CURRICULUM VITAE
Name : DESIDERIO B. CABUGUAS
Present Adress : Lower Tawog, Valladolid, Carcar City, Cebu, Philippines
Email : adqzi6@r.postjobfree.com / adqzi6@r.postjobfree.com
Telephone No. : +63-927******* / +63-961*******/ +639*********
PERSONAL DATA
Profession : MECHANICAL ENGINEER
License No. : PRC 0040579
Civil Status : Married
Name of Spouse : Geraldine Dayanan Cabuguas
Place of Birth : Dalaguete, Cebu, Philippines
Religion : Roman Catholic
Languages : English, Filipino, a little in Arabic, and other dialects.
Passport No. : EC6577432
Date of Issue : February 6, 2016
Date of Expiry : February 5, 2021
Place of Issue : DFA Cebu, Philippines
SSS No. : 06-0662145-6
Other Skills : Computer Literate (Word, Excel )
PROFESSIONAL SUMMARY:
Broad experience in Pre-commissioning, Commissioning and Start -up of Thermal Power Plants, Combined Cycle Power Plant, Geothermal Power Plant, Refineries and Fertilizer Plants, Industrial Plant and related Auxiliary Equipments which includes Steam Generator (Coal Fired / FO Fired / Fuel Gas Fired Boiler), Heat Recovery Steam Generator (HRSG), Steam/Turbine, Gas Turbine, Industrial Package Fire Tube Type Boiler, Diesel Generator (for emergency back-up), and balance of plant (BOP) equipments, such as Fuel oil and fuel gas system, HP and LP feed water system, Instrument air and service air system, Nitrogen plant facility, Service water system, RO Plant / Demineralised Water Treatment Plant, Sewage Water Treatment Plant, Potable plant, Chlorination plant, HVAC (Water Chillers System)
Prepare documentation on equipment package systems prior to pre-commissioning and commissioning. Responsible to give instruction to operation staff (operators’) to carry out equipment/system valve line-up/line tracing in preparation for commissioning test schedule. Also prepares necessary tools and materials for pre-commissioning and commissioning activity such as: lube oil flushing, cooling water line flushing, instrument and service air line flushing, fuel gas piping pegged cleaning and fuel oil line flushing, acid cleaning of boiler and main steam lines, motor and equipment trial run operation test. Responsible for trial-run operation of motors and each related equipment/system(s). Responsible for daily log record keeping of equipments in operation and report to immediate supervisor for any abnormality observed during operation
EDUCATIONAL ATTAINMENT
College Education :
Bachelors Degree in Mechanical Engineering
University of the Visayas, Cebu City, Philippines
Graduated October 1981
Government Examination :
Professional Regulation Commission
Board of Mechanical Engineering
Republic of the Philippines
Professional Affiliation:
Member : Philippine Society of Mechanical Engineers ( Saudi Arabia Chapter )
Member : Philippine Society of Mechanical Engineers ( Toledo City Chapter )
PROFESSIONAL PROFILE
Candidate Information
Full Name of Candidate:
Desiderio B. Cabuguas
Nationality:
Filipino
Gender:
Male
ID Card Number:
Telephone:
E-mail:
adqzi6@r.postjobfree.com
Address
Lower Tawog, Valladolid, Carcar City, Cebu Philippines
Language Capability:
Fluent in English and has basic knowledge in Arabic
Educational Qualifications:
Bachelor of Science in Mechanical Engineering
Familiar with the Software:
Yes
Specialities:
Pre-commissioning / Commissioning
Hobbies:
Basketball, Singing Karaoke, Billiard
