FIRST NAME
LAST NAME
Everett, Washington 98208
Tel: 425-***-****
Socheathkinh@ Gmail.com
Skills Summary
Production, AED Machine Assembly, operator assembly
EDUCATION
Marine High School Graduated on June, 1997
200 120th St SW,
Everett, Washington 98204
Everett community college
Successful completed
Basic Hand- on soldering Training Assembly (1.6 CEUS
4/14/2018 16 hours/ 1.6 CEUs
Experience
Trident sea food company 05/04/2010 To 02/15/2019 swing shift
1930B W Merrill creek parkway
Everett, Washington 98203
Supervisor: Bill Williams Johnson 360-***-****
Lead: Leonida Escalicas 425-***-****
Production: metal detect/Feeder inspection is: Check blood spots bruises scales off color
Visible bone visible parasites flesh under board placement on board is upright good window coverage/ natural fillet shape minimal board showing packages integrity day code correct natural initial supvr verify day coding bags, flexible and able to work as groups and capable of working in a multitask environment
Trident sea food company 02/19/2019 To 08/02/2019
1930B W Merrill Creek parkway
Everett, Washington 98203
Supervisor: Hong Liu 425-***-****
Lead: Marie Finks 425-***-****
Key person or lead assistance
Do paperwork and use computer to print label and domino printer turn on the computer looking for computer EVT23708 looking for work groups, bartender labels, label formats, restore and then type the item number like hot smoked and Nava production and difference kind of production this paper print labels, and domino printer, 1 Perishable case up, domino printer perishable search item number, domino C-600 printer 1 properties auto detect domino C-600 printer 2 properties and fine fill name typing number one on printer domino C-600 printer 1 and typing number two on the print domino C- 600 printer 2 and do package
Alex Tsu site manager philips RIS
22100 Bothell Everett High Way
Bothell, Washington 98021
425-***-**** or 503-***-**** C
Alex ***@***********.***
Randstad- philips/AED/ bothell 08/07/2019 To 7/16/2020
Assemble AED machine
UnCONFIG: has four station of assembly
Station 1- scan serial #PO number of the unit inspect top enclosure and put on/ off button, I information button, shocks button, put PCA board on to slat and mouth with screws plus dogs
Station 2- scan serial # Po number of the unit add speakers, peepers and connect wires to PCA board. Install foam for protection on PCA
Station 3-scan serial #po of the unit.connect bundle of wires accordingly to AP
Assembly procedures untie two wires one blue and red prepare it for future test
Station 4- scan serial # po number of the unit verify all station is done scan PCA serial # and reprint serial label place on parts. Connect power cable into the PCA board, cover back enclosure secure screws
Station 5- scan serial #po number on shop floor and scan serial number on the unit. Fat perform functional
CONFIG: is code load- Testing language per unit. Each test last 1-2 minutes
Button test- Testing all button on the Unit.
Station 2- scan serial #po number of the unit. Sim use; operator test the unit, press shock
Button three times and I- button three times. If unit failed, report failure
Station 3- scan serial #po number of the unit. Label philips local, install foam pads, and put back label
Station 4-scan serial #po number of the unit.put instruction book, case, and unit place in tray pass on to QA inspection and put on the pallet
Adecco staffing: Ashoka Singh 1-952-***-**** fluke
19401 40th Ave W Set 270
Lynnwood,Washington 98036
Adecco- fluke: Assembler/ operator 08/17/2020 to 10/21/2021
T5 Cell assembler: performing Ohms zero: one when a test is not running. Press the setup button step three: press the Ohms zero button. Test takes 5 minutes setup four press go on button
Setup potting machine for turn on press the eyes button until you see 1.89g than press enter button than the green button. Turn off press the eye button until you see the question
Than press enter button
Remove R coil from bar. Load empty bar into coil winder. Let the machine run
Load knob in press install O- ring apply super lube. Apply super lube to two locations. Load top case in press load détente onto pin to center pin. Cycle press and confirm detent fully inserted. Load coil into top case. Load push button
Remove unit from potting machine, load new unit into potting machine.
