Post Job Free
Sign in

Power Engineer Electrical

Location:
Palestine, AR
Posted:
April 17, 2022

Contact this candidate

Resume:

Contact Information:

Gaza Strip-Gaza

Phone Mobile: +970*********

E-mail: ********@*******.***

********@*****.***

Ahmed Mohanna

(MEP PROJECT MANAGER)

Personal information:

Material status: Married

Sex: Male

Nationality: Palestinian

Birthday: 26th November, 1979

Place of birth: Dair el Balah, Gaza strip-Palestine

Driving License: Available

Residences status: Resident of Palestine -Gaza Strip Deir El Balah

Education

Work experience

Organization, Period & position

Organization, Period & position

Organization, Period & position

Organization, Period & position

1997-2002

B.Sc. in Electrical Engineering, Islamic University –Gaza

Palestine

18 year (14 years in United Arab Emirates &4 years in The Palestine)

1-Arison Gulf (MEP ) Abu Dhabi,UAE Oct 18th 2018 till Nov 1st 2020

MEP Projects Manager

2- ENVICON EMIRATES (MEP division) .Al Ain,UAE -Oct 1st,2010 to Oct 17th 2018

MEP Project Manager

3-Orion Company, RAK, UAE - Oct 1st,2009 To Oct 21st,2010

MEP Projects Manager

4-Al Ali Construction Company (L.L.C), RAK, UAE - June 1 st,2007 To Sep 1st,2009

MEP project Engineer

Project Handed Over

Organization

LANGUAGES

Computer Skills

Training Courses

Refereces

Duties & Responsibilities (Electrical, Plumbing, Telecom, Fire alarm,HVAC, Firefighting and Low current system) :

1. Estimate for the new project and prepare the BOQ when required.

2.Electrical and Low current system designed where required

3.Supervise for installation of hardware and software for pumping (Sewerage, Irrigation, lifting and Water) station include SCADA.

4. Submit a technical submission, Catalogue and data sheet for the materials which required for the project and coordinate between a Vendor and consultant to get approval.

5. Arrange a shop drawing for the project.

6. Make required plane for the project to execute the work from start to end ( Man power, Machines, Tools,Materials and work procedures ) .

7.Order the materials required to the project specially long delivery items .

8.Prepare all required documents such as MS(Method statement),ITP (Inspection test plan),QCP (Quality control procedure),JSA (Jop safety analysis)

9.Aware and Trained for all safety procedure such as Work at height, Confide space,Excavation,First Aid and Firefighting and implement it in the site and ensure its applied in the site.

10.Manage all the site works activities during start to handing over.

11.Ensure and follow up with engineers that the work was executed as project specification,BOQ and contract document .

12.Follow up with consultant and the client to handed over the project.

13.Prepared monthly bill and statement for the completion works.

14.Interact with local authorities and consultant to get approval for shop drawing where required.

15.Attend consulting and client meeting for technical inquires and issues

16.Manage the job for all other subcontract which required to the project

17.Prepare daily/monthly report for high management about work progress.

18.Where require raised technical inquiries for a missing conception between drawing and the site.

19.Good experience for Installation for Cathodic Protection for Piles/Pile caps and buildings

20.Aware of civil defense, Etisalat and ADDC/FEWA/DEWA rules and specifications .

21.Closing the project after handing over to the client.

22.Where required making MEP design drawings.

Oil Field : A. Upper Zakum 750 Island facilities (AD)

B. ASAB FFD (AD)

Infrastructure : A. North Al Wadi (Al Ain)

B. Widening of E-10 Al Shahama highway (AD)

Government Project : A. Central Prison (RAK)

B. Al Wathba Pumping Station ( Abu Dhabi)

C. Al Saddiyat Sewerage, lifting, Irrigation Pump Station (Abu Dhabi)

Villas : A. Sheika Shamsa Private Palace ( AL Ain)

B. 163 Villas Al Shuiba (Al Ain)

C. Al Sherwai Villas (RAK)

Buildings : A. G+M+15 Hilton Double Tree Hotel (RAK)

B. G+P+16 Building (RAK)

C. G+M+12 Conrnich Building (RAK)

D. G+M+6 building (RAK)

Industrials : A. Al Habtoor motors Showroom(RAK)

B. UTICO Water Filtration Factory (RAK)

C. Al Hoty Srainger (RAK)

D. HEXXA Factory (RAK)

E. Candian factory (RAK)

Ministry of Energy and Natural Resources – Gaza –Palestine

June 1st, 2003 April 20, 2007

Electrical Power Engineer-shift supervisor in Substation (220KV / 22KV)

Duties:

1.Worked in Project department for Erection of EHV substations from 22kv, 66kv & 220kv that includes preparation of Estimates, Tenders, Supervision of Erection works, measurements & recording of bills of contractors.

2.The engineering management to all devices/equipments which used in the substation, such as feeder 22 KV.

3.Prepare daily report & follow up the power load status for the electrical networks.

4.Follow up & supervise Maintenance works & reinstall existing feeder.

5.Reinstall all transformer and networks in the black out case.

6.Coordinate other electrical works with the for auto transfer generation and distributions department.

7.Prepare full inspection report to all switch yard and switch gear devices

8.Prepare routine test and check for all used device

9.Re-design & prepare all necessary works for the changing/auto-transferring in the power generation and distribution network.

10.Supervise installation of the protective special devices for the high and medium voltage.

Mother Language: Arabic reading and written

Second: English reading and written

1. Knowledge in the Multimedia program like Flash, AutoCAD, Photoshop, Math lab and so on.

2. Good usage the windows, Word, Excel, Power Point, MS Project and SPSS.

3.Knowledge in the computer networks

4.Knowledge in some computer language like C++, C and assembly

5. Knowledge in the Internet.

6. Good tipper in the work program.

September 2013

Subject :Electricity Wiring Regulation

Abu Dhabi Distribution Company

July 02, 2012- August 15, 2012

Cambridge Institute (UAE)

Subject: Project Manger Professional (PMP).

June 18, 2015- August 24, 2015

Ministry of Electrical and Energy (EYGPT)

Subject: Monitoring and supervision of the Combined Cycle Power Planet and Distribution Network.

Dec. 7, 2004- Jan.09, 2005

American –Mideast Educational and Training Services Gaza

Subject: English Language level 7 & 8.

August 28, 2004- September 29, 2004

Palestinian Engineers Association

Subject: AutoCAD ( 2D)2002

Jan. 1, 2004- Dec. 31, 2007

Palestinian Engineers Association

Subject: Basic of Leadership & Management

Nov. 24, 2002- Jan. 16, 2003

Community service & Continuing Education deanship

Subject: Test of English As a foreign Language ( TOEFL)

Have a ADEWA electrical engineer certification

Have a FEWA electrical engineer certification

Have a Civil Defense license as Fire alarm engineer

Upon request

Period

Position Held



Contact this candidate