PROFESSIONAL PROFILE
●B. Tech from (D.C.E.) Delhi University.
●Diploma InEngineering from Aligarh Muslim University.
●With more than Ten years of experience in Instrumentation & Process Control, Application software development, Client technical support etc.
●Having Saudi Armaco Approval as Electrical QC Engg.
●Having American Bureau of shipping and industrial Verification Approval as E & I QC Engg
●Problem management & resolution for new & existing systems for various industries such Oil Refinery, Petrochemical, Automobile, food & beverage, metals, power plant, material handling, paper & packaging.
KEY RESULT AREAS
●P&ID, schematic diagrams.
●Field installation, start-up & support.
●Instrumentation and control system development
●System integration, project erection& commissioning.
●Resolving unusual & complex problems in instrumentation & process control.
●HMI & SCADA Configuration: DeltaMessung, Mitsubishi.
●Machine prototype design, analysis and machine qualification.
●Drives and associated systems.
PROFESSIONAL EXPERIENCE
Presently working with Inco Group Of Companies Instrument Engineer
Company : Inco Group Of Companies
Name of Client : TRD
Designation : Instrument Engineer
Duration : From 15th April 2021 to Till Continue
Project : Duqm MPEI TR- Common works
●Carrying out technical discussions with senior engineer on P&ID, Functional Diagram & Hook Up diagram, Panel Circuit Diagram issues, specific installation details, material and systems.
●Delegate with supervisor/foreman for Instrument work installation on site and track daily progress, daily material consumption and man hour. Delegate with site supervisor to prepare 3 weeks look ahead plan for material, consumable items, tools and manpower.
●Conducting task launch meeting briefing the installation process, safety measures, risk assessment, inspection and test plan as per the approved method statement.
●Conducting task launch meeting briefing the installation process, safety measures, risk assessment, inspection and test plan as per the approved method statement.
●Preparing and follow up all submittals for site inspection, material inspection and mock up inspection ensuring work has been completed adhering to project quality plan.
Company : GAMA POWER SYSTEM ENGINEERING AND CONTRACTING
Name of Client : ALBA
Designation : E & I (QA/QC) Engineer
Duration : From 6s t Nov 2018 to April 2020
Project : The Line 6 expansion Project
●Installation of conduits and sub conduits, cable pulling testing and termination of cat cable and FOC cable.
●Testing of cat cable, splicing and OTDR of FOC cable.
●Installation of cameras, telephone, routers, controllers, card reader, security boom gate, turnstiles, emergency exit push button, door contact, Biometric door access.
●Ensures all Instrumentation & Telecom Construction work are done in accordance of scope of work, issued for construction (IFC) drawings client specification.
●Carry out planned inspection, surveillance inspection & released hold points by signing various quality records as proof of inspection conforming to specification
●Ensure implementation of approved work procedures & inspection and test plan (ITP)
●Issue Request For Inspection (RFI) or field Inspection Notice (FIN) to client as defined by the inspection and test plan (ITP)
●Coordinate to the other quality discipline activities that require inspection with the Instrumentation & Telecom construction program have been inspected and approved to prevent unnecessary reworks to keep the activity within the budget and on the schedule
●Carry out inspection when it arrives in the warehouse to ensure the materials conforming to the project specification & standard requirements
●Ensure all instruments were installed and tested as per project quality procedures & project specification and preparation of (QR) forms instruments installation inspection
●Coordination of pressure testing, impulse line etc.
●To ensure that all inspection and test records are properly documented and made available for handover to the client, on completion in accordance with contract requirements
●Prepare quality control check sheets for each equipments unit installed.
●Conducts all electrical / Instrumentation and Fiber optical cable (FOC) inspection as per approved ITP.
●Maintaining storage areas and arranging infrastructure to ensure smooth flow of operations
●Conducting inventory analysis, vendor rating and development with regular inventory verification of stock item.
Governing the inventory analysis so as to curtail inventory-holding expenses and adherence to the minimum inventory level to minimize wastage
Company : AFG - MMS
Name of Client : Hyundai Heavy Industries (HHI)
Designation : E & I (QA/QC) Engineer
Duration : From 1s t April 2018 To 1st Nov 2018
Project : Shuquiq Power Plant
●Ensure that inspection stages are carried out in line with approved Inspection & Test Plan(ITP).