Proposed Project Position:
Commissioning Engineer
Candidate:
■ Prime Alternate
Previous Employment
Name of Company
PT JGC Indonesia
Current Job Title:
Commissioning Supervisor
Work Location:
Cilacap, Jawa Tengah, Indonesia
Number of Years in Current Job:
7 months
3 weeks
Date Candidate will be Assigned to Project:
As per company’s requirement
Summary of Professional Work Experience
From
To
Job Title
Number of Years in each Job Title
Project Name/Client/Brief Description
Sept
2018
March
2019
Commissioning Supervisor
6 months
Cilacap Blue Sky Project (Pertamina)
Oil and Gas Refinery
PT JGC Indonesia
Jawa Tengah, Cilacap, Indonesia
June 2017
November 2017
Commissioning Engineer
Shift Operation Leader
6 months
Thai Binh 600 MW Thermal Power Plant Project
Coal Fired Power Plant
by Marubeni Corporation
Thai Binh City, Vietnam
June 2016
April 2017
Commissioning Supervisor
10 months
Algeria Oman Fertilizer Project AOFP MHI
Arzew, Algeria
July 2013
Jan 2015
Construction Sr. Superintendent
1 year and 6 months
SADARA (Saudi Aramco Dow Chemical Project) Jubail, Saudi Arabia
Nov 2012
Feb 2013
Commissioning Engineer
3 months
SATORP (Saudi Aramco Total Refining & Petrochemicals Project) Jubail, Saudi Arabia
Aug 2011
Aug 2012
Commissioning Engineer
1 year
Thai Nippon Steel Engineering & Construction Co. (Offshore Services / Brownfield) Bangpakong, Chachuengsao, Thailand
Aug 2010
Aug 2011
Commissioning Engineer
1 year
JGC Gulf International Co. Ltd.
Alkhobar, Saudi Arabia
March 2010
Aug 2010
Commissioning Engineer
5 months
Doosan Heavy Industries & Construction Co., Ltd.
206 MW CFB Coal Fired Thermal Power Plant Project.
Naga City, Cebu, Philippines)
Jun 2008
Mar 2010
Commissioning Engineer
1 year and 9 months
Saudi Electricity Co. (2500 MW Qurayyah Combined Cycle Power Plant) 15 units GE Ga Turbine (FA 7001 Model) Qurayyah, Saudi Arabia
Mar 2004
May 2004
Safety Engineer
2 months
Mekong Energy Co., Ltd. (1500MW Combined Cycle Power Plant Project), Vung Tau Province, Vietnam
Apr 2003
Nov 2003
Commissioning Supervisor
7 months
Kellog Brown & Root (KBR)/ TCC IMI
Esso Exploration and Production Chad, Inc.
Chad, Central Africa
Apr 2001
Aug 2002
Commissioning Technical Adviser
Boiler & Steam Turbine
1 year and 4 months
Mitsubishi Heavy Industries Ltd. ( 1200MW KEPCO Ilijan Combined Cycle Power Plant)
Ilijan, Batangas Cty, Philippines
Jun 1997
Jan 2001
Lead Operator
3 years and 5 months
ORMAT Leyte Co., Ltd./ Philippine National Oil Company ( 50 MW Geothermal Power Plant Project / Malitbog, Kananga, Leyte, Philippines
Jun 1996
Nov 1996
Turbine Supervisor
5 months
Mitsubishi Heavy Industries Ltd. / 1000 MW Aleppo Thermal Power Station 5 units Steam Turbine Generators
Aleppo, Syria
Nov 1994
Aug 1995
Start Up Commissioning Engineer
9 months
MHI Plant Construction Co., Ltd. / 500 MW Nong Chok Combustion Turbine Plant / 4 units 112 MW 701D Gas Turbine Generator
Bangkok, Thailand
Apr 1994
Oct 1994
Shift Operation Engineer
Boiler & Steam Turbine
6 months
LUDO & LUYM Corporation
Coal Fired Power Plant
/ Power Plant Department Cebu City, Philippines
Jul 1991
Aug 1993
Commissioning Engineer
2 years and 1 month
Mitsubishi Heavy Indudtries Ltd. / 1200 MW SCECO Qurayyah Power Plant Project ( Phase 2) Qurayyah, Saudi Arabia
Jan 1989
Jun 1991
Mechanical Engineer
2 years and 6 months
Atlas Consolidated Mining & Dev. Corp.
