Post Job Free

Resume

Sign in

Energy Center Ltd

Location:
Shimla, Himachal Pradesh, India
Posted:
April 21, 2022

Contact this candidate

Resume:

SATISH KUMAR

• A competent professional with **+ Years of qualitative & enriching experience in hydro power house installation,Ptw,Loto pre-commissioning,maintenance,site management & construction management upto 255 MW.

• An excellent performer with demonstrated troubleshooting aptitude in managing maintenance and breakdown of electrical panels, transformers, controls and instrumentation, switchyard, power and control cables etc.

• Adept at preventive and breakdown maintenance of various electro mechanical equipments.

QUALIFICATIONS :-

• B.E. in Electrical Engineering from Neptune Institute of Management & Technology- Delhi

• Diploma in Electrical Engineering from Govt. Polytechnic College Hamirpur (H.P.)

• Computer Knowledge - Operating System- DOS/XP/98/2007 Package-MS Office,MS Project

Organisational Scan:-

EMPLOYER: REGENT ENERGY LTD.

PROJECT: Rakchad SHEP 2*2.5 MW, Bhaba Nagar (Kinnaur), HIMACHAL PRADESH -INDIA

Duration: JULY. 2016- Till Date as PLANT MANAGER

Job Profile -

In this organisation, I demonstrated my skills in operations, maintenance,troubleshooting material/spare parts management and control of Rakchad 5MW HEP. I ensured process enhancement and simultaneously managed the safety, cost & quality parameters. I efficiently prepared planning & preventive maintenance schedule for all electromechanical equipments, transmission line (daily, monthly & yearly) & annual reports like generation,outage, inventory,etc.. Additionally, Ensuring all electro-mechanical equipment are working well by conducting timely checks/inspections and liaisoning with the state electricity board. Guide everyone related to operation and maintenance. Define and monitor operation goals to ensure maximum generation and availability of machines.

EMPLOYER: HIMACHAL HYDEL PROJECTS PVT.LTD.

PROJECT: TULANG 2*1.50 MW & KUREHD 2*2.25 MW CHAMBA (HOLI), HIMACHAL PRADESH -INDIA

Duration: Sept. 2015- Jul. 2016 as PROJECT INCHARGE

Job Profile-

In this organisation, I demonstrated my skills in operations management, maintenance, and control of Tulang 2*1.50 MW & Kurhed 2*2.25 MW.

I efficiently coordinated with testing commissioning team and simultaneously ensured process control. I handled the electrical equipment erection,cable laying and termination work.

I ensured process enhancement and simultaneously managed the cost & quality parameters. I efficiently prepared monthly maintenance & annual reports.

EMPLOYER: SODHI BROTHERS HYDROPOWER PVT.LTD.

PROJECT: BRAHL, SHAHPUR (KANGRA), HIMACHAL PRADESH -INDIA

Duration: Oct. 2012- Sept. 2015 as Electrical Shift Engineer

Job Profile-

In this organisation, I demonstrated my skills in operations management, maintenance, and control. I efficiently prepared monthly maintenance & annual reports. Additionally, I inspected all electro-mechanical equipment and maintained turbine (two jet Pelton), generator, transformer, 33 KV switchyard, and transmission line etc.

Short Term Training Course For "In-Service SHP Plant Engineers" on Real-Time Digital Simulator For SHP Plants at Alternate Hydro Energy Center, Indian Institute of Technology, Roorkee.

EMPLOYER: ALSTOM PROJECTS INDIA LTD.

PROJECT : Bujagali Hydro Power Project, Uganda - 255 MW.

Duration : Dec. 2011 – Sept. 2012 as Erection Engineer (Electrical)

Job Profile-

Here, I demonstrated expertise with erection management for the electrical installation of the hydroelectric project. I maintained effective coordination & control for electrical equipments erection,cabling and termination (power & control). I prepared test procedures & records for the electrical system.

During my stint with the organization, I coordinated with Bujagali Energy Ltd. and Salini Costruttori for testing of the BOP. I handled the overall co-ordination for pending erection issues ]-that was essential for final commissioning of projects. I efficiently handled queries and arranged for modifications to ensure successful project completion through effective coordination. I handled the erection of both the earthling grid of power station as well as the equipment earthling. I ensured the proper execution of the work efficiently and safely.

EMPLOYER: LANCO INFRATECH LTD.

PROJECT : IKU-II., DHARAMSHALA, HIMACHAL PRADESH –INDIA

Duration : July 2007 - Dec. 2011 as Assistent Engineer (E & M)

Job Profile:-

Erection, Testing & Commissioning of Electrical equipment such as Transformers,HV & LV indoor Switchgear, Cables, Control & Protection System, DC System,

UPS, DG set, HT Motors, Generators, Overhead Transmission Lines and Switchyard

Equipment.

Co-ordination with Testing & Commissioning Team.

Responsible for Erection and Commissioning Activities.

Handling of Cable Laying and Termination work.

Erection of 6.5 km. 33 kV Transmission Line.

Erection & Commissioning of 11/.415 KV Pole Mounted Substations.

Maintenance of 4 X 5 MW HEP IKU-II, BANER-III, DRINIDHAR, UPPER KHAULI.

Operation of 5 MW HEP IKU-II

Preparation of Daily Generation Reports.

Inspection of all Electro-Mechanical Equipment.

Personal Details:

Name: Satish Kumar

Fathers name: Jagdish Chand

Date of birth: 06-02-1987

Gender: Male

Language Known: English, Hindi

Nationality: Indian

Passport No. : Z6422270

Permanent Address: Vill. Kanjwin, P.O. Kharwar, Tehsil Bhoranj, Distt. Hamirpur, Himachal Pradesh, India – 176041

E-MAIL : adqueh@r.postjobfree.com (Skype)

adqueh@r.postjobfree.com

Contact No. É : +91-981*******, 981-***-****



Contact this candidate