrogen test and Vacuum testing on all glove boxes.

-Scheduled all piping for above the GLOVE BOXES and tie INS of same as well as scheduled all Piping for the underside of the GLOVE BOXES also. Including the RADIO HOODS and BENCH SINKS as well. Also overseen the INSTALLATION of GLOVE BOXES and RADIO HOODS with BENCH SINKS.

-Set up, Monitor and Supervise the Hydrostatic and pneumatic testing of all systems, including isolation point knowledge and valve placement and displacement,

.



Contact this candidate