Coal Fired Power Plant / Coal Conversion Project
96 MW Thermal Power Station / Toledo City Cebu, Philippines
Jan 1982
Jan 1989
Control Room Operator
Boiler Side
7 years
Atlas Consolidated Mining & Dev. Corp.
Sangi Power Station
Coal Fired Power Plant / Coal Conversion Project
96 MW Thermal Power Station / Toledo City Cebu, Philippines
DETAILED WORK EXPERIENCE
Company: PT. JGC Indonesia
Jawa Tenga, Cilacap, Central Java
Indonesia
Position : Commissioning Supervisor
Inclusive Date : September 6, 2018 - March 30, 2019
Duties and Responsibilities:
Reporting to Commissioning Manager
Supervise pre-commissioning personnel/contractors for the air blowing activities for piping for systems and sub-systems of the utility plant.
Prepare work permit for the planned activities for pre-commissioning particularly Air Blowing of piping, water flushing, drying out of piping lines and nitrogen preservation.
Supervise start up and commissioning activities of the power plant, including boiler, steam turbine generator and Balance of plant.
Conduct Mechanical Run Test of all equipments in utility area and FOC area (Fuel Oil Complex)
Assure all activities such as water flushing/ Air Blowing and reinstatement of piping components and local instruments, leak test, motor solo run-in, machinery run-in, as well as static equipment inspections, cleaning, internal installations and box- up are duly performed in accordance with the stated procedures, and in conformity with the safety rules and as per the instruction of Commissioning Manager or Commissioning Superintendent.
Conduct Air Blowing, Water flushing, chemical cleaning, nitrogen preservation of piping in Systems and Sub systems.
Supervise discipline sub contractors punch list close out as per given priority by the Pre-commissioning team.
Maintain updated progress report of closed punch list items
Monitor status of pending priority punch list items in each sub system and keep Construction Management informed
Receive (by discipline supervisors) original punch list recording them on the punch list record
Logbook and assuming their insertion in the Mechanical Completion Data base.
Company : Fuji Electric Company
Thai Binh Thermal Power Plant
600 MW Coal Fired Power Plant
Pulverized Type Boiler with Cold Reheat, Hot Reheat Steam
Location : Thai Binh City, Vietnam
Position : Commissioning Engineer / Shift Operation Leader
Inclusive Date : June 6, 2017~ October 30, 2017
JOB DESCRIPTION
Responsible for a safe start up and commissioning activities of the power plant, including boiler, steam turbine generator and Balance of plant and its auxiliaries in accordance with the vendor’s commissioning and start up procedures.
Lead daily plan of plant commissioning in order to ensure the targets are achieved efficiently and safely and within the company rules and OEM guidelines, legal, environmental and other requirements during commissioning.
Coordinate with respective vendor for all equipment on boiler side, steam turbine side and balance of plant equipment particularly on FGD (Flue Gas Desulphurization, ESP (Electrostatic Precipitator), Bottom Ash) Fly Ash, both on dry side and wet side.
Follow up loading of coal to coal bunkers as well as in the Coal Storage area, Jetty area receiving coal from barges.
Coordinate with the Load Dispatching Center for all commissioning activities specifically during Boiler tuning, Load rejection test, Power swing test, APS, /ASD/BMCR/ or TCC Run back test and House load test s well as in synchronization of Steam Turbine Generator for the required generated load megawatts to be produced at a specific time.
Follow up and coordinate the Permit To Work (PTW) by assisting in the implementation of company policies, safety procedures particularly on LOTO (Lock Out/Tag Out) procedures.
Maintain harmonious relation and camaraderie with all staffs working in the CCR (Central Control Room)) as well as outside field personnel in order to attain a successful, efficient and risk free environment. of a power plant.
Aware of the latest trend in safety application and protection and disseminate to fellow personnel working in the power plant.
Prepare a daily report for the commissioning activities.
Provide training for Owner operators during on the Job Training period(OJT)
Company : Mitsubishi Heavy Industries Ltd.