●Physically check the work in progress and ensure it is performed in accordance with Project Specifications, drawings, approved procedures & codes
●Prepare RFI notification for Client inspection on material, construction work, calibration work & Pre-commissioning activities.
●Liaise with Site Engineer and supervisors on day to day basis to deliver high quality work.
●Identify & report non-conformance if the construction work is not done as per approved drawing & procedures.
●Monitor & verify agreed corrective action
●Regular reporting to QC Engineer & Manager, on any major issues which require immediate action.
●Ensure that all mechanical completion test sheets are filled in after inspection of installed equipment, cables, and other electrical & instrumentation instruments/devices.
●Liaise with Client QC & Third party and obtain signatures for the documentation.
●Inspection of installation of instruments like Level, Pressure, Temperature & Flow Transmitters, Gauges, Switches & Control valves
●Inspection of all type cable tray installation as per NEMA V2 with IFC drawing.
●Inspection of Continuity and Insulation Resistance Test for Cables Prior to the Installation
●Responsible for Witnessing Hi-Pot test for MV & HV cables
●Responsible for Witnessing Transformer testing like Insulation resistance, Turns ratio, Magnetic balance test, Magnetizing current test, Vector group test & Winding resistance test.
●Responsible for Witnessing Motor Winding and Insulation resistance test.
●Responsible for the inspection of installation of Conduits and fittings (above and below ground), Cable trays, Cables, Junction Boxes, LCS, Motors, as per the project specification.
●LV Cable (Power, Control) and MV Cable Termination.
●Grounding and Lightning Protection Installation.
● LV distribution board panel, Motor control center (MCC) panel & Switchgear(MV & LV) panel installation.
●Witnessing motor Solo-Run test (LV & MV)
●Responsible for the inspection of fire alarm system.
●Witnessed FDAS functional test and Performance test.
●Responsible for the installation inspection of Patch Panel, CCTV, PA/GA Paging System etc.
●Responsible for the installation inspection of underground cable routing which includes, Hand hole or Manhole installation, trench excavation and sand bedding, FOC Conduit laying, Sub duct pulling with pull rope, OSP FOC pulling.
●Responsible for witnessing FOC Splicing and OTDR test.
●Witnessed and approved quality assurance and control of materials procured, drawings and documentation, specification checks, installation, calibration, SAT, field and workshop tests, system.
●Material receiving of instrument trays, conduits, panels, Cables, Junction boxes, different instruments & accessories.
●Witnessing the bench & field Calibration & maintaining the records.
●Maintaining the calibration records of testing instruments & equipment.
●Inspection of cable tray, conduit installation as per standards
●Inspection of panels, Junction boxes as per standards
●Inspection of Cable pulling, Continuity and Insulation Resistance Test & Cable termination as per drawings.
●Witnessing the Loop check of TT, PT, LT, FT, DPT, TS, PS, LS, FS & Valves.
Company : GAMA POWER SYSTEM ENGINEERING AND CONTRACTING
Name of Client : Saudi Electricity Company (SEC)
Designation : Electrical (QA/QC) Engineer
Project : 1800 MW Combined Cycle Power Plant project
●Installation of conduits and sub conduits, cable pulling testing and termination of cat cable and FOC cable.
●Testing of cat cable, splicing and OTDR of FOC cable.
●Installation of cameras, telephone, routers, controllers, card reader, security boom gate, turnstiles, emergency exit push button, door contact, Biometric door access.
●Ensures all Instrumentation & Telecom Construction work are done in accordance of scope of work, issued for construction (IFC) drawings client specification.
●Carry out planned inspection, surveillance inspection & released hold points by signing various quality records as proof of inspection conforming to specification
●Ensure implementation of approved work procedures & inspection and test plan (ITP)
●Issue Request For Inspection (RFI) or field Inspection Notice (FIN) to client as defined by the inspection and test plan (ITP)
●Coordinate to the other quality discipline activities that require inspection with the Instrumentation & Telecom construction program have been inspected and approved to prevent unnecessary reworks to keep the activity within the budget and on the schedule
●Carry out inspection when it arrives in the warehouse to ensure the materials conforming to the project specification & standard requirements
●Ensure all instruments were installed and tested as per project quality procedures & project specification and preparation of (QR) forms instruments installation inspection
●Coordination of pressure testing, impulse line etc.
●To ensure that all inspection and test records are properly documented and made available for handover to the client, on completion in accordance with contract requirements
●Prepare quality control check sheets for each equipments unit installed.
