• Project Construction
1. Review of Construction plan design drawings for implementation, Review Employer’s Requirements
2. Review Method of Statement & Inspection Test Plan, Repair Procedure for construction works on power industry
3. Oversee structural erections and rigging activities of Boiler and Turbine equipment and structural
4. Close monitoring on Steam Turbine installation according to vendor procedure
5. Sea Water Flue Gas Desulfurizer erection/installation. Issue Non-Conformance Report or Site Surveillance Report
6. Monitor the site fabrication and erection of Boiler Pressure Parts and welding of boiler tubes
7. Close coordination with QA/QC department, attend daily & weekly coordination meetings
8. Attend weekly coordination meeting with EPC contractor for work progress and on-time target schedule
• Commissioning of Gas Turbine,Boiler & Steam Turbine
generator (Powerplant - Operation)
1. Operates Boiler & Steam turbines from test run up to normal operation
2.Gas Turbine, Boiler Cold & Hot Commissioning
3. Check & identify abnormalities of mechanical equipment both Boilers & Steam turbines scope
4. Trouble shooting of rotating/non-rotating equipment of identified issues like steam valves & pipe leaking, oil leaking, malfunctions of mechanical parts during commissioning period
5. Repair & servicing of identified abnormalities or damaged equipment integral parts
6. Provide recommendations for smooth operation
EDUCATIONAL ATTAINMENT:
Graduate of : Bachelor of Science in Mechanical Engineering (BSME)
From : University of San Jose Recoletos (USJ-R), October1978.
Masteral Degree : 6 units in Management Engineering.
Level 3 British English : Dudley Technical College, Dudley,UK Computer literate on different software’s such as Microsoft and other technical software’s.
GOVERNMENT ILLIGIBILITIES
Registered Mechanical Engineer Cert. No. 19703 dated 15 August 1980
Certified Cartographer Cert. No. 30320 dated 28 March 1979.
Incorporated Mechanical Engineer (IMechE) UK Reg. No.80141603
WORK EXPERIENCES
1January 1 2019 – Present
Venus Store (Owner)
Proprietor/Owner
Overall manage the establishment and do all the transaction of orders and stock of the convenience store and do manages the other duties and do the marketing of stocks requirement of the convenience store and supervise the workers.
2April 2018 – December 2018
Black & Vetch Philippines/EDCOP (Engineering Development Corporation of Philippines))
QA/QC Mechanical Engineer Inspector (Consultant
1x 500MW Mauban Coal Power Plant (Super Critical Power Plant Project)
Philippines)
As an owner engineer oversee the construction and installation of different packages such as the Boiler/Steam Turbine and Auxiliaries, BOP’s, Tank Farms, WTP and Plant services. Does the quality inspection and acceptance of the equipment installed and pre –commissioning. Oversee the piping spools fabrication at the subcontractor site of HP,IP,LP and other piping’s being fabricated for the site requirments and painting requirement’s and inspect all the QA/QC requiments prior to ship out to site...
3May 2017 –Jan 2018
Granite International Services/Field Core (GE)
Technical Field Adviser (TFA) (On Call Contract)
Philippines
Projects Assignment:
December 10 – December 19 (2018)
Mechanical Steam Turbine T/A (GE/Alstom)
Concepcion 1 Thermal Plant 1x150MW)
Ilo-ilo City, Philippines
Assigned during the shutdown and replacement of parts and maintenance during shutdown and re start of the plant and assistance of parts spare of consumables for the plant.
September 5 (2017 – October 20(2017)
Mechanical Steam Turbine T/A (GE/Alstom)
TVE (Therma Visayas 2x150MW) Fluidized Bed Power Plant
Toledo City, Philippines
May 2017 – October 2017(GE Oil/Gas)
TFA( Technical Field Adviser) Granite International Services
Mine Power Energy ( 3x55 MW Coal Power Plant) CFB Boiler Plant
4 February 2015 – March 2016
Site Mechanical Engineer/Commissioning Engineer (Owner’s Engineer)
Qaiwan Group (Bazyan Combine Cycle Project 750MW),Iraq
5 June 2013 - Jan 2015
T/A / Lead Commissioning Engineer, (Pahang Malaysia)
Industrial Power Technology
Technical adviser and Lead Commissioning engineer in Biomass power plant in Malaysia, In charge in plant commissioning and start-up.of 1x10MW power plant.
6 January 2013 - April 2013
Sr. Mechanical Engineer (Chana,Thailand)
2x1000MW Combine Cycle Power Plant Project (Siemens)
Marubeni Power
Role Supervisor/Team Lead
Supervised and overall in charge BOP installation in Water treatment Plant and composite piping works of the CCPP project in Chana 2 power plant CCPP.(2x1000MW)
7 July 2010 - June 2012
Planning Engineer (Tipton, Midlands UK)
Doosan Power System.
