Post Job Free

Resume

Sign in

Engineer Office Civil

Location:
Las Vegas, NV
Posted:
June 13, 2022

Contact this candidate

Resume:

Looking for a challenging job to work as a Rebar/Building/Construction Estimator & Civil Engineer, which will allow the utilization of professional skills.

Summary of Experience:

Over thirty-six (36) years of leadership experience in project engineering, planning, supervision, construction and estimating of commercial and residential buildings with proven record of completing project on time and on budget.

Holds a Bachelor of Science in Civil Engineering, is a licensed Professional Engineer, and has numbered of years’ experience in rebar/construction estimating either in heavy civil, federal & commercial buildings, residential, industrial, transportation, water/waste treatment plants, federal highway planning, road bridges & culverts, military ammunition buildings, and widely knowledgeable in construction management. 1985-2016

Detailed Description of Duties & Responsibilities: Lorem ipsum dolor

Pacific Steel Group/Alamillo Rebar – (Las Vegas, NV) May 2017 – Present

nOrganize and load all assigned projects, analyzed to assure the fastest ways to complete on time every individual

nStart to read, review, understand and prepare all quantity’s take off (per Plan swift software) all given assigned projects plans based on bid schedule date’s, prior to Soule rebar’s sac & segments bid take off (per Soule’s rebar format/ASA).

nEstimating all required rebar’s, wire mesh fabric’s, PT’ cables, stud rails, & related accessory products for specific construction projects. (rebar terminators, smooth dowels, standees, T&B supports bar, treaded bars, and others).

nI addition to all assigned projects also do all takeoff for all incoming addendums and changed order (for all awarded contracts)

nPrepare and assist in detailing of rebar’s prior to submittal & fabrication, bar list, rfi’s.

nKeeping & maintain all records relating to project such as release log, submittal & transmittal log, change order, shop drawings, etc., as required by contract documents.

nAssure/compare and monitor total weight of rebar releases prior to contract estimate.

nKeeping the estimates accuracy to the fullest nearest quantities’ takeoff, without leaving any scopes covered.

Harris Rebar Las Vegas – (North Las Vegas, NV) June 2011 – May 2017

nStart to read, review, understand and prepare all quantity’s take off (OST) all given assigned projects plans based on bid schedule date’s, prior to ASA rebar’s sac & segments bid take off (per ASA estimating format/Soule’s rebar format).

nEstimating all required rebar’s, wire mesh fabric’s, & related accessory products for specific construction projects. (rebar terminators, smooth dowels, standees, T&B supports bar, treaded bars, and others).

nAll completed project’s takeoff start to do pricing based on bars sac code or per bid items required forms.

nMonitor, check, takeoff, and pricing all projects changed orders (Based on all signed contract, new Addendum’s & others per client’s request additional supplied rebars (FOB & Installed).

nPrepare and assist in detailing of rebar’s prior to submittal & fabrication, bar list, rfi’s.

nKeeping & maintain all records relating to project such as release log, submittal & transmittal log, change order, shop drawings, etc., as required by contract documents.

nAssure/compare and monitor total weight of rebar releases prior to contract estimate

n

Pacific Coast Steel – (Glendale, AZ) May 2008 – June 2011

nEstimating all required rebar’s & related accessory products for specific construction projects.

nPrepare and assist in detailing of rebar’s prior to submittal & fabrication, bar list, rfi’s.

nKeeping & maintain all records relating to project such as release log, submittal & transmittal log, change order, shop drawings, etc., as required by contract documents.

nAssure/compare and monitor total weight of rebar releases prior to contract estimate.

S.B. Ballard Construction Company – (Virginia Beach, VA) May 2000 – April 2008

nEstimating all required rebar’s & related accessory products for specific construction projects.

nPrepares feasibility study for construction scheduling and bar chart diagram using Microsoft Project.

nPrepare all estimating works for future bid projects.

nCompleting and propose all incoming change orders and resolve all issues involve per awarded projects.

nPrepare all submittals required for project contracts.

nAssuring all OSHA and Construction Safety are implemented on-site.

Inland Builders Corporation – (Agana, Guam) July 1987 – February 2000

nEstimating all required rebar’s & related accessory products for specific construction projects.

nImplement project start-up procedures and supervised field operation for daily activities to ensure the smooth flow of the construction and maintain quality control.

nAdminister construction management on-site, conduct site investigation, obtain required permits, supervise construction, and implement project start-up procedures and supervised field operation for daily activities to ensure the smooth flow of the construction and maintain quality control.

nPrepare detailing of rebar’s, bar list, quantity take-off, estimate, rfi, monthly progress payment billing, change order, detailed report outlining all significant events, technical application and unit cost.

nKeeping all records relating to product brochures, specifications, samples, shop drawings, etc., as required by contract documents and as otherwise warranted.

nPrepare and review shop drawing prior to submittal to A/E to insure their adequacy, accuracy, and consistency with company intention and oversee preparation of company in-house shop drawing prior to fabrication or construction.