Algeria Oman Fertilizer Project / Arzew Industrial Area
Port Joules, Arzew City, Algeria
Position : Commissioning Supervisor
Inclusive Date : June 14, 2016 – April 30, 2017
JOB DESCRIPTION
Reporting to the Utility Commissioning Head
Supervise personnel on the start-up and commissioning of utility unit and equipment for the Ammonia Plant and Urea Plant respectively.
Check the feasibility of pre-commissioning/commissioning of procured item/units in coordination
with the Construction Team.
Close coordination with HSE and QA/QC departments to set up the procedures for safe
and efficient pre-commissioning/commissioning activities.
Supervise commissioning and operation personnel activities during start up of utility equipment particularly
Gas Turbines, HRSGs, Emergency Diesel Generators, Closed Circuit Water Systems, Fire Fighting Systems
Waste Water Systems, Flare Systems, Instrument Air and Service Air Systems, Sea Water Systems, Demineralized water Unit Systems, Chlorination Unit Systems.
Supervise task force personnel on the loading and unloading of by-product of the fertilizer plant which is the 40 % Ammonium Sulfate Solutions to temporary tanks.
Maintain harmonious relations with the superiors and other commissioning personnel as well as to subordinates in the plant.
Company : FOSTER WHEELER / SOFCON
Karawan Towers Corniche Rd. Alkhobar,P.O. Box 3998.
31952 Kingdom of Saudi Arabia
Position Held : Pre-Comm / Commissioning Engineer
Project Management Team
Project : SADARA ( Saudi Aramco & Dow Chemicals )
Tank Farms Project( Cryogenic / Feedstock / Main Site Tank Farm
Al Sharquiah, Jubail 2, Kingdom of Saudi Arabia
Inclusive Date : July 31, 2013 ~ January 31, 2015
JOB DESCRIPTION
Reporting to Pre-commissioning Manager.
Check the feasibility of pre-commissioning/commissioning of procured item/units in coordination with Construction Team.
Close coordination with HSE and QA/QC departments to set up the procedures for safe
and efficient pre-commissioning/commissioning activities.
Supervise Pre-commissioning personnel activities to acquaint with Water Flushing,
Air Blowing, Pneumatic Test, Hydro Test, Leak Test, Steam Blowing of lines, Nitrogen purging etc.
Commissioning and Start-up of rotary equipment and E&I systems such as: Start-up of Distributed Control Systems (DCS), Firewater System, Electrical and HV/LV switchgear
in Substations as well as static equipment.
Company : SPIE Oil and Gas Services LLC.
Position Held : Mechanical Commissioning Engineer
Project : SATORP (Saudi Aramco Total Refining & Petrochemicals
JERP (Jubail Export Refinery Project)
Jubail 2, Kingdom of Saudi Arabia
Inclusive Date : November 18, 2012 to February 13, 2013
JOB DESCRIPTION
Manage the coordination of mechanical commissioning activities for the related activity in the project.
Ensure that pre-commissioning and commissioning activities are well planned and are fully integrated with the schedules and requirements.
Prepare commissioning plans and review commissioning documentation.
Ensure planning, coordination, execution and follow up pre-commissioning and commissioning activities are completed in accordance with specifications.
Reporting on progress of activities.
Support Operations of the Commissioning activity for Project handover and input from FEED through to the handovers to the Operations team.
Coordination of Project Commissioning teams.
Company : Thai Nippon Steel Engineering & Construction Corp., Ltd.
14 Moo 14, Tambol Bangpakong, Amphur Bangpakong
Chachuengsao, Thailand 24130
Position Held : HUC Up Commissioning Engineer (Offshore Services / Brownfield)
Inclusive Date : August 22, 2011 ~ August 21, 2012
JOB DESCRIPTION
Prepare procedures for pre-commissioning of equipment in Platform such as Instrument Air Compressor, Emergency Diesel Generator, HVAC and
other related auxiliaries onshore and proceed commissioning activity at offshore.
Familiarization of the project designed and operation philosophy by reviewing the
design manual, P & IDs, instrument control drawings and technical requisition packages with other relevant documentation.