Solder: place a flex circuit down on the bench and sol4 comp coil through holes posts and solder 2 two more connect the flex circuit to the solder tester cable
Assembler two: remove the film from the housing display window and blow out and debris visually inspect the display for dirt, burns, scratches and any other blemishes. install mask, place LCD in top case, install foam, install PCA screws one, install connector screws two install LCD flex circuit cable, apply super lube to battery connect pads, install unit model decal, Lead assembly
Assembler three: build another back case for the next unit, by installing the positive and place negative battery connect in the back case housing, install back case assembly, install serial number decal, scan unit and place into lead press. Cycle press using the two finger controls. Verify that the unit passes the vision test
Install calibration sticker load into calibration test station follow on the screen prompts to adjust the pots, install two batteries into units, install battery foam pad onto battery door, install back case screws two, install battery door, install battery door screws, install probes red and black except for Bluk,
Final test station : load unit into test station connect leads to test station follow on screen prompts
Fluke company 10/25/2021 to now
9028 Evergreen Way,
Everett Washington 98204
Ops. Manager Bryce Olive 425-***-****
Ops. Manager Chris Cardozo 425-***-****
Team leader : Tho Troung
Team leader: Alyssa McClain
T5 Cell assembler: performing Ohms zero: one when a test is not running. Press the setup button step three: press the Ohms takes 5 minutes setup four press go on button
Setup potting machine for turn on press the eyes button until you see 1.89g than press enter button than the green button. Turn off press the eye button until you see the question
Than press enter button
Remove R coil from bar. Load empty bar into coil winder. Let the machine run
Load knob in press install O- ring apply super lube. Apply super lube to two locations. Load top case in press load détente onto pin to center pin. Cycle press and confirm detent fully inserted. Load coil into top case. Load push button
Remove unit from potting machine, load new unit into potting machine.
Solder: place a flex circuit down on the bench and sol4 comp coil through holes posts and solder 2 two more connect the flex circuit to the solder tester cable
Assembler two: remove the film from the housing display window and blow out and debris visually inspect the display for dirt, burns, scratches and any other blemishes. install mask, place LCD in top case, install foam, install PCA screws one, install connector screws two install LCD flex circuit cable, apply super lube to battery connect pads, install unit model decal, Lead assembly
Assembler three: build another back case for the next unit, by installing the positive and place negative battery connect in the back case housing, install back case assembly, install serial number decal, scan unit and place into lead press. Cycle press using the two finger controls. Verify that the unit passes the vision test
Install calibration sticker load into calibration test station follow on the screen prompts to adjust the pots, install two batteries into units, install battery foam pad onto battery door, install back case screws two, install battery door, install battery door screws, install probes red and black except for Bluk,
Final test station : load unit into test station connect leads to test station follow on screen prompts
789X Cell: place instulator on main PCA align insulator slots on top of fuse holder. Where shown. Place 2 fuses on main PCA remove previously tester board from kernel station place new assembly board into kernel station scan barcode to start test place the following items in the back light assembly fixture mask.
LCD orient letters such that they are towards top of back light unit elastomeric quality 2 place in slots of back light. Verify that all parts are installed properly in back light assembly fixture,
load board on top of the back light assembly fixture. Details place finger on circled button to place knob into top case nest cavity &apply. Lube as place top case & prepare RSOB assembly install RSOB connect in fixture as shown,
install RSOB housing as shown. Place finger on button to activate press perform quality check to make sure all connect are firmly seated & are flat. Against surface of housing to activate press for firm seating apply lube in between spring détente. Install PCA assembly on top case assembly. Install bottom shield shock absorbers 2 gold screws install energize battery
, install door on unit half turn fasteners & serial number. Press & hold the hold button while the unit is off switch the unit into the V position while contacting to hold the hold button look for defects. Install accessory mount& tilt stand. Check for details before applying decal us alcohol wipe around terminal for cleaning if needed apply top case decal.
