Kevin Roeder
Phoenix, AZ
***********@*****.***
OBJECTIVE
To obtain a challenging position in a large competitive company with lots of room for advancement. WORK EXPERIENCE
March 2022 – Present
Honeywell
Production Technician
• prepare, operate, and maintain equipment, generally in production. September 2019 to October 2021
GE Healthcare (Manger – Marty)
Production Associate
• Testing & building portable scanners and electronic & electro mechanical products September 2017 to July 2019
Sensata
Mechanical Assembly
• Mechanical assembly of aluminum cart fixtures used for mounting testing equipment.
• Strip wires from 2awg - 18awg.
• Cut polyurethane tubes to length.
• Make sub-assemblies: called purified clean air dryers.
• Assembled: extreme heat and blow freezing test fixtures.
• Assembled hi power chassis, used for semiconductor temperature test.
• Test: High pressure PSI testing & forced testing of clean air dryers. August 2015 to July 2017
GE power (Manger: Pableo)
Mechanical Assembler
• Assembly of high-voltage sensors and columns used internationally and National.
• Built variety of field safe equipment chassis used in cabinets.
• Cut and label soldering wires for boards on temp sensors in high voltage columns & sensors.
• Mechanical assembly and subassemblies.
• Soldering of cable harnesses and boards.
• Back panels front panels and large field safe cabinet wiring. October 2005 to August 2008
Honeywell
Assembler Associate II
• Assemble, test, calibrate, and trouble-shoot Pressure Transmitters for the Field Solutions Regional Distribution Center.
• pick and pack Specialty Transmitters.
STMicroelectronics, Inc
June 2004 to September 2005
Manufacturing Technician
• Operation of multiple (tools) machines from numerous areas.
• Conducting Photo-clean and thickness of wafers on equipment for production.
• Program and organize tools for production.
March 2004 to October 2004
Premier Semi-Conductors
Quality Assurance Inspector
• Package and conducted QC inspection of end products for shipments.
• Organize blueprints and certifications from production floor.
• Handle shipping process, data entry, shipping labels, UPS and inventory control. January 2002 to February 2004
St. Jude's Medical Center
Operational Tech 3
• Hybrid assembly of pacemakers and heart valves.
• Preparation and assembly of conductive and non-conductive epoxy concentrate.
• Quality control; checking sub-straights for bridging and off-line components.
• Analyzing merchandise orders and blueprints for new production dates and new procedures. September 1996to December 2002
Honeywell/EFTC
Associate II
• Handling and transfer of aerospace products from stockroom to production line.
• Shipping and receiving on cycles requirements.
• Auditing of materials before production and material control in stockroom and production floor.
EDUCATION
Greenway High School
May 1991
SKILLS & ACCOMPLISHMENTS
• Proficient in Oracle, Mapper, AIMS, Windows and other Microsoft Office applications
• Experience with multiple shipping programs and capable of manipulating small objects with use of microscope.
• Operation and testing of electrical units, components, wafers, etc.
• Trained in HOS including Waste Observation (the 7 Wastes), 5S, Rapid Problem Solving and Visual Management.
- Completed all required Safety and Quality.