Abugaliyev Adil
Male, ** years, born on ** October 1978
+7-777-******* — preferred means of communication
***********@*****.***
Reside in: Almaty
Citizenship: Kazakhstan, work permit at: Kazakhstan
Ready to relocate, ready for business trips
Desired position and salary
Chief mechanic, Chief Mechanic, Project manager
Specializations:
— Other
Employment: full time
Work schedule: full day
travel time to work: any
2 000
USD
Work experience —22 years 10 months
May 2015 — November 2021
6 years 7 months
KZMINERALS/SCP
Mining Industry
• Mining and Processing of Ferrous, Non-ferrous, Precious, Noble, Rare Metal Ores
Mechanical Deputy Director
A. With apply good knowledge by chose of methods FEED and experience in managed of EPC, EPCm contracts by technologies of Heap and Underground Leaching of Metals by methods DFSS&DMAIC we have built and commissioned two copper mining and handling plants with capacity 10,000 tCu/year Oxide Plant and Sulphide Plant in Aktogay 25,000 tCu/year, after that I continued their exploitation.
B. On the basic our calculations of Overall Equipment Effectiveness (OEE) I and my team developed conception Total Productive Maintenance (TPM), applies by S&RW of ball mills, crushers and etc.
C. Each from step of TPM are contain service and repair works (S&RW) plan equipment (S&RWP), shutdowns (SDS) and works schedules (S&RWS) and With apply good knowledge by chose of methods FEED and experience in managed of EPC, EPCm contracts by technologies of Heap and Underground Leaching of Metals by methods
DFSS&DMAIC we have built and commissioned two copper mining and handling plants with capacity 10,000 tCu/year Oxide Plant and Sulphide Plant in Aktogay 25,000 tCu/year, after that I continued their exploitation.
B. On the basic our calculations of Overall Equipment Effectiveness (OEE) I and my team developed conception Total Productive Maintenance (TPM), applies by S&RW of ball mills, crushers and etc.
C. Each from step of TPM are contain service and repair works (S&RW) plan equipment (S&RWP), shutdowns (SDS) and works schedules (S&RWS) and commissioning works plan (CWP) and schedule (CWS). Finishing each step accompted report about readiness for perform works and report by results works.
D. After conduction Water Tests of tanks, pumps, valves and pipes and etc. by us develops drains plans water with purpose provide rotation water supplying of environment save.
E. At same time working in depended on plans and schedules of works are procurement, logistic instruments, developed by us, for on time providing spare parts and materials.
March 2010 — February 2016
6 years
MG Engineering LLP/MAERSK OIL
Almaty
Construction, Real Estate, Architecture
• Construction of Oil and Gas Industry Facilities
Chief engineer
Responsibilities:
A. My team and I success performed design objects of Petroleum Terminals and Refinery Plant, as so as we've excellent using methods DFSS basiсed on principles 6 Sigma.
B. With my team I've get good experience of work with complicated clients in compliance with their hard requirements which sometime was almost impossible performing, but we successful
finished them.
C. Preparation of specifications different difficulty in compliance with different requirements clients with next conducting approve of design decisions with client and their pre-approve with State Construction Department.
D. Also, I am able organization so of design process, that all stakeholders of design process were included in one stream.
E. By with this were designed and commissioning are several objects: Oil Store Almaty, Fuel Filling Complex «KazMunaiGas», ASK Oil Extraction Plant, Refinery Plant. Also, I've excellent experience in received state approving by design and of permission for construction of a gas turbine plant Solar Company Inc.
October 2006 — January 2010
3 years 4 months
JV KATKO
Mining Industry
• Mining and Processing of Ferrous, Non-ferrous, Precious, Noble, Rare Metal Ores
Head of Mechanic division
Organization of designing and managing for procurement of standard and nonstandard hydrometallurgical equipments, pipeline & pipeline equipments - a direct participation in designing and montage object hydrometallurgical complex by underground leaching uranium. In close cooperation with foreign partners I'd received significant experience at option and montage of import equipment and introduction of new technology (the pumps, shut-off and regulating valves, process diagrams and pipe-line systems). The same experience was gained in conducting negotiations, planning the budget and in construction, also accompaniment contracts was conducted by me. With my direct participation is built processing complex by capacity 2500 tU/year.
January 1999 — October 2006
7 years 10 months
Trans Oil Construction Company Eni
Construction, Real Estate, Architecture
• Architecture, Design
• Construction of Oil and Gas Industry Facilities
Oil and Gas
• Oil Transportation, Storage
Principal Process Engineer
a. Construction, commissioning and put into exploitation several objects objects of O&G supply (stations, storages and oil-processing installation) - I have excellent experience by organizations of montage equipment activity in compliance with state requirements and construction rules.
b. Also I've large experience in organization works by turn side out of tanks until 10000 cubic. m. by method by sheeting assembly.
Education
Higher
2001
Moscow Bauman State Technical University, Moscow
Faculty of Engineering Business and Management, Economics and Management of the Enterprise (by industry)
1998
Kolsky Polytechnic College, Kalush
Exploitation&Repair of Civil&Drilling machines and eqiupment, METALLURGY, MECHANICAL ENGINEERING AND MATERIAL WORKING
Professional development, courses
2013
Grafics programme course 3D Autoplant
Autodesk-Kazakhstan LTD, Design
2009
Conducting Safe Methods of Work
DU PONT, HSE
2009
Project Managment
Ecole de Min (France), PMI
2008
Grafics programme course 3D Compass&Lodsman
ACCON-Kazakhstan LTD, Design
2007
Pneumatic System Design
FESTO-Kazakhstan LTD, Design
Key skills
Languages
Russian — Native
English — C1 — Advanced
French — C1 — Advanced
Skills
Purposefulness Multitasking Project management Analytical skills Business English Organization Skills Conducting negotiation Swift teachingness
Driving experience
Driver's license category B
Additional information
About me
- A Knowledge of the graphic programs: MS Office, MS Project, AutoCAD Plant 3D, COMPASS 3D.
- A knowledge of the languages: English, French - Pre-intermediate.
- I have a good knowledges and experience on undertaking civil work on parts civil, HVAC (ventilation, water, and canalization) (the order to organizations construction from "0" before delivery in usage).
- I Have good knowledges on product leading world supplier industrial standard and non-standard equipment (GROUNDFOS, ProMinent, FIP, +GF+ and etc.), is spoilt-adjusting armature, pipe line (including from polymeric material PE, PP, fiberglass and etc.)