Richard Wilson
Columbia, MO. 65201
***********@*****.***
RESUME
Education. BS. EE and Aerospace
Georgia Institute of Technology
Atlanta, GA
Multiple trips thru GE management school at Crotonville, NY
General Electric Co
13 years
Installation and maintenance of rotating equipment worldwide
360 kw to 1160 Mw
Including construction and start up of Callaway Nuclear near Fulton, MO
for Union Electric…..now Ameren
Williams Pipeline Company
Rebuild of tanker loading stations across the Midwest. The federal government
dictated removal of vapors released during open air loading of fuel. This required the installation of a vacuum system to collect the vapors from the loading process, transport same to a storage tank for combustion. Rebuild of existing and construction of new underground piping while station remained in operation.
Embassy Suites Indianapolis, IN
224 room property plus meeting facility and indoor pool.
Page two
Ritz Carlton Seven mile beach
Grand Cayman, Cayman Islands
262 room hotel, golf course, and ten story condo residence tower
Complete rebuild and rehab of property after severe hurricane damage that occurred only 45 days before initial opening date,
Four Seasons……Nevis, West Indies
212 room hotel, golf course and marina. Built the property initially and returned over the next many years to rebuild it three times after hurricane damage.
Four Seasons @ Emerald Bay Great Exuma, the Bahamas
Now Sandals….emerald bay
266 room hotel on a 400 acre property, golf course, three pools, casino and all the amenities expected at a five star resort. This was a very remote island, with barley enough utilities to
service the local population. This required the construction of ALL utilities to support the resort
including….
24. Mw power plant
2.4 million gal/day desal water plant 700,000 gal above ground water storage
3 million gal/day waste water treatment plant
All utilities were designed with expansion modules because the plans called for residential area to fill the remainder of the property. A marina was constructed as well fuel storage and distribution piping to service the facility and the marina.
Scott Air Force Base Belleville, IL
IL nation guard was required to move a wing of KC- 135 tankers from O’Hare to Scott Air Base. This required. Additional fuel storage as well as underground distribution piping to all six aircraft to load at any one time. Residence halls and office space was constructed as well as maintenance and storage hangers.
Kuwait City, Kuwait
Rebuild of city after destruction that occurred during occupation by Iraq. Rehab of power plant, water plant and waste water treatment facilities. Rehab of Hilton hotel. Rebuild of major oil distribution line to move crude from the oil fields to tanker loading dockage.