PERSONAL DETAILS. DEPARTMENT; COIL TUBING .JOBTITLE: Nitrogen Pump Operator
Full Name
OKOH IKECHUKWU INNOCENT
This is My Update CV
Home Address
4A MOUNTAINOF FIRE CLOSE, JAKPA ROAD EFFURUN DELTA STATE, NIGERIA
Telephone NumberWhatapp
Telephone Number Saudi
Date of Birth
28TH OCTOBER 1978
Nationality
NIGERIAN
Country of Residence
NIGERIA
Home Airport
MURTALA MOHAMMED INTERNATIONAL AIRPORT IKEJA LAGOS STATE NIGERIA
*************@*****.***, **************@*****.***
Job Role Desired
FIELD OPERATOR (EQUIPMENT OPERATOR NITROGEN AND FLUID PUMPING OPERATOR)
Notice Period
ONE MONTH
Onshore and Offshore Experience
15YEARS EXPERIENCE
STATEMENT:
I am a field operator in well intervention (fluid pumping coiled tubing and nitrogen pumping) with significant oil and gas experience. I have been involved in several aspects of well intervention and operation. I also have significant onshore and offshore experience, working with Company man, operator, service companies, oil producing and engineering consultancy companies.
I have experience in well stimulation jobs like acid pumping, sand washing, nitrogen pumping, coiled tubing in deep water (drilling ships, semi-subs), jack-up, land jobs, and mostly on flow back hydrocarbon equipment such as Choke manifold, Flow back tanks, fluid pump, I also have a sound maintenance experience of these equipments.
Assistant Team leader during all phases of the rigging up and down of coiled tubing, nitrogen pumping and fluid pumping equipment on work locations for the purpose of providing services during well intervention or stimulation. The location which includes both onshore and offshore rigs in Nigeria. JOB EXPERIENCE
DATE
CLIENT/CONTRACT NUMBER
DESCRIPTION
FACILITY
LOCATION
REMARK
7/2/14
SEPLAT-SEPL0000/152/NIG/D&C/11
N2 PUMPING OPERATION
SWAMP
OVOH10
SUCCESSFUL
1/1/14
SEPLAT-SEP0000/152/NIG/D&C/11
N2 PUMPING OPERATION
ONSHORE
OBEN
SUCCESSFUL
3/5/13
MOBILA2131506
N2 LIFT OPERATION
OFFSHORE
BALTIC
SUCCESSFUL
3/5/13
MOBILA2131506
N2 LIFT OPERATION
OFFSHORE
BALTIC
SUCCESSFUL
18/4/13
ADDAXTB 1484
ACID STIMULATION
OFFSHORE
AD10
SUCCESSFUL
2012
SPDC NGO1009352
XYLENE SOAK/ACID/N2 LIFT
ONSHORE
AGGBADA 12S
SUCCESSFUL
2012
SPDC NGO1009352
SAND CLEANOUT/ACID/N2 LIFT
SWAMP
BELEMA 5
SUCCESSFUL
2011
EXXNMOBILA2131506
NITROGEN LIFT OPERATION
OFFSHORE
UBIT 16
SUCCESSFUL
2011
AGIP NG00007856
NITROGEN LIFT OPERATION
ONSHORE
OBIAFOR
SUCCESSFUL
2011
MATT ENERGY
NITROGEN LIFT OPERATION
ONSHORE
UMU 8
SUCCESSFUL
2010
EXXNMOBILA2131506
NITROGEN LIFT OPERATION
OFFSHORE
IYAL
SUCCESSFUL
2010
EXXNMOBILA2131506
NITROGEN LIFT OPERATION
OFFSHORE
USIRE
SUCCESSFUL
2010
ADDAX TB-1484
NITROGEN LIFT OPERATION
ONSHORE
OSSU21
SUCCESSFUL
14/10/2009
MOBIL PRODUCING NIG.LTD A2131505
CT/NITROGEN LIFT OPERATION
OFFSHORE
BALTIC
SUCCESSFUL
17/08/2009
MOBIL PRODUCING NIG.LTD A2131505
CT/NITROGEN LIFT
OFFSHORE
ADRIATIC 8
SUCCESSFUL
8/5/2009
MOBIL PRODUCING NIG.LTD A2131505
SAND WASH/NITROGEN LIFT
OFFSHORE
BALTIC 1
SUCCESSFUL
.ACHIEVEMENTS:
well intervention Operator on well stimulation, fluid pumping and nitrogen pumping jobs (various fields and jack-up rigs) for CHEVRON like, DELTA JACKET 16/19D, OKAN 65D,MEREN JACKET-MEREN 16D, MEREN 77D, MEREN 89, MEFA 8, MEFA 8D, MEREN2 14/14D, MEREN2 17. And also for SEPLAT PETROLEUM DEVELOPMENT COMPANY PLC like; OBEN WELL 24T, OBEN WELL 41, SAPELE SHALLOW WELL 29H.
