Total 18 years experience in Road / Infrastructure and Buildings
EDUCATION
C . I . T S.B.T.E Karachi (2008) Karachi
COMPUTER SKILLS:
MS Office, Word Excel .Drawing Liscade, Auto Cad, Eagle Point etc.
OBJECTIVE
Having all most 18 years extensive professional experience in the field of civil Engineering execution supervision of Construction in mega projects of Roads, infrastructure, Bridges and other all the site activities storm water pipe lines, Sewerage drains, utility pipe sleeves Box culverts, manholes, open water storm drains and utility lines carried out by the contractor on site accordance with the drawings and standard specifications in Self-motivated initiative and maintains a high level of energy to handle timely and to successfully complete mega highway project
. Being a Civil Chief surveyor, I am interested in continuing a successful Carrier with progressive Company, and it will effectively utilize my experience and provide growth and stability .
The accompany resume will provide you with detail as to my abilities and experience.
Handling Struments
Digital Survey Instrument
Total Station TCA-1800
Total Station SOKIA 630
Total Station TCR-1201
GPS
530
Total Station SOKIA-610
GPS
1200
Page 1 of 4
PROFESIONAL EXPERIENCE
Working Experience in Builders Associates (Pvt Limited from 31th December 2004 to 15 March 2006 Survey / Checking of lie Locations by Total Station in Block A-5, A-6, B-3 at Creek Vistas Project DHA Phase-VIII Karachi.
Working Experience as a Survey and
CAD Operator of Topographic Survey for Multan Development Authority with effect from 19thOct 2006 to 16th Dec 2006.
Earth work Experience: MAB Company in the capacity of chief survey at construction of new surface drainage system Hadero Branch Drain Sub Unit Contact No R-III (d/1)RBODIII Usta Muhammad Balochistan. Duration March 2007 to December 2009.
Road Experience AZ Builder Company in the capacity of Chief Surveyor @ Jacobabad to Thull Road Associated Flood Emergency Reconstruction Project (5501-A). Duration 19 Jan 2012 to 01 Nov 2013.
Road Experience NKB Company. In the Capacity of Chief Surveyor @ Mehar to Faridabad. Associated Flood Emergency Reconstruction Project (5506). Duration 07 Nov 2013 to 30 May 2014.
Project: NDMA PAKISTAN WAREHOUSE NETWORK Hyderabad Sindh. Kestral spd (pvt) Ltd. Duration 07 June 2014 to 09-10-2015.
Project: CPEC Sukkur to Multan Section (Section -1 Sub-Section- 3)
KM-415+000 TO KM-435+000
Chief Surveyor Duration 18-09-2016 to 30-04-2017 China State.
M/S NKB Company. In the capacity of Chief Surveyor @Makli to Jungshahi Road.
Duration 05-05-2017 T0 29-04-2018.
Page 2 of 4
M/S (CCCC) China Communication Construction Company . In the capacity of Site Engineer
(EBEW) East Bay Express Way Gawadar
Duration period 15-05-2018 to 05-10-2020.
NATURE OF RESPONSSIBILITIES
supervision of Construction Activities
Fixing of Bench Mark and Traversing for Project
Recording of O.G.L
Controlling work as per drawing / Design
checking and recording of final grading levels for as built
checking of profile, cross-section and Setting out.
Setting out of box culverts, pipe culverts and Slab culverts
Coordination to Client Engineers, Consultants Engineers Regarding site Situation etc
HOBBIES:
The Daily routine study read the drawings and project specifications.
LANGUAGE:
Fluent in Speaking, Reading & Writing English, Urdu, Panjabi & Sindhi.
REFERENCE:
Will be furnished on request.
Page 3 of 4
Personal Details
Father’s Name:
Rasool Bux Jamro
Education:
D.A.E ( 3 Years degree)
Profession
Chief Surveyor
Date of Birth:
8th Aug 1979
Marital Status:
Married
Nationality:
Pakistani
Page 4 of 4