Post Job Free

Resume

Sign in

Power Plant Manager Construction

Location:
Mumbai, Maharashtra, India
Posted:
April 16, 2022

Contact this candidate

Resume:

*.MAHAMAHAVIR PRASAD SHARMA

*.): **-* Mobile No- 00-919*********~*: adqsv5@r.postjobfree.com

3.,: Flat Flat no-B-401, Plot no-3, Sec-46A, B.P.C.L.Co-OP Hsg .Society Nerul New Mumbai – 400706

4.

5. A dyn

6.Career Objective:

To obtain a position of responsibilities Power Plant Construction / Erection/ Commissioning / Operation that utilizes my skills and experience and keen to work in an environment where I can enrich my kowledge.

7.Education:

No

Degree/ certificate

Institute

Year

1.

Certificate course in Piping Engg.

Indian Institute of Technology (Bombay)

1998

2.

B.E.. Chem. Engg.

The Institute of Engineers (India Calcutta)

1993

3.

Boiler Operation Engg.

U.P. Boiler Board (Kanpur) U.P.

1984

4.

Diploma in Mech. Engg.

U.P. Technical Board (Lucknow) U.P.

1975

8.Work Profile:

Have built an eclectic profile over a span of 40 years and played a pivotal role in Project Construction/

Operation and Maint. Engineering; Industry - Crude Oil Refinery/ Paper/Sugar Industry

-Have been Construction Manager of Gas Based Power Plant i.e. 35 M.W. (G.E USA Make) Power Generation

with High Efficiency Boiler, Steam Pressure 18 KG/ cm2 & Steam Temp.380 Degree Centigrade.

-Have been In-charge of Twenty Turn Around of Refinery Power plant / High Efficiency Boilers / FCCU

Co- Boiler & Hydrogen Plant Reformer Boiler / D.M, Plant & Waste Water Treatment Plant.

2015- 2022

- Joined M/s Saga Global Consultants as Site Project Head at Monrovia Liberia for Fabrication/

Erection/ Testing/ Commissioning of Crude Oil Product Terminal at Freeport, Monrovia, Liberia,

Capacity- 60 TMT, consisting 2X6900 m Tanks on MOGAS, 2X7300 m Tanks on GASOIL, 1X3200

m Tank on HFO, 1X26000 m Tank, 1x 10000 m3 Fire Water Tank and all other associated

facilities i.e. Fire water Pumps / DGSet / Control room ect, Prepaired Procedure / Check list for

smooth commessioning .Ddelivered safety training to local Engineers/ Operators.

- Worked at KOC Kuwait for the commissioning of their Chemical Tank Farm .

- Presently Working at M/s ONGC URAN Distt. Raigad New Mumbai as a Project Management

Consultant on the Modernization of their ETP Unit( A 150 Crore Project ) being constructed by M/s

Suez Water Treatment Company.

2012 – 2014: Sr. Manager Projects (CDU – 4): Bharat Petroleum Corporation Ltd:

Worked as Sr. Manager Projects in Bharat Petroleum Refinery’s (installed capacity 12 MMTPA) New State of Art, Integrated Crude and Vacuum Distillation Unit, Designed to process 6.0 MMTPA by M/s. Engineers India Ltd. The project cost being 1489 Crores.

In charge of Fabrication / Erection/ Commissioning of CDU-4 Project Steam Generator / Heaters / Columns / Fabrication/ Erection / Testing of all I.B.R H.P / L.P Steam/ Condensate lines & Other Pipe lines around One Lakh Seventy Five Thousand Inch Meter including Sea Water Cooling Tower & its associated Pumps/ Pipe lines.

2007 - 2012 :Manager CPP /DM Plant/ Waste Water Treatment Plant:Bharat Petroleum Corporation Ltd:

Worked as Manger Captive Power Plant consisting Three G.E Make CO- Generation Gas Turbine, Total Power Generation 75 MW & High Efficiency Boiler 3900 MT/Day Steam Generation, Steam Pressure 18 KG/ cm2 & Steam Temp.380 Degree Centigrade / DM Plant 200 M3/ Hr X 3 Units/ Waste Water Treatment plant, design capacity - 120x2 - 240 M3/Hr.

Major Contribution made in WWTP for treated this water & supplied to Refinery cooling towers, Ensuring net water savings of 2 crores per year. & conferred “Certificate Of Excellence “Award from Chairman & Managing director of BPCL

2003 - 2006 : Refinery Shift Supt.: Bharat Petroleum Corporation Ltd:

Worked with top management for evolving strategic vision, generating new ideas, bringing change and taking the enterprise performance and productivity to the next level. Proved efficient, effective and accountable in high-profile executive roles with an ability to make high stake decisions under pressure.

In-charge of Refinery and lead emergency situations such as power failure, accident, flooding, fire call, until the Senior Management arrival on the site. Apprised the senior management with regular, prompt and relevant technical data. Formulated evaluation reports in the course of refinery visits and recommended timely, effective corrective measures. Formulated evaluation reports in the course of refinery visits and recommended timely, effective corrective measures .Produced regular reports for a discussion with the top management.