Well intervention field Operator on well stimulation jobs (various fields) for SEPLAT PETROLEUM DEVELOPMENT COMPANY PLC at the following wells: OBEN WELL 24T, OBEN WELL 41, SAPELE SHALLOW WELL 29H.
Assistant Nitrogen Operator on various wells testing jobs for OBEN WELL 41, OBEN WELL 21,
Team member, in coiled tubing rig up for OBEN WELL 24T, OBEN WELL 41, SAPELE SHALLOW WELL 29H.
Senior Fluid Operator – pumping job for CHEVRON wells like; DELTA JACKET 16/19D, OKAN 65D,MEREN JACKET-MEREN 16D, MEREN 77D, MEREN 89, MEFA 8, MEFA 8D, MEREN2 14/14D, MEREN2 17.
AREA OF EXPERIENCE; 04/2008-03/2013
NITROGEN PUMP OPERATOR SUPERVISOR: Rig up and down operation of nitrogen pump from nitrogen tank making up line to the coil tubing reel connection in operating and pumping of nitrogen gas after conversion of liquid to gas during well intervention. Nitrogen lifting and purging of pipeline in onshore and offshore. Application of nitrogen testing of equipment, pressure testing, for stimulation work, for sand washing work and for redress of Bop testing. Vacuuming of nitrogen tanks, transfer of nitrogen liquid loading to unloading tanks .calculating and reading nitrogen chart from water inch to volume of liquid nitrogen in (Gallon). Repairs of nitrogen equipment if malfunctioning. Using of vacuum pump machine to removal of air from nitrogen tanks. Servicing of Rupture disc and other safety valves.
3. AREA OF EXPERIENCE; 08/2011-03/2016
FLUID PUMP OPERATOR: Set up computer data acquisition, Testing of Down Hole Tools, redress and testing of BOPS. Packing Triplex Pump using RE-kite for HT400RoughRider. Operation circulation of the pump line to the displacement tank and flushing in rig up line from the pump. pressure testing such the pump, rig up line, the pressure relief valves, BOPs, Coil tubing reel which rotary valves and pressure testing loose equipment such as 2x2inch hammer valves and 2x1inch hammer valves for leakage and to hold fair. Using of martin Decker gauge with detector transducer sensor. Rig up fluid pump using loose equipment to the coil tubing unit from then to The xmas tree where pressure testing of the Bop rigging up with the equipment injector head and other.
AREA OF EXPERIENCE; 05/2016-08/2018
COIL TUBING OPERATOR: Operation of coil tubing reel and sizes of tubing 1.25 and 1.75 inches. Coil tubing are Roller and Grapo Connectors also will use MHA(Motor head assembly)and BHA(Bottom hole assembly) with other down hole tools for coil tubing fishing jobs using Grapo connector while Roller connector is use for nitrogen and stimulation jobs. Testing of coil tubing reel using nitrogen pump with tank to a nitrogen gas state conversion also using fluid pump checking for tubing pin hole leakage in tubing also using fluid pump to test for rotary swivel in coil tubing reel for pressure testing of BOPs to know the work pressure of the BOP Checking for leakage. For pulling testing the pound weight of hydraulic motor and the amount of psi you apply in your traction and wellhead pressure. Testing of stripper leakage.
