Post Job Free
Sign in

Process Engineer Project Manager

Location:
Almaty, Kazakhstan
Salary:
2000$
Posted:
June 07, 2022

Contact this candidate

Resume:

Abugaliyev Adil

Male, ** years, born on ** October 1978

+7-777-******* — preferred means of communication

***********@*****.***

Reside in: Almaty

Citizenship: Kazakhstan, work permit at: Kazakhstan

Ready to relocate, ready for business trips

Desired position and salary

Chief mechanic, Chief Mechanic, Project manager

Specializations:

— Other

Employment: full time

Work schedule: full day

travel time to work: any

2 000

USD

Work experience —22 years 10 months

May 2015 — November 2021

6 years 7 months

KZMINERALS/SCP

Mining Industry

• Mining and Processing of Ferrous, Non-ferrous, Precious, Noble, Rare Metal Ores

Mechanical Deputy Director

A. With apply good knowledge by chose of methods FEED and experience in managed of EPC, EPCm contracts by technologies of Heap and Underground Leaching of Metals by methods DFSS&DMAIC we have built and commissioned two copper mining and handling plants with capacity 10,000 tCu/year Oxide Plant and Sulphide Plant in Aktogay 25,000 tCu/year, after that I continued their exploitation.

B. On the basic our calculations of Overall Equipment Effectiveness (OEE) I and my team developed conception Total Productive Maintenance (TPM), applies by S&RW of ball mills, crushers and etc.

C. Each from step of TPM are contain service and repair works (S&RW) plan equipment (S&RWP), shutdowns (SDS) and works schedules (S&RWS) and With apply good knowledge by chose of methods FEED and experience in managed of EPC, EPCm contracts by technologies of Heap and Underground Leaching of Metals by methods

DFSS&DMAIC we have built and commissioned two copper mining and handling plants with capacity 10,000 tCu/year Oxide Plant and Sulphide Plant in Aktogay 25,000 tCu/year, after that I continued their exploitation.

B. On the basic our calculations of Overall Equipment Effectiveness (OEE) I and my team developed conception Total Productive Maintenance (TPM), applies by S&RW of ball mills, crushers and etc.

C. Each from step of TPM are contain service and repair works (S&RW) plan equipment (S&RWP), shutdowns (SDS) and works schedules (S&RWS) and commissioning works plan (CWP) and schedule (CWS). Finishing each step accompted report about readiness for perform works and report by results works.

D. After conduction Water Tests of tanks, pumps, valves and pipes and etc. by us develops drains plans water with purpose provide rotation water supplying of environment save.

E. At same time working in depended on plans and schedules of works are procurement, logistic instruments, developed by us, for on time providing spare parts and materials.

March 2010 — February 2016

6 years

MG Engineering LLP/MAERSK OIL

Almaty

Construction, Real Estate, Architecture

• Construction of Oil and Gas Industry Facilities

Chief engineer

Responsibilities:

A. My team and I success performed design objects of Petroleum Terminals and Refinery Plant, as so as we've excellent using methods DFSS basiсed on principles 6 Sigma.

B. With my team I've get good experience of work with complicated clients in compliance with their hard requirements which sometime was almost impossible performing, but we successful

finished them.

C. Preparation of specifications different difficulty in compliance with different requirements clients with next conducting approve of design decisions with client and their pre-approve with State Construction Department.

D. Also, I am able organization so of design process, that all stakeholders of design process were included in one stream.

E. By with this were designed and commissioning are several objects: Oil Store Almaty, Fuel Filling Complex «KazMunaiGas», ASK Oil Extraction Plant, Refinery Plant. Also, I've excellent experience in received state approving by design and of permission for construction of a gas turbine plant Solar Company Inc.

October 2006 — January 2010

3 years 4 months

JV KATKO

Mining Industry

• Mining and Processing of Ferrous, Non-ferrous, Precious, Noble, Rare Metal Ores

Head of Mechanic division

Organization of designing and managing for procurement of standard and nonstandard hydrometallurgical equipments, pipeline & pipeline equipments - a direct participation in designing and montage object hydrometallurgical complex by underground leaching uranium. In close cooperation with foreign partners I'd received significant experience at option and montage of import equipment and introduction of new technology (the pumps, shut-off and regulating valves, process diagrams and pipe-line systems). The same experience was gained in conducting negotiations, planning the budget and in construction, also accompaniment contracts was conducted by me. With my direct participation is built processing complex by capacity 2500 tU/year.

January 1999 — October 2006

7 years 10 months

Trans Oil Construction Company Eni

Construction, Real Estate, Architecture

• Architecture, Design

• Construction of Oil and Gas Industry Facilities

Oil and Gas

• Oil Transportation, Storage

Principal Process Engineer

a. Construction, commissioning and put into exploitation several objects objects of O&G supply (stations, storages and oil-processing installation) - I have excellent experience by organizations of montage equipment activity in compliance with state requirements and construction rules.

b. Also I've large experience in organization works by turn side out of tanks until 10000 cubic. m. by method by sheeting assembly.

Education

Higher

2001

Moscow Bauman State Technical University, Moscow

Faculty of Engineering Business and Management, Economics and Management of the Enterprise (by industry)

1998

Kolsky Polytechnic College, Kalush

Exploitation&Repair of Civil&Drilling machines and eqiupment, METALLURGY, MECHANICAL ENGINEERING AND MATERIAL WORKING

Professional development, courses

2013

Grafics programme course 3D Autoplant

Autodesk-Kazakhstan LTD, Design

2009

Conducting Safe Methods of Work

DU PONT, HSE

2009

Project Managment

Ecole de Min (France), PMI

2008

Grafics programme course 3D Compass&Lodsman

ACCON-Kazakhstan LTD, Design

2007

Pneumatic System Design

FESTO-Kazakhstan LTD, Design

Key skills

Languages

Russian — Native

English — C1 — Advanced

French — C1 — Advanced

Skills

Purposefulness Multitasking Project management Analytical skills Business English Organization Skills Conducting negotiation Swift teachingness

Driving experience

Driver's license category B

Additional information

About me

- A Knowledge of the graphic programs: MS Office, MS Project, AutoCAD Plant 3D, COMPASS 3D.

- A knowledge of the languages: English, French - Pre-intermediate.

- I have a good knowledges and experience on undertaking civil work on parts civil, HVAC (ventilation, water, and canalization) (the order to organizations construction from "0" before delivery in usage).

- I Have good knowledges on product leading world supplier industrial standard and non-standard equipment (GROUNDFOS, ProMinent, FIP, +GF+ and etc.), is spoilt-adjusting armature, pipe line (including from polymeric material PE, PP, fiberglass and etc.)



Contact this candidate