Industry Utilities / Power
Role R&D Engineer
Department Planner in development of new mythology in construction and fabrication of Industrial components for power plants and industrial plants.
8 April. 2009 - July 2010
Section Engineer /Planning Engineer
Doosan Babcock Energy Ltd, Renfrew, Scotland
SECTION ENGINEER
Drax Coal- Fired Power Station, 4000MW
( North Yorkshire, England. UK)
Dungeness B Nuclear Power Station, 1200MW
(Romney Marsh, Kent, England, UK)
Hunterston B Nuclear Power Station, 1100MW
( Largs, Ayrshire, West coast Scotland, UK)
Hinkley B Nuclear Power Station, 1100MW
(Bridgewater, Wales. UK)
Heysham 1 Nuclear Power Station, 1200MW
(Morecambe. North West coast England, UK)
Hartlepool Nuclear Power Station, 1200MW.
(Hartlepool, North East coast England, UK)
9 May 2007 – April 2009
Project Manager
Truba Arabia Engineering Co. (Jeddah, KSA)
Overall in charge in management and execution of project assign by the company, Conduct progress meeting with the project team and liaise with the client and their consultant for whatever changes of the work being done and other related matters
Project Undertaken:
Project Manager: KAAU CUP-2 Project (King Abdul Aziz University Central Utility Plant), Jeddah. Aug. 2008- March 2009
Support Project Manager : Shoiba Power Station Stage 2, 6x400MW Steam Power Plant LPO by Alstom Power, client Saudi Electric Company (SEC), Shoiba, Jeddah, May 2008- Jan. 2009
Project Manager : Najaran PP# 10 OCGTPP 1x 60MW (Client Saudi Electric Company, Frame 7FA (GE) (Fast Track Project) Sept.2007 – May 2008
Support Project Manager: Riyadh PP9 OCGTPP 10 x 60MW(Client Saudi Electric Company, Frame 7FA (GE) May 2007- July 2007’
10 July 2003 - April 2007
Project Site Manager (Thailand, Malaysia)
INDUSTRIAL POWER TECHNOLOGY PTE LTD
Project Manage:
1. JS Energy Co. 7.0MW Power Plant Jong Stit Industrial Park, Bang Bon Samut Sakhon, Thailand
2. MGP 10MW Rice Husk Fired Power Plant Surin, Thailand
3. FELDA Biomass 7.5MW PFB Fired Power Plant Lahad Datu, Sabah, Malaysia
11 Apr 2002 - Jul 2003
BUSINESS ADMIN. MANAGER
BABCOCK-HITACHI PHILIPPINES
Oversee plant operation of each department. Apply company quality standard of manufacturing. Assist the president in implementation of company guidelines. Act sometimes as project manager of projects being undertaken by the company.
12 Feb.2000 – Feb 2001
Turbine & Auxiliaries Commissioning Engineer, (Allepo,Syria)
Mitsubishi Heavy Industry, MHI Takasago
Duties: In charge in pre-com & commissioning works of Aleppo Thermal Plant 5x213Mw Steam Turbine generator and its Auxiliaries. Train client engineers & operator in standard operating procedure and safety of the plant equipments. Accomplishment: Completed all the testing and acceptance performance as per contract agreements.
13 Jan 1999 - May 1999
Mechanical Engineer (Singapore)
Kranji Sewage Treatment Works Phase III
KSTW-III, Ministry of Environment Singapore
EBARA CORPORATION, SINGAPORE
Duties: In charge in commissioning of Sludge Treatment Plant (STP) and its equipment, train client operators in process plant operations. Accomplishment: Completed in advance schedule due to good teamwork.
14 December 1995 – January 1999
Project Coordinator/Proj. Engr/Comm. Engr. (Indonesia, Malaysia)
Industrial Power Technology Pte. Ltd
Duties: Oversee company project in ASEAN region, Involved in the construction work from conception to post construction, commission the plant and train client operators. Accomplishment: Completed the task and testing of the plants for acceptance of the project.
15 February 1995 – December 1995
Boiler Commissioning Engineer (Singapore)
Ishikawajimaharima Heavy Industries IHI
Role Supervisor/Team Lead
Duties: Plan and schedule the pre-&commissioning work of 3x375MW Reheat Boilers and its auxiliaries, start- up and shut down, operation of the said units conduct testing, and other safety test of the equipment and to keep the plant in good condition prior to hand over to client. Accomplishment: Completed the schedule task of my work and contract
16 February 1994 – November 1994
Commissioning & Start-up Operator (Dubai, UAE)
Dubai Electricity and Water Authority (DEWA)
Duties: Responsible in site testing and commissioning, and operation of equipments such as WHRB,GT,Desal plant at Central control room DCS and on local site, and shutdown of units, conduct corrective maintenance during operation and shutdown, assist in plant training of operators. Accomplishment: Completed all job task and keep the plant in good operation prior to hand over to the owner.