Identify the level of involvement of commissioning in Factory Acceptance Testing (FAT)
Develop a Commissioning Manual which entails commissioning philosophies, commissioning scope of work, acceptance criteria, commissioning procedure, handover procedure, and start up sequence.
Prepare the Commissioning Check Sheets Overviews.
Prepare the Vendor Assistance Schedule.
Company : JGC Gulf International Co. Ltd.
P.O Box 2257, Alkhobar 31952 Saudi Arabia
Position Held : Commissioning Enginee
r
Inclusive Date : August 30, 2010 – July 31, 2011
JOB DESCRIPTION
Prepare procedures for pre-commissioning, start-up and commissioning of equipment in power plants, oil and gas plants, refineries and other industrial institutions.
Pre-commission equipments and auxiliaries based on the manufacturer’s standard operating procedures.
Coordinate with the clients during pre-commissioning activities of refineries, oil and gas plants as well as power plants.
Develop a Commissioning Manual which entails commissioning philosophies.
Prepare the Commissioning Check Sheets Overviews.
Prepare the Vendor Assistance Schedule
Company : DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO., LTD
Coal Fired Power Plant Project
206 MW KEPCO SPC POWER CORPORATION
Naga City, Cebu, PHILIPPINES
Position Held : COMMISSIONING ENGINEER
Inclusive Date : March 23, 2010 ~ August 22, 2010
JOB DESCRIPTION
Directly reporting to Commissioning Manager for the start up and commissioning
of Boilers, steam turbines as well as balance of plant equipment and other auxiliaries relating to the boilers and steam turbines.
Coordinate with construction personnel as well as respective vendor for all equipment on boiler side, steam turbine side and balance of plant equipment particularly on FGD (Flue Gas Desulphurization, ESP (Electrostatic Precipitator), Bottom Ash) Fly Ash, both on dry side and wet side.
Follow up loading of coal to coal bunkers as well as in the Coal Storage area, Jetty area receiving coal from barges.
In-charge of the DCS system at the Central Control Room and coordinate with
Mechanical, Electrical and I & C personnel and vendors for the commissioning, operation and simulation tests of units and equipments.
Make local inspection of installed equipments as well as instruments and counter checking it in the P & ID for proper installation based on the plans and documents of the vendor of the equipments.
Company : SAUDI ELECTRIC COMPANY
2500MW Qurayyah Combined Cycle Power Plant
15 Units GE Gas turbines (FA 7001FA)
Qurayyah, Kingdom of Saudi Arabia
Position Held : COMMISSIONING ENGINEER
Inclusive Date : June 29, 2008 ~ March 11, 2010
JOB DESCRIPTION
Supervise commissioning personnel during start-up and commissioning of Boilers, Gas
Turbines, Steam Turbines and its associated auxiliaries.
Control, direct and supervise all operators on each unit of the of combined cycle
power plant and maintain a log or records of all operation activities.
Assist the CRO in performing a safe start-up, shutdown of any unit as needed.
Assist the CRO in performing tests on the unit as required to ensure safe, efficient and reliable operation of the plant
Supervise field operators in checking and troubleshooting problems in the field.
Perform switching operation on all switchgears 380KV to 480V and to isolate
or put in service equipments for maintenance testing or operational reasons.
Company : TCC / IMI
Project Name : ESSO Exploration and Production Chad Inc.
Chad, Central Africa
Position Held : COMMISSIONING SUPERVISOR
Date : April 1, 2003 ~ November 15, 2003
JOB DESCRIPTION
Supervise personnel in the commissioning of equipment in Oil Gathering Station.
Make routine pep talk to personnel regarding observance of industrial safety & hygiene & implement standard procedure in performing assignment task.
Rightly disseminate to subordinates any oral or written communication coming from the management for information, guidance & implementation, In turn, echoes to the management any problem & concern coming from the ranks.
Prepare work permits for any activities to be done for the day and have it signed by the Safety Department for proper confirmation of safety requirements and precaution.
Prepare reports for the daily commissioning activities and send it electronically to Commissioning Superintendent and Commissioning Manager for acknowledgment.
Company : MITSUBISHI HEAVY INDUSTRIES LTD.