List of Projects Completed:

Few of those Projects Name:

Harris Rebar Las Vegas: Project Name:

(Project Sarah)Faraday Future Electric Vehicles (2,860+ tons), Las Vegas Wash Tunnels & bridges (1,865+/- tons), St George Hospital in Utah, On Beach, LA, Aria Resort & Casino, Water Softening System, Las Vegas Wash Channelization Improvements, Discount Tire Store in Vegas, Mandalay Bay Shanghai Restaurant, Henderson Campus Softball Field, Sidewalk Project Chuckwagon to Lone Mtn., Rex Bell Elem Sch. Bldgs (CCSD), ASI Supportive Housing, Children Learning Adventure, Needles Fire Station (Sn Bernardino, CA), Pinto Campus IT OPS Center, Stephanie Apt’s, New Goodwill Store, R-19A Reservoir Rehabilitation, Sandy Valley School Gymnasium, Lee’s Discount Liquor, Supreme Court of NEVADA, Galleria & Dave Wood Elem. School (Tiltop Panels),Summerlin Village 17 Major Drainage Infrastructure and Golf Corse, and Several more Large Projects.

FLUOR/Pilot Catastrophe (FEMA) a. Houston Methodist Hospital, Downtown Houston underground Piping Lines, and other miscellaneous big projects b. Lake Charles Area Projects (LA): Lake Charles Airport, Calcasieu and all Cameron Parishes damages, and others. c. New Orleans Area Projects (LA): Nora Navra Library, Algiers Regional Library, Gert Town Pool, Several NOLA Fire Department Buildings, Desire/Florida Multi Service Center, several projects from Jefferson Parish, and other big more projects d. State of Illinois Projects: All Projects involved for Bureau, La Salle, Grundy, and Woodford Counties. e. Ohio Region 4 Projects: All Brown County Engineer Office big roads and bridges projects and Clermont County Engineer Office roads, bridges, dams, and others projects, City of Cincinnati future and on-going projects, and Washington TWP project f. Cameron Parish (LA) Projects: Creole Ball Park, Parish Road PR-521, Gulf Breeze Area Roads, Holly Beach Tank Fac. & Several big Projects which involved estimating knowledge and heavy civil works. g. New Jersey Projects: Bergenfield, Mahwah, Tenafly, Hackensack roads, several bldgs., Demarest, Glen Rock, New Milford, Dumont, Ho-Ho-Kus, Oakland, Westwood, Montvale, and several more Borough’s which involved damages roads, bldgs., and others.

Pacific Coast Steel Project Name: Several Phoenix Big and large Projects, Phoenix International Terminal Expansion, I-10 widening project, Nevada miscellaneous several expansion roads and bridges widening projects, and other several large rebar’s projects from Arizona DPWH.

S.B. Ballard Construction Company Project Name: Sentara General Hospital (Heart Center Pavilion Building), Garage Parking Norfolk General Hospital, Norfolk State University Student Housing Facilities, and others several large Navy projects.

Inland Builders Corporation Project Name: U.S. District Court Bldg., Hy’s Steak House, Hafa Adai Commercial Center, Holiday Inn Hotel & Resort, Hyatt Regency Hotel, Guam International Golf Course Building, Apo Sento Multiple Apartment Complex, Villa Rosario Apartment Complex, and other Big Commercial and residential dev’t. projects.

PROFESSIONAL REGISTRATIONS/CERTIFICATION: Professional Engineer (License) – PE Registration no. 0046318 (1986) Military Quality Control Manager Training – Certification (Guam) 1997 Several FEMA Certifications (CEF Specialist: Project Officer:, HMP Specialist, Debris Specialist, and others EXACTIMATE Certification Training completed – (2003) Primavera and Timberland Software’s Specialist Training completed – (2006) Rebar Reinforcements Cost Estimating (From Manual, excel, Soule Software, thru OST and ASA rebar estimating format) and Detailing Training (PCS) – (2007) Miscellaneous Navy/Military Safety (OSHA) and Requirements Training (Andersen Air force Base)– (1995)

AWARDS/HONORS/RECOGNITIONS: Several Military Projects – Recognitions (Guam) Dai Nippon (Guam) Construction Planners – Recognitions (Guam) Quality Control Good Management – Recognition (Andersen Air Force Base – Guam) FEMA – Recognitions in several disaster events (2011 – 2014)



Contact this candidate