Post Job Free
Sign in

Civil Engineer Site

Location:
Cairo, Cairo Governorate, Egypt
Posted:
April 15, 2022

Contact this candidate

Resume:

Name: Ahmed Sherif Mohamed

Position:

Site supervision consultant civil engineer

Technical Office Engineer

Q.S. Engineer

Years of Experience: 6

Education:

PMP preparation course at RTC (55% of the course). Speak English Professionally: In Person, Online & On the phone course at Georgia Institute of Technology (Coursera self study, 80% of the course). F.E. preparation at Georgia Tech University (Coursera self study, 65% of the course). BSc Civil Engineering –2017.

Computer Skills:

AutoCAD

Photoshop

InDesign

Revit

SAFE

SAP2000

Primavera P6

Office (Word, Excel

and Power Point)

ETABS

Languages: Arabic, English

Email: ************@*****.***

Project Experiences:

Date

Position Company Country

Project Name

(Owner)

Sector

From Till

6/2021 now

Site supervision

consultant civil

engineer

+Q.S.

+Planning

ECB EGINEERING

CONSULTING

BUREAU

Egypt

The Origin Of New

Urban Communities

High-Mast

Columns, Roads

And Landscape

works

Project Description:

High-Mast Columns, Roads And

Landscape works of The New

Administrative Capital as a consultant

of owner (The Origin Of New Urban

Communities).

Responsibilities:

Supervision the implementation of eleven companies.

Write inspection reports and technical reports for stakeholders.

Quantity surveying.

Ensuring all materials used and work performed for different civil works (piles, necks, foundations and hardscape) for the following mega projects as a

consultant of owner (The Origin Of New Urban

Communities) at The New Administrative Capital.

High-Mast Columns: Supervision of (Elsewedy

Electric T&D) and (The Egyption Company-Zaky

Elsewedy) as an estimated cost 400 Million L.E.

Road And Landscape works: Supervision of

(Emak For Contracting-Al-kharafi), (Hassan Allam)

and (Elmelagy) as an estimated cost 350 Million L.E.

Landscape Works: Supervision of (Al-Marasem

International_Binldin Group), (Ahandasya)...etc as an estimated cost 340 Million L.E.

11/2020 6/2021 R.E. Consultant

Dr. Mohamed

Rashwan

consultant office

(Deen of Assiut

Engineering)

Egypt

The Ministry Of Local

Development

Sanitary Vault,

Steel

Constructions,

Infrastructure,

excavation,

Backfilling and

Rouds.

Project Description:

Sanitary Vault that established on

an area of 30 feddans, consisting

of filly finished administration

concrete buildings, steel

constructions, Sanitary, Rouds,

excavation and Backfilling; cells

and lakes as an estimated cost 27

Million L.E .

Responsibilities:

Site supervision Consultant Engineer

Included site supervision, Comparing the

drawings with B.O.Q. within and according to

project specifications framework.

Write inspection reports and site instructions.

Submit methods of state.

Prepare & attend coordination meetings with

stakeholders.

Ensuring all materials used and work

performed for different civil works for the

following mega project as a representative of the

consultant of the main contractor (Arab

Organization For Industrialization) Under

supervision of (Arab Academy For science,

Technology And Maritime Transport) as a

representative of the general consultant (The

Ministry Of Environment):

Sanitary Vault at Eldakhla,Egypt. a large

scale project that established on an area of 30

feddans, consisting of filly finished

administration concrete buildings, steel

constructions, Sanitary, Rouds, excavation and

Backfilling; cells and lakes as an estimated cost

27 Million L.E .

3/2018 2/2021

Site Engineer

Planner; Time

Controller

Engineer

FreeLance various

with:

( EL_DEEP For

Construction,

Foxxx pools,

Zahraa Helwan and

Elmostafa)

Egypt

Various:

(Engineering

Authority Of armed

Forces, Zahraa

Helwan and Misr

Italia)

Educational,

Swimming

Pools,

Residential and

Resorts.

Project

Description:

Gardinea

Compound school,

Zahraa Naser City.

Five educational

buildings in

addition to a theater

and olympic

swimming pool.

