Ronhartill B. Gonzales
Petroleum Engineer
Blk.*, Lot 29 Manors Mercedes Home Soro-soro Ilaya,
Batangas City, Philippines
******************@*****.***
PROFILE SUMMARY
More than 11 years total experience on Petroleum Industry and Railway Construction
Certified Safety officer and Pollution control officer ISO14001(Prev. EMBaccreditationCOAno.37000-20211-03PA- 1141Cat. A) (Previous EMB accreditation no.COA no.2018-R4B-01856for Category B)
Proficient in key aspect of production plant activity, including inventory control,report generation, requirement analysis, site inspection, resources allocation and hazardous material control.
Experiences on, Plug and Abandonment for ten (10) wells as company field representative using Black Diamond Slickline,Scientific Drilling Wireline and Shlumberger Coil Tubing.
Equipped with skills and knowledge on Production testing / Flow test and surface well testing, EOR, short Production forecasting, Project Management, HSE, Supervise Rigging and Lifting. EDUCATION
Diploma : IDOSHE - International Diploma in Occupational Safety, Health and Environment ( IGBoA LLC/IADC, IBOESH U.S.A)
Date : Present
College Degree : Batangas State University (B.S.U) Major : B.S.Petroleum Engineering
Date : 2004 –2009
High School : San Agustin National High School
Date Graduated : 2003-2004
Elementary : Julian A. Pastor Memorial Elementary School Date Graduated : 1999-2000
CERTIFICATE/TRAINING
MH- Environmental Training course for Managing Heads (July 30, 2021) PCO –Pollution Control Officer (July 12-16, 2021)
IWCF International Well Control Forum ( Level 1) (May 18, 2021) IWCF- WOCRM Well Operations Crew Resource Management (May 18, 2021) COSH - Construction Occupational Safety and Health (May 3 - 7, 2021) BT/STCW (December 2- 12, 2019)
SAT/SDSD (December 14, 2019)
Rigging and Slinging Course (LOLER/POWER UK HSE Guideline)(March 19 – 21, 2019) Basic Pollution Control(March13-16,2018)(March2018,EMB COA no.2018-R4B 01856forCategoryB) Basic Offshore Safety Induction and Emergency Training(March12-14,2012) BOSH - Occupational Safety and Health (July 12 – 16, 2010) Safety Officer Training Course for Construction, Petro Chemical and Oil & Gas Industries. (IGBoA LLC /IADC, IBOESH U.S.A)(July6-23,2009),Drilling Technology,Hydrogen Sulfide Safety, SCBA Instruction,Rig Pass,First Aid with CPR Instruction
Life Cycle Assessment (February 3,2007)
Programmable Logic control Maintenance and troubleshooting (September 13, 2006) In House Training
Oil Spill Response LevelIII (March30,2013)OSRL Singapore Oil Spill Response LevelII (May3-6,2011)OSRL Singapore Crane Safety(April26,2011) Firefighting / Search and rescue (Quarterly)
CORE COMPETENCE AND AREA OF EXPERTISE
>Offshore platform Operation > Rig Coordination
>Process & panel Operator > Leadership skill
>Project Management >Microsoft excel and Words
>Safety officer/Safety Inspections > HP/LP Flare system
>Firefighting Search and Rescue > Piping and P&ID
> Offshore equipment, tools, instrument operate, commissioning, maintenance and troubleshooting Skid multi flow meter (smith and Nu flow) Pneumatic control instrument(fisher), Pneumatic pump (haskel pump and wilden pump), pneumatic chemical injector(MiltonRoy), Baker control panel for wellhead and ssv,Oil in water analyzer
(TD500),Laboratory equipment centrifuge heater with 100ml V shape cone DETAILED WORK EXPERIENCE:
POSITION:HSE Managing Head
TERM OF SERVICE: September 22,2021 - March 26,2022 COMPANY : Tosung Co. Ltd. Philippines
PROJECT: Mololos-Clark Railway Project (package 2) EPC : ( Package 2 ACCIONA-DAELEM Joint venture )
COUNTRY: Philippines
Submit budget proposal in regards of Health Safety and Environment.
Ensures project compliance with all government rules and regulation ( Health, Safety, Environment)
Develop and Implement Construction Health Safety Program.