●Conducts all electrical / Instrumentation and Fiber optical cable (FOC) inspection as per approved ITP.
●Maintaining storage areas and arranging infrastructure to ensure smooth flow of operations
●Conducting inventory analysis, vendor rating and development with regular inventory verification of stock item.
Governing the inventory analysis so as to curtail inventory-holding expenses and adherence to the minimum inventory level to minimize wastage
Company : ENKA Isaat ve sanayi A.S
Name of Client : Mass Group Holding
Designation : E & I (QA/QC) Engineer
Project : 3000 MW Bagdad Power Plant Project
●To review and supervise Installation, Commissioning & Calibration of different type of Transmitters like Pressure Transmitter, Level Transmitter, Flow Transmitter, Temperature Transmitter etc.
●To Review and Supervise Installation, Commissioning & Calibration of Switches, Gauges and Sensors like Limit Switch, Level Switch, Pressure Switches, Temperature Switch, Pressure Gauges, Temperature Gauges, RTD, Thermocouple etc.
●Supervises the Termination from field to Junction Box & from junction Box to HONEYWELL DCS Panel.
●In charge of Inspection of Material, Testing and Calibration of field instrument.
●Responsible for preparing RFQs, technical bid summaries, purchase orders of Instruments for client.
●Supervision of instrument cable termination & continuity checking at both instrument sides & field junction box sides in accordance with the designed drawings.
●Supervise Installation of Impulse hookup line.
●Maintaining storage areas and arranging infrastructure to ensure smooth flow of operations
●Conducting inventory analysis, vendor rating and development with regular inventory verification of stock item.
Governing the inventory analysis so as to curtail inventory-holding expenses and adherence to the minimum inventory level to minimize wastage
Company : Sach Electromac Pvt Ltd
Name of Client : Cairn India Ltd.
Designation : E & I Engineer . Project : Central polymer facility (Enhance oil recovery) Company
EOR Project Details:-Cairn India Ltd. has taken up a US $600 million polymer flood EOR project forMangala Field in RJ-ON-91/1 block Rajasthan, to enhance crude oil recovery.It is second world largest EOR project With strategic focus on increasing ultimate recovery from operating fields. Oil production in Mangala has reached its peak, the operator is implanting EOR scheme with Alkali surfactant polymer (ASP) flooding in Mangala fields to maintain a plateau production rate over a longer period to increase oil recovery.
●EOR injection well commissioning
●Crude oil well commissioning
●In charge of Supervising the Erection and Commissioning activities at project Site
●To review and Supervise Installation commissioning & calibration of different type of Transmitters like Pressure Transmitter level Transmitters.
●Carrying out technical discussions with senior engineer on P&ID, Functional Diagram & Hook Up diagram, Panel Circuit Diagram issues, specific installation details, material and systems.
●Delegate with supervisor/foreman for Instrument work installation on site and track daily progress, daily material consumption and man hour. Delegate with site supervisor to prepare 3 weeks look ahead plan for material, consumable items, tools and manpower.
●Conducting task launch meeting briefing the installation process, safety measures, risk assessment, inspection and test plan as per the approved method statement.
●Conducting task launch meeting briefing the installation process, safety measures, risk assessment, inspection and test plan as per the approved method statement.
●Preparing and follow up all submittals for site inspection, material inspection and mock up inspection ensuring work has been completed adhering to project quality plan.
Company : American Bureau of Shipping & Industrial Verfi.
Name of Client : Cairn India Ltd
Designation : E& I (QA/QC) Engineer
Project : M.D.P. P. Bhogat Terminal (Gujarat)
Project details: The 416-mile (670km) long Mangala Development Pipeline (MDP) is a crude oil pipeline that runs from Barmer Rajasthan, to the Jamnagar district of Gujarat, India. It is longest continuously heated pipeline in the world and the first such pipeline in India. The 24 inch pipeline has a capacity of 175,000bopd. It is part of Cairn India's Mangala oil field development plan. The MDP is operated by Cairn India with 70% ownership in the project. The remaining 30% is owned by the Oil and Natural Gas Corporation (ONGC).
Follow up and Co-ordination
●Carrying out technical discussions with senior engineer on P&ID, Functional Diagram & Hook Up diagram, Panel Circuit Diagram issues, specific installation details, material and systems.