EL_GALALA

Resort, El_sokhna

Execute of four

swimming pools at

EL_GALALA

Resort 5 in addition

to three swimming

pools with a large

lake at Resort 6.

Zahraa Towers,

helwan two

residential tower

buildings within

1400-1800 m2 for

every one.

Eight residential

projects

Kai Resort,

El_sokhna, Egypt.

a large scale

residential villas

and chalets -my

scope in Zone A&G

EL_DEEP For Construction

Job title : Time controller Engineer

Duties : included preparing time schedule and some quantity surveying for every civil and finishing items, coordination with other disciplines such as civil, Arch., HVAC and electricity works.

Foxxx pools

Job title : Site Civil engineer

Duties : preparing site arrangements and site excution for constructions, sanitary, steel structure, isolation, testing and finishing of EL_GALALA Resort project. Zahraa Helwan

Job title : Site Civil engineer.

Duties : Execution, quantity surveying and evaluation of civil works and simple finishing of two tower projects with value engineering.

.

Helwan Towers

Job title : Site Civil & Tichnical Office & Design Engineer Duties :Design, quantity surveying, evaluate and excution of eight residential tower projects.

Ensure of safety,time and economice meet the desired results at works. Almostafa

Job title : Planner Time Controller Engineer &Civil Engineer. Duties: Civil works & responsible for ensuring that they are issued on time, prepare time scheduling and updates for every Activity by coordination with other disciplines for Kai Resort project.

- under supervision of consultant (ECB) Engineering Consulting Bureau

- (The owner was Misr Italia).

6/2016 3/2018

Site civil

+Technical Office

EGYBUILDERS

Egypt

The Origin Of New

Urban Communities and

The Ministry Of Youth

And Sports

Steel

Constructions

and Concrete

Building

Gardinea

Compund

a residential

building Project as

470 m2 net area at

Naser city, Cairo,

Egypt.

Fouge Al_Abar

steel project which

contains trucks

concrete ramps,

slabs on grade, six

steel Hangers, two

concrete buildings

in addition to

finishing works.

The Plastic

Factory and it’s

workshop at El-

salam City:

Steel works, slab

maintenance and

finishing works.

\

The New Refinery

Building, Saphola

Factory, north of

Suez city at project

of Afia

International

Company.

Suez Stadium

Swimming Pool

project:

Implementation,

maintenance and

finishing works.

Water Tanks

project At a farm in

Egypt-Ismailia

Desert Rd.

The Store Of

Medicine, New

Cairo.

Job title :

Site execution engineer

Duties :

included site execution, managing and quality control for each activity; civil, interior and exterior finishing items in addition to evaluation for different projects.

Execution of civil and finishing works.

Bill of quantity works.

Bill of quantity and execution of steel and concrete constructions.

Manage all teams of contractors at installation and maintenance.

Plane and follow up performance rates.

Ensuring all materials used and work performed for different civil works meet specifications and high level performance.

•:

Implementation survey works, hydraulic works and tank design.

Implementation of iron doors and windows with a ramp in addiction to finishing works.

Various

Technical office: estimation, scheduling duration, direct costs, cash flow and updating contractor statements at EGYBUILDERS’s office. 2011 2015 Trainee

Arab Contractors company

C.C.C. company

Turath For Contracting

Arab Contractors Company

Egypt Various

Deep

Foundation

and Medical

Roxy Parking

project with in

1500 m2 area and

four levels under

ground.

Nile Corniche

Project ”Qatar

Rest House” with

more than 153m

high.

at Dar Eloyon

Hospital project

at 6th Of October

City, a villa at

Beverly Hills and

ather villa project

at the Royal City

Compound

At Engineering

Unit

Arab Contractors company 2015

Learned UP And Down method.

Learned implementation of

Diaphram Walls and Piles.

C.C.C. company 2015

Learned about Safety, Management

and finishing works at the higher

tower in Egypt.

Turath For Contracting 2013

Learned finishing works in addition

to conversion from the architectural

system to the construction system

using AUTOCAD.

Arab Contractors Company at

Engineering Unit

Learning types of tunnels and

techniques of execution.

Training of AUTOCAD and SAP2000

programs.



Contact this candidate