Review Job Hazard Analysis and Risk Assessment
Make immediate investigations of accidents/ incidents and report findings and recommendations to the site manager
Identify training needs and facilitates safety classes.
Assist the project management team in facilitation of safety committee meetings. Attend and participate tool box and sub-committee meetings.
Coordinate to main contractor with regards HSE issue.
Conduct HSE audit on site construction, (safety audit, Environment audit, health/ covid 19 audit equipment and materials Evaluate, assess and alter safety procedures and policies for the benefit of employees and clients)
Ensures project site adheres to company and regulatory HSE standards and guidelines
Promotes and fosters Company HSE standards and goals with programs throughout the Company and/or project to ensure a safe and productive work environment
Lead safety Walk through together with Client to determine findings and take action on issue raise during walk through and attend safety coordination meeting with a client.
Evaluate and solve non-conformance and initiate actions to prevent re occurrence.Initiate action including stopping of work.
Develop and implement Critical lifting.
POSITION:HSE/ Environmental Engineer (Project Management Team) TERM OF SERVICE: June 17,2021 - November 21,2021
COMPANY : RedViper Ventures and Development Corporation PROJECT: Mololos-Clark Railway Project (package 4 and 5) EPC : ( Package 4 ACCIONA-EEI Joint venture & Package 5 POSCO- EC) COUNTRY: Philippines
JOB DUTIES and RESPONSIBILITIES
Pollution Control Managing Head For package 4 and 5
Submit budget proposal in regards of Health Safety and Environment.
Develop and implementation of Contractors Environment Management and Monitoring Plan
Under the rules and regulation of the Philippines (Clean air Act, clean water act, Ecological and waste management act, toxic substance and Hazardous and nuclear waste act)
Coordinate with local authorities with regards on Environmental Permit and disposal.
Applied Permit to Operate on EMB portal.
Monitors activities relating to pollution source and to ensure the compliance with the Philippine environmental laws and regulation
Ensures project site adheres to company and regulatory HSE standards and guidelines
Promotes and fosters Company HSE standards and goals with programs throughout the Company and/or project to ensure a safe and productive work environment
Conduct internal monthly audit.
Lead safety Walk through together with Client to determine findings and take action on issue raise during walk through
Evaluate and solve non-conformance and initiate actions to prevent re occurrence.Initiate action including stopping of work.
Visit job sites to conduct safety audits on personnel, equipment and materials Evaluate, assess and alter safety procedures and policies for the benefit of employees and clients
Develop and implementation of Critical Lifting Plan. POSITION:Consultant/Field Operation Engineer
TERM OF SERVICE: September 17- October 8, 2020
COMPANY : The Philodrill Corporation
PROJECT: Offshore/ Plug and Abandonment
COUNTRY: Philippines
JOB DUTIES and RESPONSIBILITIES
Preparation of working site
Set up equipment/Rig up and Rig down
Confirmation of all Operation (well test pressure,Tagging of cement, zero oil ppm outboard fluid.) POSITION: Production Supervisor / HSE Head
TERM OF SERVICE: 2010 - November 7, 2019
COMPANY : The Philodrill Corporation
PROJECT: Offshore oil and Gas Production and Maintenance COUNTRY: Philippines PROJECT NATURE: Oil and Gas exploration and Production JOB DUTIES and RESPONSIBILITIES
Over all incharge and Responsible for the day-to-day operation.
Pollution Control Officer(March2018,EMB accreditation no.COA no.2018-R4B- 01856 for Category B) Full Implementation of rules and regulation.(Clean air Act, clean water act, Ecological and waste management act, toxic substance and Hazardous and nuclear waste act)
Supervise and implement of company rules and safety policy.
Team Leader during Oil Spill response, Search and rescue, Firefighting.
Maintain proper documentation of daily production report, Production testing / Flow test and surface well testing, short Production forecasting,Pumps and well information
Monitors production processes Fire and gas system,Chemical injection system, separation system, air compressor, storage tank, skid multi - meter (smith)
Supervise laboratory routine oil analysis,API,BS&W for proper chemical injection.
Preparation of check list before and after and after oil/gas Lifting.(well testing pressure/temperature, commissioning of production facilities)
Coordinates major overhauls and shutdowns by ensuring all equipment Is purged,gas free and made safe according to various shutdown procedures.