17 September 1991 – October 1993
Power Plant Supervisor/Plant & Services (KSA)
ABV ROCK GROUP KB
Duties: In charge during installation and construction of the Diesel Power plant 10 units Deutz, and commission the plant and operation, maintenance and plant management, overall in charge of operating personnel during shift operation. Accomplishment: Keep the plant in good condition during operation and minimized the down time due to good maintenance to maximized plant utilization as per program. .Assigned in Plant Services department as OIC in the absence of Department Manager.
18 April 1987 – September 1991
Shift Charge Engineer (Phil.)
Ludo and Luym Corporation
Duties: Power plant operation in charge during shifting operation of the power plant, direct controls of all operators of the plant and to keep the plant in good condition to maximize the company production, to keep continuous power supply to the complex. Accomplishment: During my entire stint with the company only encounter minimum problem during operation due to proper operating procedure of the plant equipment and minimized shutdown. Reason for leaving: To work overseas and carrier advancement.
19 January 1984 – March 1986
Turbine Supervisor/Boiler Supervisor(Phil.)
Semirara Coal Corporation
Duties: In charge in the turbine plant section of the power plant supervised operators and technician under my shift and to keep the plant in good operation to maintain steady power supply to the mine complex. And to give decision in times of emergency. Accomplishment: Conduct study and improvement of the plant operation and some modification of process system to maximize the utilization.
20 January 1981 - December 1983
Mechanical Works Engineer
ERECTORS INCORPORATED(Phil)
AGUS V Hydro-Electric Power Plant Project 2x55MW
Duties: Involves in supervision of installation and inspection works of various mechanical equipment and check sub contractor accomplishment and check workmanship as per specification required. Check bill of materials and billings from contractors. Accomplishment: Done all the specific duties required to complete the project on schedule.
TECHNICAL TRAINING ATTENDED
1 MS PROJECT INTRODCUTION AND ADVANCE COURSES
Conducted By: Computer Training Solution, Birmingham UK
Date : 3-12 March 2010
2. HEALTH AND SAFETY IN THE ENGINEERING CONSTRUCTION INDUSTRY COURSE Module 4
Conducted by: Institution of Occupational Safety and Health (IOSH) with association with ECITB UK
Date : Oct. 27 to 30 Oct. 2009 Cert. No. 883523 Issued: 12 Jan. 2010
3. MANAGGING SAFETY IN THE ENGINEERING CONSTRUCTION INDUSTRY
Conducted by; Engineering Construction Industry Training Board (ECITB) UK
Date : 27 Oct. to 30 Oct. 2009
4. Government Scholar in Construction Management Development Foundation, CMDF, Training Programs for Plumbing and Pipefitting given by JICA, July 1986 to October 1986
5. Attended in Diesel Power Plant Operation Upgrading Program given by
CATERPILLAR, TRACTORS, Jeddah, K.S.A
Date : March 9 to March 10 1991
6. FAG SOUTH East Asia BEARING LUBRICATION AND MAINTENANCE SEMINAR
Conducted By: FAG SEA CORPORATION
7 SUPERVISORY UPGRADING SKILLS TRAINING PROGRAMS FOR SUPERVISOR
Conducted by: Semirara Coal Corporation and Don Bosco Technical College
Date : November 26 to December 1984
8. QUALITY CIRCLE LEADERSHIP COURSE
Conducted By: Semirara Coal Corporation, HRD
Date : March 9 to March 12 1985
9. SUPERVISORY DEVELOPMENT TRAINING PROGRAM
Conducted By: NMYC - WORLD BANK TRAINING PROGRAM
Date : October 22 to October 26 1985
ORGANIZATION AFFILIATED
1.Philippine Society of Mechanical Engineers (PSME)
2.American Society of Mechanical Engineers (ASME) (In Active)
3.Institute of Mechanical Engineer (IMechE) UK (In active)
REFERENCES:
1.0 Joshua A Johnson PE
Project Manager
Power Generation Services
BVI (Philippines) Corporation
Tel. No. +1-913-***-****
HP- +639*******
2.0 Anthony J. Czapracki
Site Manager
Black & Vetch (Philippines)
SBPL 500MW Supercritical Coal Power Plant
HP No.+639********
3.0 Eduardo Sabandal
Project Manager
Vicente Lao Construction
Cebu City, Philippines
Tel. No. +639*********
4.0 Jason Tan
Senior Project Director
Industrial Power Technology IPT
Singapore
HP - +659*******
DECLARATION
I declared that all the information mention on my resume are true and correct in the best of my knowledge and belief