SECOND COMPANY ; NATIONAL PETROLEUM SERVICE TECHNOLOGY. I JOINT NPS 2019/01/11 AS CT PUMP AND NITROGEN OPERATOR . i have work so many well in Saudi aramco location and sites such as nitrogen lift nnd logging in site 4 location khurais 77,1001 and abif19 wells in FEBRUARY and MARCH. In APRI, logging and nitrogen lift at site4 location ngwcu well,abqq343 and abqq569 i am the one operating, pressuring, and pumping of fluid and operating nitrogen pumping. In MAY, fishing changing and installing new xp plugs location sanad Saudi aramco nabor drilling rig 1501well site khurais268 pumping of brine after the work purging and flushing of coil tubing reel also rigging up and down from fluid pump coil tubing reel the kill suface line up bop connection install to the wellhead. I have work in nps as fluid pump and nitrogen operator for 5month now this is my second hitches.
AREAS OF PROFICIENCY:
Maintenance of Equipment like Fluid Pump, Acid Blender/Batch Mixer, Nitrogen Pump, Coiled Tubing Unit, Blowout Preventers (Bop) Choke Manifold, Flow Back Tanks, cement mixer and Vacuuming of Nitrogen Tanks.
Servicing of 3” and 4” side triplex pump of a single and dual skid fluid pump
Pressure-Testing and Charting
Equipment Mobilization, Rig-Up and Rig-Down
Job planning and post-job reporting
Operating of Equipment on Land and Offshore Rigs like; fluid pump, nitrogen pump, batch mixer, choke manifold.
Monitoring and Control of flow back tank
Vacuuming of nitrogen Tanks
Servicing of plug Valves
Servicing of butterfly Valves and treating Irons.
Carry out Pigging and flushing of coiled tubing reel with water and nitrogen.
SKILLS:
Ability to ensured that all equipment are in good condition before and after operations.
Proficiency in the usage of Microsoft applications like Microsoft Word, Excel and PowerPoint and graphics design; like autoCAD, archiCAD Photoshop and CorelDraw.
Good work ethics.
Team building and player.
Good communication in verbal, listening and Interpersonal relationship skills.
Problem-solving and leadership skill.
Think independently and work co-operatively to achieve organization goal.
Ability to learn quickly, master new concepts and adaptive to new environment.
Time management skills.
courteous and respectful manner.
personal Attribute.
Self-motivated and target-oriented, organization, creative, unassuming, and willing to learn.
Stress management skills.
Honest and trustworthy.
JOB DETAILS:
From
To
Company
Job Title
APRIL2008
August 2018
WEAFRI WELL SERVICES, NIGERIA
SENIOR FIELD OPERATOR
DUTIES, RESPONSIBILITIES:
Involve/contribute in rig-up and rig down in coiled tubing, fluid pumping, and nitrogen pumping operations.
Carry out/take inventory of equipment for every job.
Term lead in job mobilization.
Operate equipment assigned to when needed or necessary.
Maintain a safe area of work, promote safe working practices and aim for an accident and incident free environment. Conduct regular safety meetings prior to and during operations.
Ensures that Customer requirements have been fully met – giving a good company profile and good customer relations are maintained at all times.
Keep good record of data collected accurately and presented professionally to achieve a high quality report for the client.
Carry out Maintenance of Equipment both in the Base and Field.
Equipment Mobilization, Rig-Up and Rig-Down.
Comply fully with client quality procedures for equipment and personnel feedback.
Report any hazardous defects in plant, equipment and workplace, or shortcomings in the existing controls to a responsible person without delay.
Worked under extreme conditions including the extreme cold conditions
Carry Pressure testing and charting of equipment when need be.