Philippine Jurong Engineering Ltd. (PJEL)
Project Name : 1200MW KEPCO Ilijan Combined Cycle Power Plant
Ilijan, Batangas City, Philippines
Position : COMMISSIONING TECHNICAL ADVISER
Inclusive Date : April 5, 2001 ~ August 15, 2002
JOB DESCRIPTION
Provide technical assistance in start-up and commissioning of gas turbines and steam turbines and HRSG respectively.
Coordinate with Mechanical, Electrical, Instrument & Control and DCS personnel during start-up and commissioning of equipments.
Supervise start-up and commissioning personnel in the lube oil and control oil flushing of pipelines for Gas Turbines and Steam Turbines.
Conduct interlocking test for gas turbines and steam turbines control setting and system protection and coordinate with Electrical, Instrument & Control and DCS personnel.
Control and monitor operating condition of gas turbines, steam turbines and HRSG unit parameters at the Central Control Room.
Company : ORMAT LEYTE CO., LTD.
50MW Geothermal Power Plant
Matibog, Kananga, Leyte, Phillippines
Position : LEAD PLANT OPERATOR (Control Room)
Date : June 1997 ~ January 2001
JOB DESCRIPTION
Start-up and commissioning of Steam Turbine Generators and its associated auxiliaries.
Control and monitor operation of Steam Generators and its associate auxiliaries for various sites and coordinate with PNOC Load Dispatcher for the smooth and efficient distribution of electrical power to LEYTE-CEBU grid via submarine cable and to LEYE-LUZON grid via HVDC inverter.
Coordinate with PNOC/FCDS the geothermal steam controller for the appropriate and efficient supply of steam under certain load limitations and conditions as well as its standard quality and stability.
Execute Standard Operating Procedure during star-up and shutdown of unit by following the manual of instruction of the manufacturer.
Supervise operation personnel for the smooth and efficient operation of the power plant.
Issue Safety Work Permit (SWP) to concerned section during corrective works to ensure the safety of personnel as well as company property and coordinate their activities in order to attain a smooth an efficient corrective works.
Maintain cleanliness and execute good housekeeping in the Control Room and its nearby surrounding especially on control panel and control board.
Maintain harmonious relation and camaraderie to all colleagues and personnel in the power plant.
Company : MITSUBISHI HEAVY INDUSTRIES LTD.
Takasago Machinery Works
2-1-1 Arai-Cho, Takasago Cho, Osaka, Japan
Project Name : 1000MW Aleppo Thermal Power Station
5 x 220MW Steam Turbine Generators & Boilers
Aleppo, SYRIA
Position : TURBINE SUPERVISOR
Inclusive Date : June 1996 ~ November 1996
JOB DESCRIPTION
Directly reporting to Chief Mechanical Engineer.
Supervise construction personnel in the installation of steam turbines and its associated auxiliaries.
Initiate reports regarding status of the works being undertaken by the contractor.
Observe safety rules and regulation within the working premises and disseminate information to subordinates.
Maintain harmonious relation and camaraderie among fellow personnel and subordinates.
Company : MHI PLANT CONSTRUCTION CO., LTD.
Hiroshima City, Japan
Project Name : 500MW EGAT Nong Chok Combustion Turbine Plant
4 units 112MW 701D Gas Turbine Generators
Bangkok, Thailand
Position : START-UP COMMISSIONING ENGINEER
Inclusive Date : November 1994 ~ August 1995
JOB DESCRIPTION
. Directly reporting to the Chief Commissioning Engineer.
. Start-up and commissioning of Gas Turbines and its associated auxiliaries.
.Scheduling of activities in daily and weekly basis of start-up and commissioning works.
.Observe safety rules and regulations and disseminate information to subordinates.
.Maintain harmonious relation and camaraderie among fellow personnel in the
power plant.
Company : LUDO & LUYM CORPORATION
20 MW Coal Fired Power Plant
Tupas St. Cebu City, Philippines
Position : SHIFT OPERATION ENGINEER
Inclusive Date : April 15, 1994 ~ October 21, 1994
JOB DESSCRIPTION
Directly reporting to Power Plant Operation Superintendent.