Pack out- has model like 789/E/ RS/ CWG & 789 SPX has 789B/ WWG place insert ROHS, Reference, Safety Guide, IEC card, 1 Scan Unit, install accessory/mouth/ tilt stand, 2 pack unit and accessories into white display container and insert into Pop-box 3. Once weight passes, continue to build next unit while the label prints 4. When you have next unit build, return to step 1-4 label for previous unit label and packaged into multipack container
T6 Cell has model like 600, 100, 100PRO
T6: performing Ohms zero: one when a test is not running,press the setup button
Step three: press the Ohms zero button. Test takes 5 minutes, step four: press go on button
Setup potting machine: for turn on press the eye until you see 1.89g than press enter button than the green button. Turn off press the eye button until you see the question? Than press enter button
Assemble one load the coil winder ( refer to the winder instruction) and lower the door. The wind will being spooling coils. When the coil machine has completely stopped, open the top, unwinds the left and of the coil and tape in the market locations
Solder: is insert comp coil, into the two slots shown, posts pointing. Place a main coil into the top the ends of the coil positioned as shown, place the flex strip, between the main coil and the housing. Place the strip inside of the opening so that it lay down into a position so the comp coil posts pass through the strip through holes and lays flat assemble comp coils, main coils and flex strip into the second top housing, solid 4 comp coil through holes posts and two main coil wires. The 2 main coil wire must cross making an X, connect the flex to the solder tester cable.
Place the soldered and tested unit into the potting machine. The machine will automatically start when your hands have cleared the safety sensors.
When the potting cycle has finished the become solid green, place the potties Unit on the swip lane remove the housing top from the front of the swip lane.
At the button station, place a gasket on a button and grease with the peddle feeder in 6 marked locations, peel back the screen protector and check for scratches and blemishes. Place any scratches front cover in the red nonconforming bin. Replace the screen protector and continue. Place the button in the fixture and set a unit top over the button
Remove the film from the housing display window and blow out any debris. Visually inspect the display for dirt, burns, scratches and any other blemishes
Inspect and install a keypad contact ( gently pressure ensuring that the contact is inserted but not flattened at all) probe connectors, place a contact insert, into the unit top in the position and apply grease with the foot peddle isn’t two place, using both hands, place your finger in the button press fixture. So that two tops are produced, install the Ribbon cable from the coil into the PCA. Insert the test Lead, make sure the tab is up, the metal lead contact should be inserted into the metal sleeve inside of the lead assembly
Build the bottom case, Two spring should be positioned as shown in the two photo, place the bottom case shield, for T6 PRO, into the unit and press it in place with a nut driver tool, (2:places)
Install the top shield connect, place the bottom and press down. If the green light comes on, the parts have been inserted correctly, place a T6 unit in the the holding fixture and adjust the lead so that the they are on either side of the wedge, to activate the press, place a thumb in each of the start button and hold them there until the press finishes its cycle
Take a battery door and the battery door flex circuit Install the flex circuit through the slots in top of the battery door and place it as shown in the photo. Line up and install the flex circuit to top surface of the battery door fold the flex circuit in two locations,
Install 2 batteries, into the unit with the +( positive) terminal towards the top of the unit, place two screws into the locations as shown above, place the battery door on the unit and fasten the door using a screws, put a serial number label in the pocket on the left fork turn the unit on. If the unit comes on, begin calibration/ adjust. If the unit does not come on place it in the failure bin (cal Err message is okay) Scan the serial number and place the unit into the fixture, face down,
Final station: scan the serial label on the back of the unit at one of the final stations final. Statins are the test stations with a blue lead and the black lead into the black hands onto the sensors pads. One finger from each hand onto press automatically beginning after the unit completed
Type of Award:
Certificate of inspiration Fluke
Presented to Soc Moeuy
For inspiring Alyssa McClain
Thank you for your willingness to help training new associate. Your flexibility and
making 100% plus productivity in multiple cells.
Award Build extraordinary teams
March 23; 2022
Certificate of inspiration Fluke
Presented to Soc Moeuy
For inspiring
Huy Luu
Thanks good team work
Award inspiring
December 24, 2021
Certificate of inspiration Fluke
Presented to Soc Moeuy
For inspiring
Mariah Martin
You are an excellent trainer a great team member. You help everyone out in the Cell and make sure we all are doing what we need to do. You’re awesome!
Award build extraordinary teams December 28, 2021
Type of Award / Award Description
Are you president of your fraternity or sorority, head of the condo board, or a team lead for your favorite charity? You’re a natural leader–tell it like it is!