Monitoring and Control of flow back tank
Supports the Supervisor/Coordinator to ensure the customer is satisfied with the service provided including the accuracy in carry out a well stimulation operationusing CT reel, control console, injector head, BOP, power pack, striper pack, nitrogen pump, fluid pump etc.
Day to day class training on well stimulation course at the base, which includes the operation, maintenance, pressure testing and function testing of the equipment.
Training on maintenance and servicing of different types of valves which includes: Butterfly valve, Plug valve, etc.
Pig and flush coiled tubing reel with water and nitrogen.
CERTIFICATES OBTAINED
Equipment operator Basic Nitrogen Pumping
Equipment
Certificate No. EOGR -2012 11-17.
HSE Training Level and safety-086 warfare
Nigeria Institute of safety Professional
BASIC OFFSHORE SAFETY BOS IET
Equipment operator Basic Fluid Pumping
Equipment Certificate No.EOGR-201307-4
Nigeria red cross Society first aid work
Certificate No. DFA/08/1247
Education
Higher National Diploma in Electrical and instrumentation control Engineering 2013 Petroleum technology Institute (PTI), Delta state, Nigeria.
National Diploma in Electrical and Electronics Engineering 2005
Federal polytechnic Auchi, Edo state, Nigeria.
Craft center Technical College Aba road,portharcourtRivers state Nigeria .
NATIONAL BUSINESS TECHNICAL EXAMINATION BOARD (NABTEB).(2002)
Ighobadu primaryschool warri Delta State
First School leaving Certificate (1989).
Languages (State Native, Fluent, Working or Basic)
Native: Igbo (Average)
Other: English (Fluent)
Summary
I operate the following oil and gas well intervention equipment; Fluid Pump, Acid Blender/Batch Mixer, Nitrogen Pump, both on offshore and onshore locations.
I Service/maintain Equipment such as; Fluid Pump, Acid Blender/Batch Mixer, Nitrogen Pump, Coiled Tubing Unit, Blowout Preventers (Bop) Choke Manifold, Flow Back Tanks, and Vacuuming of Nitrogen Tanks offshore and onshore jobs
Carry out rig-up and rig down operation in coiled tubing jobs.
Good Communication Skill.
Highly Motivated, Adaptable and Organized.
Good understanding of the importance purpose and Methods involved in Adding value to People.
Ability to Express Technical information in a Creative and Simple Manner.
Diligence to Work and Dedicated to Duty.
Capacity to Work as Team to Direct and Lead.
HOBBY
Spending quality time with family and friends.
Swimming.
Reading.
Dancing.
Travelling.
Referred
Rev. Doctor Great Omosheyi
Holy Ghost Dominion Bible Church
2 Eke Avenue by Wood Market, Jakpa Road,
Effurun Delta State.
Barrister Nelson
Human Resources Manager in Petroleum Training Institute.
NATIONAL PETROLEUM TECHNOLOGY SYSTEM (NESR AMERICAN COMPANY) NPS SAUDI ARABIA DAMMAM.
DEPARTMENT; COIL TUBING. JOBSTITLE; CT FLUID/NITROGEN OPERATOR
CAREER; i am a field operator in well intervention (fluid pumping and nitrogen operator) in Nesr American Company Nps with significant oil and gas Experience . i joint Nesr American Company 11/01/2019. I have been involve in several aspect of intervention and operation our client is Saudi aramco company. I have work with so many wells of Saudi aramco both rig and rigless from 01/2019 to 09/2019.
CERTIFICATE OBTAIN IN NPS SAUDI ARABIA DAMMAM
1. QHSE PASSPORT in Nesr Company Nps 13/01/2019
2.HYDROGEN SULPHIDE AWARENESS 13/01/2019-12/01/2021
3.BASIC FIRE FIGHTING AND PREVENTION 13/01/2019-12/01/2021
4.CHEMICAL HAZMAT 17/01/2019-16/01/2021
5.BASIC FIRST AID CPR WITH AED 13/01/2019-12/01/2021
6. FSR 13/01/2019-12/01/2021
WORK EXPERIENCE.