●Delegate with supervisor/foreman for Instrument work installation on site and track daily progress, daily material consumption and man hour. Delegate with site supervisor to prepare 3 weeks look ahead plan for material, consumable items, tools and manpower.
●Conducting task launch meeting briefing the installation process, safety measures, risk assessment, inspection and test plan as per the approved method statement.
●Conducting task launch meeting briefing the installation process, safety measures, risk assessment, inspection and test plan as per the approved method statement.
●Preparing and follow up all submittals for site inspection, material inspection and mock up inspection ensuring work has been completed adhering to project quality plan.
Site Installation
●In Charge of Supervising the Erection and Commissioning activities at Project site
●To review and supervise Installation, Commissioning & Calibration of different type of Transmitters like Pressure Transmitter, Level Transmitter, Flow Transmitter, Temperature Transmitter etc.
●To Review and Supervise Installation, Commissioning & Calibration of Switches, Gauges and Sensors like Limit Switch, Level Switch, Pressure Switches, Temperature Switch, Pressure Gauges, Temperature Gauges, RTD, Thermocouple etc.
●Supervises the Termination from field to Junction Box & from junction Box to HONEYWELL DCS Panel.
●In charge of Inspection of Material, Testing and Calibration of field instrument.
●Responsible for preparing RFQs, technical bid summaries, purchase orders of Instruments for client.
●Supervision of instrument cable termination & continuity checking at both instrument sides & field junction box sides in accordance with the designed drawings.
●Supervise Installation of Impulse hookup line.
●Directing and monitoring the engineering work to be carried out in accordance with Client instruction and requirement.
●SAFETY MEASURESas per site requirement.
(IV) Company : Miraj Instrumentation Services (I) Pvt. Ltd
Designation : Electrical & Instrumentation Engineer
Client : HPCL Mumbai
Project : E5.5 MMTPA Implementation Green fuel & Emission Control.
Main Activities and Responsibilities
●Supervises the Installation of Instrument with the help of construction drawings such as location drawing, wiring layouts, hook-up connection, P & ID’s, typical installation details, loop diagram, logic diagram.
●Supervises the Termination from field to Junction Box & from junction Box to DCS Yokogawa Panel/PlC
●Supervises the Installation Of Field Instruments like Pressure, Flow, Level,Temperature Transmitters & Flow meters
●Supervises the Hot Loop & Cold Loop Checking from Field To Junction Box & from Junction Box to MCC Panel to DCS/PLC.
●Knowledge of Installation, Commissioning & Calibration of Switches, Gauges and Sensors like Limit Switch, Level Switch, Pressure Switches, Temperature Switch, Pressure Gauges, Temperature Gauges, RTD, Thermocouple etc.
●Supervises the Calibration of Control Valve, Transmitters, RTD, Thermocouple
●Maintained & Calibration of Control valves, Solenoid Valves, thermocouples, RTDS
●Sensors, flow Sensors (Mass flow meters, Magnetic Flow meters) Level Sensors/Transmitter, I to P Converters.
(V) Company : Larsen &Tubro Limited, Mumbai
Designation : E&I Supervisor
Client : BPCL Mumbai
Project : Sulphur Recovery Unit BPCL Mumbai.
Main Activities and Responsibilities
●Ensures all Electrical & and Instrumentation Construction work are done in accordance of scope of work, issued for construction (IFC) drawings client specification.
●Carry out planned inspection, surveillance inspection & released hold points by signing various quality records as proof of inspection conforming to specification
●Ensure implementation of approved work procedures & inspection and test plan (ITP)
●Issue Request For Inspection (RFI) or field Inspection Notice (FIN) to client as defined by the inspection and test plan (ITP)
●Coordinate to the other quality discipline activities that require inspection with the Electrical/Instrumentation construction program have been inspected and approved to prevent unnecessary reworks to keep the activity within the budget and on the schedule
●Carry out inspection when it arrives in the warehouse to ensure the materials conforming to the project specification & standard requirements
(VI) Company : JMC Project India Ltd. Chennai, India
Duration : From July 2010 to May 2011
Designation : Electrical &Instrumentation Engineer
Client : Manali Refineries Ltd. Chennai, India
Project : Capacity Expansion cum Modernization project
Main Activities and Responsibilities
●Installation Inspection of Communication systems and Equipments.
●Witnessing of FOC Cable Testing by OTDR and cable splicing.
●All inspections are based on client specification, drawings and Quality Manual.