2001 - 2003 : Manager Construction at CPP & FCCU: Bharat Petroleum Corporation Ltd:

Have been Manager construction of Gas Based Co- Generation Power Plant i.e. 35 M.W. G.E Make Frame 6 i.e. Control system Mark-6 “E “ Supplied by G.E. USA. & its High Efficiency Boiler, Steam Pr.18 KG/ cm2 & Temp.380 Deg.Centigrade .PMC was Engineers India Ltd

In charge of Revamp job of FCC CO- Boiler (HRC USA Make) Capacity 60 Ton/ Hr. Pressure -38 Kg/ Cm2 Temp -360 Degree Centigrade & 1.5 MW Back Pressure Steam Turbine (BHEL Make).

1997 - 2001 : Dy. Manager Construction of Hydrogen /HCU Unit: Numligarh Refinery(Assam):

Supervised Erection/ installation / commissioning of Hydrogen unit (HTAS); capacity: 38000 MTPA and Its Reformer Boiler capacity 1000 MT/ Day Steam Pressure 18 Kg/ Cm2/ Temp. 380 Deg. Cent.with

Its IBR HP Steam/ LP Steam/ Condensate Pipe line Fabrication/ Erection/ commissioning. Played a significant role in commissioning of Hydrogen unit along with its Reformer Boiler and its GTR.

1994 – 1997: Dy. Manager Construction /Ops. DHDS /MMPL: Bharat Petroleum Corporation Ltd:

Actively involved in the Erection / commissioning of DHDS unit along with Hydrogen unit Reformer Boiler Capacity 1000 MT/ Day, Steam Pressure 18 Kg/ Cm2 & Steam temp 380 Degree Centigrade. Identifying hook site, Checking G.A. drawing, Equipment plot, Isometric/ Fabrication Erection of IBR HP / LP / Condensate pipe lines .

Supervised and mentored team of 30 People in Fabrication /Erection/ commissioning of MMPL Pipe line / Main & Intermediate Pump House of 6MMTA Capacity, Mumbai-Manmad Pipe Line. Operation in charge of Main control room & its Pumps capacity 650 M3/Hr at 65Kg/ cm2& 18 - Inch Dia. and 250 Km

1992 – 1994 : Dy. Manager Construction /Ops: Nigerian National Petroleum Corporation Nigeria:

Managed and supervised a team of 15 people in the Fabrication/ Erection/ commissioning of High Pressure Boilers (Pressure - 110 Kg/ cm2, capacity - 80 Mt/ Hr); Condensing steam turbine (15 Mw) Responsible for interaction with M/S ABB Team for Erection / commissioning of Utilities units.

1985 – 1992: Construction Officer FCCU : Bharat Petroleum Corporation Ltd:

Involved in the Erection/ Commissioning of of F.C.C. CO-Boiler (HRC USA). Capacity 60 Ton/ Hr . Pressure -38 Kg/ Cm2 Temp -360 Degree Centigrade & 1.5 MW Back pressure Turbine BHEL Make.

Checking G.A. drawing, Equipment plot, Isometric/ Fabrication Erection of IBR HP / LP / Condensate pipe lines .

1982 – 1985 : Asst. Engineer Construction /Operation/Maint: PAMWI Speciality& Tissue Papers, (H.P.):

Involved in the Construction / Erection / commissioning & Operation /Maint of Boilers four number Capacity 7 ton / Hr & Pressure 10Kg/cm2 make LIPI Boiler Poona, DM Plant Effluent Treatment Plant

1977 to 1982:Asst Engineer Operation/Maint : Meerut Straw Board Mills (Meerut U.P.):

Operation / Maint In charge in shift in their Three nos Coal Fired Boilers Willcock & Babcock Make Capacity 20 Ton /hr.18 Kg/cm2 Pressure& 380 Degree Centigrade Temperature & six nos Baggase fired Boilers Pressure 10 kg/ cm2 & 180 Deg Centigrade temp. and was responsible for the handling of 100 people & smooth and efficient Operation of the Straw Board mill, capacity 25 MT/ Day

1976 to 1977 : Apprentice Engineer: Jaswant Sugar Mills (Meerut U.P):

Inducted as Apprentice Engineer in Jaswant Suger Mills Meerut U.P., Crushing capacity - 1250 TPD

9.Awards/ Recognition:

-Got Letter of Recognition from Manager Power Plant & Utility Mr.ENGR.OBARIASE, E.A.WARRI REFINING & PETROCHEMICALS COMPANY NIGERIA .

-Got Letter of Recognition from DGM Maint for working in various Refinery Shut Down & DGM Training for in house faculty In Training Center.

10. Other details:

Date of Birth: November 18, 1954

Nationality: Indian.

Marital Status : Married

Passport number : : N5368573



Contact this candidate