Supervise and Participates in the re-commissioning of equipment, ensuring appropriate test have been carried out and that all equipment is running with process guidelines and manufacturer's specifications.
Participate in hazardous Operability StudyreviewandPunchlistcompliancework
Performing Firstline Maintenance, Like repair, testing and maintain of various valve ;gate valve, ball valve safety relief valve, control valve,pumps, multi flow meter.
Supervising all lifting activities in accordance with the Lifting Plan, briefing all the lifting team members and being present during all Heavy/Critical lifting operations. Project Assign
April 6 – May 28, 2019
Company Field Representative
Well Plug and abandon thru Black Diamond Slickline (7 Well)
Preparation of working site
Set up wireline equipment/Rig up and Rig down
Assist on deploy and retrieve tool strings while performing measurement checks, and adjustments where necessary to ensure accurate depth measurement
Witness, confirmation of all Operation (well testing, injectivity test, zero oil ppm outboard fluid.) May 5 - June 7, 2018
Company Field Representative
JOB DUTIES and RESPONSIBILITIES
Well Plug and abandonment thru Shlumberger Coil Tubing and DP tugboat (ENA Habitat) 2 well
Company representative
Work Site Preparation
Witness, confirmation of all Operation (well testing, injectivity test, tubing string pressure test, zero oil ppm outboard fluid.
November 1 – November 5, 2015
Company Field Representative
Wellhead Rehabilitation thru Black Diamond Slickline (onewell) JOB DUTIES and RESPONSIBILITIES
Well Plug and abandonment thru Shlumberger Coil Tubing and DP tugboat (ENA Habitat) 2 well
Company representative
Work Site Preparation
Witness, confirmation of all Operation (well testing, injectivity test, tubing string pressure test, zero oil ppm outboard fluid.
March20,2014–April15,2014
Well Plug and abandon thru Black Diamond Slickline (two well)
Preparation of working site
Setup wireline equipment/Rigup and Rigdown
Assist on deploy and retrieve tool strings while performing measurement checks, and adjustments where necessary to ensure accurate depth measurement.
POSITION:Plant Operation Supervisor
TERMOFSERVICE:February2010August2010
COMPANY:Liquigaz Philippine Corp
PROJECT:LPG Depot and Terminal COUNTRY:Philippines PROJECTNATURE:LPG refilling station and terminal
JOB DUTIES and RESPONSIBILITIES
Responsible for the day-to-day Northway LPG Refilling and Depot operations, and Bulk receiving and off- loading.
Appointed PCO.
Handling directly bulk LPG inventory and LPG loss control.
Assigning and scheduling staff to meet various work duties with in the Northway LPG Refilling and Depot, and supervising various work teams.
Ensures readiness / reliability of product handling and storage equipment at all times.
Supervises collections of cheque payments from cash customers
Recommends and implements sanctions on erring drivers and haulers.
Heads the Emergency Response Team in Northway LPG Refilling and Depot.
Gas transportation representative.
Creating awareness of the hazard associated with LPG.
Daily Inspection of a site.
Inspection of LPG Gas Cylinder.
Implementation of Safety Rules and Regulation of the company.
Insure the Northway LPG Refilling and Depot Safety.
Invoicing of gas Sales.
Monitoring gas Production.
POSITION: service crew
TERMOFSERVICE:February2008-August2008
COMPANY:Mcdonalds Batangas
PROJECT: food and beverage
COUNTRY: Philippines
PROJECT NATURE: Service food and Beverage
JOB DUTIES and RESPONSIBILITIES
Order taking
Food preparation
Receiving payment
PERSONAL INFORMATION
Age: 34 years old
Sex: Male
Nationality: Filipino Civil
Status: Married
Date of Birth: June 4, 1987
Place of Birth: Caloocan Metro Manila
Height: 5’ 8”
Weight: 75 kg.
Religion: Roman Catholic
Wife Name: Donalyn L. Gonzales
Language/Dialect: English and Filipino
CHARACTER REFERENCE:
Benny Martinez
Field/Production Manager /The Philodrill Corp
Gil Regalo
RedViper Ventures and Development Corporation
Project Manager
Michael Tabal
Tusong Co LTD Philippines
Admin Manager
All above information are true and was formatted to suit the requirement of our prospective employer. Ronhartill B. Gonzales
NAME OF APPLICANT