Supervise operation personnel for the smooth and efficient operation of steam turbine generators and boilers to produce adequate supply of power for the operation of equipment.
Monitor adequate supply of coal on respective bunkers as well as deliveries from ships and barges.
.Trouble shoots any untoward problems regarding operation of the power plant.
Company : MITSUBISHI HEAVY INDUSTRIES LTD.
Nagasaki Shipyard and Machinery Works
Nagasaki City, Japan
Project Name : 1200MW SCECO Qurayyah Power Plant (Phase 2)
Qurayyah, Kingdom of Saudi Arabia
Position : COMMISSIONING ENGINEER
Inclusive Date : July 1991 ~ August 1993
JOB DESCRIPTION
Directly reporting to MHI Commissioning Engineer.
Start-up and commissioning of 2 x 600MW Steam Turbine Generators and its
auxiliaries.
Coordinate with Mechanical, Electrical, Instrument & Control sections during
commissioning of equipment.
.Recording of data and parameters on units for operation reference and
performance calculations.
Assist the CRO in performing a safe start-up, shutdown of any unit as needed.
Assist the CRO in performing tests on the unit as required to ensure safe, efficient and reliable operation of the plant
Supervise field operators in checking and troubleshooting problems in the field.
Perform switching operation on all switchgears 380KV to 480V and to isolate
or put in service equipments for maintenance testing or operational reasons.
Company : ATLAS CONSOLIDATED MINING & DEV. CORP.
96MW SANGI POWER STATION
Coal Fired Power Plant (AFBC Type)
Sangi, Toledo City, Cebu, Philippines
Position : MECHANICAL ENGINEER
Inclusive Date : January 11, 1989 ~ July 15, 1991
JOB DESCRIPTION
Keeping History Files of all running equipment and auxiliaries of
the power plant.
Conduct periodic survey of all units and equipment.
Initiate preventive maintenance work schedule on all equipment in operation.
Check and evaluate equipment spare parts during overhaul and repair in line
with the manufactures specification in relation to alignment and tolerances of
working parts.
Prepare shutdown and PMS activities of major equipment.
Prepare sketches and drawings of equipment minor spare parts and initiate work order to Machine Shop Department for fabrication and machining job.
Handle preparation of materials and spare parts needed for shutdown of equipment and based on scheduled PMS and unscheduled repair with the coordination of the Ordering & Logistic Section.
Handle predictive services of all power plant equipment like vibration monitoring and lube oil servicing.
Prepare monthly reports on the status of equipment and its associated auxiliaries and handover to the Plant General Superintendent for acknowledgment and recommendation for shutdown of units.
Prepare shutdown and PMS activities of major equipment and its associated auxiliaries.
Company : ATLAS CONSOLIDATED MINING & DEV. CORP.
96MW SANGI POWER STATION
Coal Fired Power Plant (AFBC Type)
Sangi, Toledo City, Cebu, Philippines
Position : CONTROL ROOM OPERATOR
Inclusive Date : January 2, 1982 ~ January 10, 1989
JOB DESCRIPTION
Reporting to Control Room Supervisor and Shift Charge Engineer.
Start-up and commissioning of boilers and its associated auxiliaries.
Control and monitor for the safe and efficient operation of Boilers and its associated auxiliaries.
Monitor the supply of coal to bunkers and advised field operator to monitor closely the quality of coal in order to attain smooth and efficient supply to boilers.
Coordinate with PTW (Permit To Work) Coordinator for any equipment to be done by maintenance personnel in order to attain a accident free environment and protection of equipment and safety of personnel working in the plant.
Issue of Safe Works Permits (SWP) to concerned section during corrective works to ensure
the of personnel and coordinate their activities.
Maintain harmonious relation and camaraderie with all staffs working in the CCR (Central Control Room)) as well as outside field personnel in order to attain a successful, efficient and risk free environment. of a power plant.
Aware of the latest trend in safety application and protection and disseminate to fellow personnel working in the power plant