18/01/2019. Change of oil wiper seals in triplex fluid pumping spm of 3 and 4 inches,3.5 to 4.5 inches plungers. Greasing of loose equipments such as 2x2 inches plung valves, 2x1inches plung valves, packing of triplex pump using rekit materials. Maintenance and servicing of centrifugal pump with packing of triplex fluid pump. Lubrication of propeller shaft and triplex plungers.
03/02/2019. NITROGEN LIFT AND LOGGING IN RIGLESS WELL LOCATION KHURAIS77, 1001 AND ABIF19 I AM THE OPERATOR OF FLUID PUMPING AND NITROGEN OPERATOR; i rig up fluid pump and nitrogen pump line to the coil tubing reel and surface kill line of Bop i pressure test the injector head,risers and down hole tool in sider the risers with the use of pull test plate and also pressure testing of the surfacekill line of BOP. Pressure testing of both low pressure 500psi while high pressure 5000psi. I assist in rigging up bop and injector head both in connection of snap tight and crossover. Change of Grapper block and stripper rubber with brass nipple. Coil tubing pipe size for the work is 2 and 2.375inches for the LOGGING and NITROGEN LIFT. My pumping rate for fluid pumping 0.5 to 2barrel per minute .
01/04/2019.LOGGING AND NITROGEN LIFT; i pressure test coil tubing pipe connection of down hole tool in side the risers using pull test plate it hold at 500psi in low pressure a[so high pressure 5000psi it hold too. For surface kill line of bop same it hold in both. The location of the well is ABQQ 343 AND 569 is rig less jobs well type vertical . after pressure testing i start pumping mixture of diesel and frition reducer because coil tubing pipe was hook in production tubing i started pumping mixture of diesel friction reducer still will succeeded. Nitrogen kick off i started pumping at rate of 300 to 500scf the well flow move to well 569 same but is nitrogen pumping well flow move to rig SANAD 1501 the jobs program is fishing which is change xp plug by removing the old one leaking putting new one for the well to flow and will succeeded this times is pumping of seawater at the rate 0.7barrel per minute.
04/05/2019. WELL PROGRAMS WELL BORE CLEANOUT IN WELL LOCATION OF UTHMANIA 1501; after pressure testing pumping started taking place i am the operator of fluid pumping with four fra tanks with different chemical such as diesel, gel, slick water, and seawater. I continue pumping by washing the annular and the formation no success is water well move to other location uthmania well 1255jobs program is ACID STIMULATION /NITROGEN WITH THREE FRA TANKS different chemical such as mixture of diesel with friction reducer, hydrochlorine acid, and seawater i am the operator of fluid pumping and nitrogen pumping after pressure testing injector head, Bop and cam or swap valve pumping started when coil tubing have run in hole to about 5000feets no return to fra tank wind valve of xmas tree was open crude oil started flowing it ended in 300bbl before nitrogen pumping kick off take place the pump rate is 300scf i started pumping still i finish 2000gallon of nitrogen i transfer nitrogen liquid started pumping 300bbl i increase it to 500scf finish 2000gallon making 4000gallons but no way still on 300bbl move to other well 415 the jobs program is wellbore cleanout no success it is a water well will move to well 133 location KRSN jobs program is LOGGING and NITROGEN LIFT the coil tubing was stock in well will started using fra tank that have diesel and friction reducer mixture to remove coil tubing pipe from the well but it could not before i use nitrogen to remove it come out before will start nitrogen lift it flow .
Position; COIL TUBING PUMP OPERATOR1-3
Job Performance; Well Lift{Well Pressure is 1700psi}
1. Acid Stimulation{Well Pressure is 1200psi)
2.Gravel Pack(Well Pressure is 2000psi, pump pressure is 3000-5000psi)
3.De-Watting/Swapping to flow station(Pump Pressure is 1800psi pumping Against Pressure1700psi)
4.Well Bore Clean Out, Killing The Well And Bringing it Back To Life With The Help Of Nitrogen
5. Logging And Nitrogen Lift