●Carrying out Inspection as per the standard adopted by the organization.
●Capable of getting the job done by within the target.
●Conducting periodic checks to ensure performance of various equipment and providing trouble-shooting support for the machine.
●Implementing safety improvements and preparing raw material correction plan.
●Maintenance& calibration of control valves, solenoid valves, thermocouples, RTDS, Temperature
Sensors, flow sensors (mass flow meters, magnetic flow meters) Level sensors/ Transmitter, I to P
Converters.
●Installation, programming & Wiring of Drives etc.
●Maintaining ISO-9001-2008, ISO-14001 Documentation like CALIBRATION & HISTORY REPORT etc. Also face the Internal& External Audit.
●Handling DCS (YOKOGAWA: CENTUM CS 3000 R3. 09.00) system.
VII Company : United Construction Company(U.C.C.)
Design : Electrical &Instrumentation Engineer
Client : N.T.P.C. Badarpur Delhi
ProjectDetails:-Badarpur Thermal Power Station is located at Badarpur area in NCT Delhi. The power plant is one of the coal based plant of NTPC .The Badarpur power station has an installed capacity of 750 Mega Watts.This plant has five units out of which three are of 95 Mega watts and two are 210 Mega watts.
Main Activities and Responsibilities
●In charge of Supervising the Erection and Commissioning activities at project Site
●To review and Supervise Installation commissioning & calibration of different type of Transmitters like Pressure Transmitter Level Transmitters.
●Carrying out technical discussions with senior engineer on P&ID, Functional Diagram & Hook Up diagram, Panel Circuit Diagram issues, specific installation details, material and systems.
●Delegate with supervisor/foreman for Instrument work installation on site and track daily progress, daily material consumption and man hour. Delegate with site supervisor to prepare 3 weeks look ahead plan for material, consumable items, tools and manpower.
●Conducting task launch meeting briefing the installation process, safety measures, risk assessment, inspection and test plan as per the approved method statement.
●Conducting task launch meeting briefing the installation process, safety measures, risk assessment, inspection and test plan as per the approved method statement.
●Preparing and follow up all submittals for site inspection, material inspection and mock up inspection ensuring work has been completed adhering to project quality plan.
Procurement:
●Interfacing with Dept. Heads for mapping requirement of material, identifying & appointing a reliable vendor.
●Effectuating cost reductions through Indigenization of consumables & spares.
●Releasing purchase orders and delivery schedules.
Vendor Management:-
●Conducting negotiations with vendors for cost effective, timely supply of quality material.
●Consistent evaluation of vendor performance to ensure supply of quality material. Assessment of performance of the vendors based on various criterions such as quality improvement rate, timely delivery, credit terms etc.
●Proficient in handling sourcing & ensuring smooth flow of supplies through a strongly established vendor with a thrust on high & consistent supply performance.
Quality:
●Monitoring quality of inbound material to ensure adherence to pre-set specifications.
●Facilitating the implementation of ISO 9001:2000 Standards.
training & projects
●15 days special training in Electronics Research & Development corporation, Gurgaon on VLSI designing
●Designing of micro strip antenna
●PCB designing
●Project (P. C. based Oscilloscope)
●Final Project (Moisture measurement in paper).
PROGRAMMING LANGUAGE AND IT SKILLS
●Mat Lab Software
●Fortran Language
●C Language
●Familiar with Operating system MS Windows and Linux
EDUCATION
●B.Tech (D.C.E) Delhi University.
●Diploma in Engineering from Aligarh Muslim University, Aligarh
STRENGTHS
●Ability to work as an Efficient TEAM member & adaptable to any kind of environment.
●Hardworking, Self-confident, Sincerity & Eagerness to learn new things.
●Excellent communication and organization skills.
TARGET JOB
●Target Job Location– Domestic or International.
●Target Industry -EPC, consulting, research & developments projects, oil & gas
Projects, power projects, utility projects, ONG.
●Employment Type - Employee
●Employment Status - Full Time
●
PERSONAL DETAILS
●Date of birth : 15 January 1986
●Passport No : PP1112362
●Date of issue : 15/10/2015
●Date of expiry : 14/10/2025
●Place of issue : Kanpur
●Father’s Name : Mohd Rafiq
●Nationality : Indian.
●Residence Location : India
DECLARATION
DECLARATION:-
I hereby declare that the above furnished details are true and correct to the best my knowledge.